You are on page 1of 2

OMAN TANK TERMINAL COMPANY (OTTCO)

PROJECT: RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)

COMMENTS RESOLUTION SHEET

Document No: 9686-8330-47-820-4574 Rev: 06


CENTRAL CONTROL BUILDING & LABORATORY (820-CCB01) - ENLARGED
Document Title: Doc. Class: 2
WALL SECTIONS
CONTRACTOR Transmittal No: 9686-TR-CPP-10015 Date: 01 Apr 2021
Comment Sheet No: CRS_9686-8330-47-820-4574_05 Date: 04 Apr 2021
Document Status Code: Code 1 – Rejected; CONTRACTOR to revise and resubmit; Code 3 – No Comments;
2
Code 2 – Comments as Noted; Code 4 – Noted for information;

CONTRACTOR Response COMPANY Decision


Sl. COMPANY Comments (Identify Date: 11 Aug 2020 (Rev 03) Date: 26-Aug-2020 (Rev 03)
No. Section/Page/Paragraph) Date: 31 Mar 2021 (Rev 04) Date: 03-Apr-2021 (Rev 04)
Date: 04 Apr 2021 (Rev 05) Date:07-Apr-2021 (Rev 05)
Rev A1
Comments not closed unless the detail issued. Noted and incorporated with detail dwg. Noted
1.
number.
Update notes accordingly - only general notes and Noted and incorporated Noted
2.
related to this sheet shall be presented
Preliminary representation shall be obtained from Noted and incorporated Noted
3.
structural engineer
4. Detail? Noted and incorporated Noted
Not matching with the details in the mentioned Noted. A new detailing for Architecture Noted
drawing railing will be developed under standard
5. detail drg number.9686-8330-47-000-4517.
The same has been referenced in this
revision.
Rev B1
No comments & Signatures shall not be kept in the Date: 31Jul-2019 (Rev B1) Date: 21-Aug-2019 (Rev B1)
6.
AutoCAD dwg file. Noted and incorporated Noted
Rev 01
No Comments Date: 30 Jan-2020 (Rev 01) Date: 03 Feb-2020 (Rev 01)
7.
Generally revised for columns, grids Noted

524481820.docx Page 1 of 2
OMAN TANK TERMINAL COMPANY (OTTCO)

PROJECT: RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)

COMMENTS RESOLUTION SHEET

CONTRACTOR Response COMPANY Decision


Sl. COMPANY Comments (Identify Date: 11 Aug 2020 (Rev 03) Date: 26-Aug-2020 (Rev 03)
No. Section/Page/Paragraph) Date: 31 Mar 2021 (Rev 04) Date: 03-Apr-2021 (Rev 04)
Date: 04 Apr 2021 (Rev 05) Date:07-Apr-2021 (Rev 05)
HVAC room, battery room, electrical room,
Airlock & building coordinates ,etc.
Rev 02
No Comments (CODE-3) Date: 19 Apr 2020 (Rev 02) Date: 27-Apr-2020 (Rev 02)
No Comments, all are closed, however, the Noted.
8.
Drawings number has typo error which has
resolved in this revision.
Rev 03
No Comments (CODE-3) Date: 11 Aug 2020 (Rev 03) Date: 26-Aug-2020 (Rev 03)
No Comments, all are closed; however, the Noted.
9. Drawings has generally revised due to
changes in Electrical Room raised floor and
HVAC room trench.
Rev 04
No Comments (CODE-3) Date: 31 Mar 2021 (Rev 04) Date:01-Apr-2021 (Rev 04)

No Comments, all are closed; however, the All cement/concrete surfaces above false
10. Drawings has revised for Wall plastering ceiling shall be provided with Brushbond
height above false ceiling with respect to or black bitumen as anti-insects/bacteria.
STD, FQ, NCR and discussion and (TYP)
concurrence from Company representative.
Rev 05
Brushbond or black bitumen (TYP) Noted and incorporated Noted.
11.

Reviewed by: ____________

Approved by: ____________

524481820.docx Page 2 of 2