DEVELOPMENT PROJECT
VENDOR NAME:
REVIEW DOES NOT CONSTITUTE ACCEPTANCE
DYNAC SDN BHD
OF DESIGN DETAILS, CALCULATIONS, TEST
METHODS OR MATERIALS DEVELOPED OR
SELECTED BY VENDOR NOR DOES IT RELIEVE VENDOR
FROM FULL COMPLIANCE WITH CONTRACTUAL OR PACKAGE DESCRIPTION:
OTHER OBLIGATIONS.
HVAC SYSTEM
AEI
PTSC M&C
SVDN-WHP-M-0010 D01 0004 02
IGP
VENDOR DOCUMENT
COMMENT RESPONSE SHEET
05-1_EPC-GE-PTC-Q-PR-00116- Vendor Data Review Procedure Rev.D1 Appendix 6
Key:
C1 – Accepted.
C2 – Accepted, Proceed with work, Incorporate comments and Resubmit.
C3 – Not Accepted, Revise and Resubmit.
C4 – For information only.
8 GA Drawing Add weld note for weld frame structure together Comment incorporated.
Page 1 of 2
Continuation Sheet
9 GA Drawing Diameter of hole bolt and type of bolt used. Comment incorporated.
10 GA Drawing Type of lifting lug (plate thickness, type of weld) Comment incorporated.
Page 2 of 2