Doc N o : E S - 9 9 . 0 0 .

0 5
Basis Engineering Design
Data (BEDD) Rev : D2

Page : Cover

PTT Public Company Limited

Document No.

ES-99.00.05

BASIS ENGINEERING DESIGN DATA (BEDD)

D2 ISSUED FOR ITB GSP 7 Richuta P. Prasopchok N. Attaphon M. 26 Aug 20


D1 ISSUED FOR ITB GSP 7 Richuta P. Prasopchok N. Attaphon M. 20 May 20
Quality
Issued
REV. DESCRIPTION Prepared by Checked by Approved by reviewed
by date

ES-99.00.05 BEDD_D2
PTT PUBLIC COMPANY LIMITED

GAS SEPARATION PLANT RAYONG

PROJECT SPECIFICATION FOR

BASIS ENGINEERING DESIGN DATA (BEDD)

ES-99.00.05

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 2 OF 30
(BEDD) ENGINEERING STANDARD REV D2

CONTENTS

SECTION SUBJECT

1.0 General

2.0 Basis Engineering Design Data

2.1 Project Description


2.2 Applicable Codes, Standards, Government acts etc.
2.3 Climatic data
2.4 Utilities
2.5 Heat Exchangers
2.6 Mechanical Equipment
2.7 Civil Engineering
2.8 Piping
2.9 Instrumentation
2.10 Electrical
2.11 Protective Cover
2.12 Safety Facilities
2.13 Shipping Facilities

APPENDIX A: UNIT OF MEASUREMENT

APPENDIX B: FUEL GAS CHARACTERISTICS

APPENDIX C: LNG CHARACTERISTICS

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 3 OF 30
(BEDD) ENGINEERING STANDARD REV D2

1.0 GENERAL

The purpose of this standard is to provide the basis technical information


requirements for engineering and design of New Unit or Plant.

The plant will be constructed in the location near PTTLNG Terminal 1, Map Ta
Phut Industrial estate in the Rayong province.

2.0 BASIC ENGINEERING DESIGN DATA

2.1 Project Description

2.1.1 Client PTT PUBLIC COMPANY LIMITED

2.1.2 Plant Location MAP TA PHUT, RAYONG, THAILAND

2.1.3 Units: Refer to ES-99.01 Numbering System

2.1.4. The System of measurements shall be SI units to ISO 31 and ISO 1000. For
details see attachment A.

2.2 Applicable Codes, Standards, Government Acts, and Local Authority Regulations

2.2.1 The latest revision of PTT’s Engineering Standards shall be applicable.

2.2.2 Government Acts, Regulations applying on general basis refer to ES-91.04 HSE
Legislation.

2.2.3 Design and construction shall conform to the latest edition of the basic codes
and/or regulations listed in Project Specification.

2.2.4 Code and Standard Precedence

Area of conflict between relevant code and standard shall take the following order
of precedence to determine the actual requirements.

a) PTT’s Engineering Standards

b) Thai Standards and Statutory Regulations

c) US and International Codes and Standards

The information given in each of these standards shall be used in conjunction


with all the other listed standards. Thai Standards and Statutory Regulations shall
apply if more onerous then the others.

2.2.5 The Design Life of Equipments. Design life shall be in accordance with the
following;

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 4 OF 30
(BEDD) ENGINEERING STANDARD REV D2

Equipment Life

Columns, drums and reactors 20 Years


Heat exchanger shell, 20 Years
Channel, Tube sheets
Heat exchanger tube 10 Years*
Pumps 10 Years
Compressors 10 Years
Heater tubes 10 Years
Atmospheric tankage 20 Years
Piping Material 15 Years
Other package 10 Years
* for corrosive service

2.2.6 The Minimum Corrosion of Equipment. Minimum corrosion allowance shall be in


accordance with the following table unless note otherwise in the Project
Engineering Standard;

Equipment Corrosion allowance


Vessel Vessel/Equipment Vessel/Equipment
Equipment Internal Internal (fixed)
shells (removable)
Columns, drums, reactor and
heat exchanger1
 Non-corrosive, carbon 3.0 mm 1.5 mm 6.0 mm
steel and low alloy
 Corrosive, carbon steel 3.0 mm 1.5 mm 6.0 mm
and low alloy
 Corrosive stainless None None None
steel
Pump and compressor 3.0 mm
casings, cast iron
Tubes of fired heaters/waste
heat recovery units
 Carbon steel and low 3.0 mm
alloy
 Stainless steel None
Piping Refer to piping
spec.
Tanks
 Non-corrosive, carbon 1.5 mm
steel and low alloy
 Corrosive, carbon steel 3.0 mm
and low alloy
 Corrosive stainless None
steel

Note 1: Corrosion allowance for non corrosive, carbon steel and low alloy heat
exchangers shall be 3.0 mm (TEMA Class R)

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 5 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.3 Climatic Data

2.3.1 Wind

Refer to ES-40.05 Wind and Earthquake loading

2.3.2 Air Temperature

Maximum recorded 42.0 C2


Minimum recorded 11.0 C3
Design Dry Bulb 40.0 C
Minimum design temperature 15.0 C1
Design wet bulb (all applications) 28.5 C
Mean 28.2 C
Daily Mean (Max.) 32.7 C
Daily Mean (Min.) 24.8 C

Notes:-
1. For gas turbines
2. For electrical equipment
3. For normal min temperature design case.

2.3.3 Relative Humidity

Mean Maximum 93 %
Mean Minimum 51 %
Extremes Minimum 17 %

2.3.4 Rainfall

Average annual 1401 mm


Maximum recorded in 24 hours 193 mm
Design rainfall 104 mm/hour for 15 minutes for
drainage system

2.3.5 Snowfall-none

2.3.6 Barometric Pressure

Design 1021 mbar


Maximum 1021 mbar
Minimum 1000 mbar

2.3.7 Solar Heat

Mid-day Solar heat flux, maximum 949 W/m2

2.3.8 Atmosphere

a) Extreme moisture (tropical climate) TROPICAL CLIMATE


b) Marine exposure (salt spray) MARINE ENVIRONMENT
c) Sand storms NONE

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 6 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.3.9 Miscellaneous Site Data

a) Frost Level NONE


b) Thunderstorm Frequency SEASONAL (Daily May to Oct)
c) Sandstorm Frequency NONE
d) Temperature Inversion Occurrence DATA NOT AVAILABLE

2.3.10 Seismic design code

The zone of seismicity for the proposed plant is defined as ZONE 1.

2.4 Utilities

2.4.1 Water

2.4.1.1 Filtered raw water

Supply source: GSP 7 Filtered water system


User: Utility stations, potable water and Demineralized water plant

Operating Conditions

Minimum Operating Maximum


Pressure, bar g. 4.0 6.0 7.3
Temperature, C 25.0 28.0 30.0

Mechanical Design Conditions

Pressure, bar g. 15.0


Temperature, C 55.0

Quality

pH 6.0-9.0
Turbidity Max. 10.0 NTU
Electric Conductivity Max. 136 microsiemens/cm
Total dissolved solids Max. 132 mg/l
Alkalinity
 Alkalinity - Phenolphthalein 0 mg/l CaCO3
 Alkalinity - Total 50 mg/l CaCO3
Chloride Max. 18 mg/l Cl
Calcium Max. 20 mg/l Ca
Magnesium Max. 1.5 mg/l Mg
Hardness Max. 56 mg/l CaCO3
Organic-N Max. 1.3 mg/l N
Ammonia-N Max. 0.4 mg/l N
Phosphate Max. 0.23 mg/l P
Sulfate Max. 35 mg/l SO4
Nitrate Max. 1.5 mg/l NO3
Dissolved SiO2 Max. 19.5 mg/l
Dissolved oxygen Max. 8.6 mg/l
BOD Max. 4 mg/l
Iron
 Iron - Dissolved 0 mg/l Fe
 Total Max. 0.6 mg/l Fe

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 7 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.4.3.2 Demineralized water

Supply source: GSP 7 ECO-CURE Package


User: Make-up for Amine Solution in AGRU, ERU and tempered
cooling water

Operating Conditions

Minimum Operating Maximum


Pressure, bar g. 3.0 4.0 5.0
Temperature, C 25 28 30

Mechanical Design Conditions

Pressure, bar g. 9.0


Temperature, C 55

Quality

pH 6-9
Turbidity < 0.1 NTU
Electrical Conductivity ≤5 s/cm
Total Dissolved Solid ≤ 0.6 mg/l
Sodium ≤3 mg/l
Potassium ≤3 mg/l
Total Iron ≤ 0.6 mg/l
Cu ≤ 0.05 mg/l
Silica ≤ 0.2 mg/l
Resistance Chlorine Nil
Chloride ≤1 mg/l

2.4.3.3 Potable water

Supply source: GSP 7 Filtered water system


User: Safety shower and sanitary in building

Operating Condition

Minimum Operating Maximum


Pressure, bar g 1.0 3.75 4.75
Temperature, C 25 28 30.0

Mechanical Design Conditions

Pressure, bar g. 5.6


Temperature C 55

2.4.3.4 Tempered Cooling Water

Supply source: Demineralised Water system


User: Various rotating equipment to be cooled down and lube oil skid

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 8 OF 30
(BEDD) ENGINEERING STANDARD REV D2

Operating Condition (Supply)

Minimum Operating Maximum


Pressure, bar g. 4.0 4.9 5.4
Temperature C 28 45 55

Operating Condition (Return)

Minimum Operating Maximum


Pressure, bar g. 0.5 1.5 1.5
Temperature C 28 55 62

Mechanical Design Conditions

Pressure, bar g. 12.5


Temperature C 80

Fouling factor 0.00035 m2 K/w


pH Value 6.0-9.0

2.4.3.5 Fire Water

Supply source: Firewater is supplied from the equilibrium pond.

Operating Conditions

Minimum Operating Maximum


Pressure, bar g. 8.0 14.0
Temperature C AMB

Mechanical Design Conditions

Pressure. bar g. 17.0


Temperature, C 60.0

2.4.4 Air

2.4.4.1 Utility Air

Supply source: GSP 7 Air Dryer Package


Users: Distribution to utility stations

Operating Conditions

Minimum Operating Maximum


Pressure, bar g 6.0 6.9 7.6
Temperature C 50 52 52
Dew Point Less than 5oC @ 8.3 barg
Less than 0oC @ atm
Oil Free

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 9 OF 30
(BEDD) ENGINEERING STANDARD REV D2

Mechanical Design Conditions

Pressure bar g. 10.0


Temperature C 77

2.4.4.2 Instrument Air

Supply source: GSP 7 Air Dryer Package


Users: Distribution to instrument

Operating Conditions

Minimum Operating Maximum


Pressure, bar g 6.0 6.9 7.6
Temperature, C 50 52 52
Dew Point Less than 5oC @ 8.3 barg
Less than 0oC @ atm
Oil free

Mechanical Design Conditions

Pressure bar g. 10.0


Temperature C 77

2.4.5 Nitrogen

Supply source: Supply by Nitrogen Supplier


Users: Utility stations and various users

Operating Conditions

Minimum Operating Maximum


Pressure, bar g. 3.0 5.5 6.0
Temperature, C 7.0 28.5 50.0
Purity Less than 1000 ppmO2

Mechanical Design Conditions

Pressure, bar g. 9.0


Temperature, C 75.0

2.4.6 Fuel

2.4.6.1 MP fuel gas

Supply source: GSP 7 Sales gas header or OCS4 Sales gas header
User: Gas Turbine fuel system

Operating Conditions

Minimum Operating Maximum


Pressure, bar g. 43 43 43
Temperature C 41 41 52

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 10 OF 30
(BEDD) ENGINEERING STANDARD REV D2

Mechanical Design Conditions

Pressure, bar g. 61
Temperature C 77

2.4.6.2 LP fuel gas

Supply source: MP fuel gas system or HP off-gas from AGRU or Flash gas from
Feed Gas Chilling Unit or Regen Gas from Dehydration Unit or
Overhead vapour from Fractionation Unit.
User: Hot oil burners fuel gas skid, Regenerative Thermal Oxidizer
(RTO), and flare purge/pilot.

Operating Conditions

Minimum Operating Maximum


Pressure, bar g. 4.5 4.5 4.5
Temperature, C 34 51 54

Mechanical Design Conditions

Pressure, bar g. 6.7


Temperature, C 125

2.4.6.3 Fuel gas Characteristics is shown on appendix B.

2.4.7 Hot Oil

Source: GSP 7 dedicated Hot Oil with Heat Recovered from GTGs and
Hot Oil Burners (direct fire)

Users: High High Temperature Hot Oil User


High Temperature Hot Oil Circuit Users.
Low Temperature Hot Oil Circuit Users.

Operating Conditions

High High Temp High Temp Hot Low Temp Hot


Hot Oil Oil Oil
Supply Return Supply Return Supply Return

Pressure, bar g. 5.32 3.49 7.41 3.49 3.45 1.7


Temperature, C 270 170 220 170 170 130
Remark: The operating pressure refer to grade elevation

Mechanical Design Conditions

High High High Temp Low Temp


Temp Hot Hot Oil Hot Oil
Oil
Pressure, bar g. 20 24 24
Temperature, C 295 250 250

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 11 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.4.8 Cold Propane

Source: Propane Product from Fractionation Unit or Propane Sphere.


User: Make-up for closed loop Cold propane system and supply to propane
uses in Dehydration unit, Fractionation unit and Ethane Treating unit.

Operating Conditions (Supply)

Minimum Operating Maximum


Pressure, bar g. 9.9
Temperature, C -20.0
Operating Conditions (Return)

Minimum Operating Maximum


Pressure, bar g. 4.5
Temperature, C 5.9

Mechanical Design Conditions

Pressure, bar g. 26.5


Temperature, C 70 / -45

2.4.9 Liquid Natural Gas (LNG)

Source: PTT LNG


User: ERU Unit (Inlet Gas Chiller and DeC2 Feed Sub-Cooler), Fractionation
Unit (DeC2 Condenser) and Cold Propane Condenser

Operating Conditions

Minimum Operating Maximum


Pressure, bar g. 90
Temperature, C -150 -130.0

Mechanical Design Conditions

Pressure, bar g. 128


Temperature, C 65/-175

LNG Characteristics refer to Appendix C.

2.5 Heat Exchangers

2.5.1 Shell and Tube Exchangers -

2.5.1.1 Shell and Tube exchangers shall be designed in accordance with Engineering
Standard ES-20.21 Heat Exchanger.

2.5.1.2 The maximum preferred tube lengths shall be 6100 mm.

2.5.1.3 The limitation on removable bundle diameter shall be: 1600 mm.

2.5.1.4 The limitation on removable bundle weight shall be: 20 tonnes.

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 12 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.5.1.5 The fouling factors shall be Water side 0.00034 (W/m2oC)-1


Unless specified otherwise by Licensor.

2.5.1.6 The preferred tube pitch refers to process data sheet.

2.5.2 Air Coolers

2.5.2.1 Air cooled exchangers shall be designed in accordance with Engineering


Standard ES-20.22 Air Cooled heat Exchanger.

2.5.2.2 The design air inlet temperature shall be 40 oC dry bulb unless specified
otherwise on the Process Datasheet.

2.5.2.3 The minimum ambient temperature shall be 15 oC dry bulb.

2.5.2.4 Fans shall be forced draft type unless specified otherwise on the Process
Datasheet.

2.5.2.5 The preferred tube lengths for Air Coolers shall be 9144 mm or 12195 mm.
2.5.2.6 The preferred tube sizes for air coolers shall be as API661 or other.

2.5.2.7 Winterising is not required.

2.5.2.8 Accelerometer type vibration transmitters shall be provided instead of


conventional vibration switch.

2.5.2.9 Minimum requirement of structure column size and quantity shall be H200, 6
columns per bay or H200, 4 columns per bay provided vibration is designed in
accordance with Engineering Standard ES-20.22, Air Cooled heat exchanger.

2.5.3 Waste Heat Recovery Units

2.5.3.1 Waste Heat Recovery Unit shall be designed in accordance with Engineering
Standard ES-20.14 Waste Heat Recovery Unit.

2.6 Mechanical Equipment

2.6.1 Pumps, Compressors and Turbines

2.6.1.1 Pumps, compressors and turbines shall be specified in accordance with


Engineering Standard listed below.

- ES-30.00 General Requirements for Machinery


- ES-30.01 Centrifugal Compressor
- ES-30.02 Gas Turbine
- ES-30.06 Lube Oil and Dry Gas Seal System
- ES-30.08 Centrifugal Pump for Process Service
- ES-30.09 Centrifugal Pumps for Utility Service
- ES-30.15 Centrifugal Compressors For Utility & Instrument Air

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 13 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.6.2 Pressure Vessels and Tankage

Welded Unfired Pressure Vessels

a) Engineering Standard ES-20.01 Vessel Standard shall be applied for


Pressure Vessel Design.

b) Engineering Standard ES-20.02 Quality requirement for Pressure Vessel


shall be applied for Pressure Vessel Fabrication.
2.6.3 Tankage

2.6.3.1 Engineering Standard ES-20.06 Field-erected low-pressure storage tank shall


be applied for low-pressure storage tanks Fabrication.

2.6.3.2 Engineering Standard ES-20.05 Spherical Storage Tanks shall be applied for
Spherical Storage Tank design.

2.7 Civil Engineering

2.7.1 Site Preparation

Site shall be prepared and levelled by CONTRACTOR. Site Preparation shall be


in accordance with site preparation drawings prepared by the contractor.
2.7.2 Soil Conditions

2.7.2.1 A soils report to be informed later.

2.7.2.2 Foundation design:

Foundations shall be in accordance with Engineering Standard ES-40.09 Design


of Concrete Foundations Structures or ES-40.11 Design of Machine Foundations.

2.7.2.3 For piles:

Type & size, capacity, maximum uplift and lateral resistance shall be refer to Soil
Report.

2.7.2.4 Type of foundations:

a) Major equipment, buildings and structures: Concrete foundation

b) Minor equipment, pipe supports : Concrete foundation

2.7.3 Paving/Water Run-Off/Sewers

2.7.3.1 a) Paving shall be provided in process area (Concrete paving), control


building and substation area (Concrete paving), Maintenance area
(Concrete paving), Product storage (Concrete paving) ,slope protection
(concrete paving) and/or as identified on conceptual plot plan.

b) Access ways shall be concrete paved.

c) Run-off design factors are in accordance with Engineering Standard ES-

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 14 OF 30
(BEDD) ENGINEERING STANDARD REV D2

40.13 Drainage Design.

d) Roadways shall be paved to the following Engineering Standards ES-40.12


Specification for Road and Paving.

2.7.3.2 Surface drainage systems shall be designed in accordance with Engineering


Standard ES-40.13 Drainage Design.

2.7.3.3 The following drainage systems shall be provided:

 Strom Drainage

 Oily Water Drainage

 Sanitary Sewer

 Close Drain system

2.7.3.4 Additional sloping of grade shall be provided in fire risk areas.

2.7.3.5 Sewer pipe shall be designed in accordance with Engineering Standard ES-40.13
Drainage Design.

2.7.4 Waste Treatment Facilities

2.7.4.1 Waste treatment facilities are to be provided as follows:

Type Waste Exiting Partially To be provided


by PTT by CONTRACTOR

Oily [ ] [ ]

Sanitary [ ] [ ]

Chemical [ ] [ ]

Other [ ] [ ]

2.7.4.1 Waste water from Deminerization water system and Raw water filtering system
shall be treated to meet PROJECT SPECIFICATION by Waste treatment
facilities.

2.7.5 Unit Elevation

2.7.5.1 Site preparation elevation to be confirmed by CONTRACTOR.

2.7.5.2 High Point of Paving (HPP) for different areas is to be determined by the
CONTRACTOR based on survey data and requirements for access and drainage
of site. HPP shall be referenced to the PTT Plant Datum and agreed with PTT.

Plant design elevation shall be considered as high point of paving and equal to is
0.000 m.

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 15 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.7.5.3 Minimum height for top of foundations above high point of paving shall be per
Engineering Standards ES-40.12 Specification for Road and Paving.

2.7.6 Structural Materials

2.7.6.1 a) Structural material shall be in accordance with Engineering Standard ES-


40.07 Structural steelwork design.

b) Deleted

2.7.6.2 In general, elevated walkways and platforms shall be Galvanized Grating.


Checker plate shall be used where only specify by PTT.

2.7.6.3 Pipe supports shall be in accordance with Engineering Standard ES-50.01 Piping
Supports.

2.7.7 Buildings

2.7.7.1 Buildings shall be in accordance with ES-40.03 for Architectural Specifications:

2.7.7.2 Air conditioning shall be provided for the control house, substation, Analyser
houses, Laboratory and Muti-purpose facility building.

2.7.7.3 Pressurising is required for the substation, control building and Analyser houses

2.7.7.4 Not used

2.7.8 Security

2.7.8.1 Perimeter fencing type chain link diamond mesh or wire net fence mesh shall be
provided. “For wire net fence mesh type, CONTRACTOR shall submit details to
PTT/Consultant for approval”

2.7.8.2 Area fencing is required as shown on conceptual plot plan.

2.7.8.3 Security guard house shall be provided including security facility e.g. ID card
identification machine etc. Main gate with traffic shall be polished stainless steel
sliding gate.

2.7.9 Road shall be design per requirement specified in ES-40.12 Specification for
Road and Paving.

2.8 Piping

2.8.1 Piping shall be designed in accordance with the edition plus Addenda of the
ASME/ANSI Code for Pressure Piping: Chemical Plant and Petroleum Refinery
Piping, ASME/ANSI B31.3 and other sections which apply as listed below in
remarks:

2.8.1.1 Piping shall be designed in accordance with Engineering Standard


- ES-50.01 Piping Arrangement
- ES-50.02 Piping Material
- ES-50.03 Piping group & Equipment space
- ES-50.04 Underground Piping work

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 16 OF 30
(BEDD) ENGINEERING STANDARD REV D2

- ES-50.05 Piping layout


- ES-50.06 Fabrication Inspection and Testing of Piping and other applicable
standard.

2.8.1.2 Not used.

2.8.1.3 Severe Cyclic Service Lines

ASME/ANSI B31.3 requires the designer to identify those lines subject to severe
cyclic conditions. These conditions exist where SE exceeds 0.8 SA and the
equivalent number of cycles exceeds 7000; or where other conditions will produce
an equivalent effect.

These lines shall be identified on line classification list by CONTRACTOR.

2.9 Instrumentation

2.9.1 Instrumentation and Control Systems will be furnished in accordance with Piping
and Instrument Diagrams. Instrument standard shall be in accordance with
Engineering Standard ES-60.01 Instrument General specification

2.9.2 Instrumentation and Control System

[ ] Pneumatic Control System


[ ] Conventional Electronic System
[ ] Shared Display
[ ] Process Computer Facilities
[ ] Process Computer Type [ ] Part of Microprocessor-Based System
[ ] Computer Functions Include: [] Data logging
[ ] Supervisory Control [] Graphic Displays
[ ] DDC [ ] Data Reduction
[ ] Binary Control Details in "Systems" Section,

Computer Supplied by: [] EPC Contractor


[ ] Client
Configurative Programming by: [] EPC Contractor
[ ] Client

Advanced Control/Optimisation
By: [ ] Client
[] EPC Contractor

[] Data Logging
[] Computer Supervisory Control
[] Microprocessor facilities
used for:

[] Distributed Control [ ] Single Loop Integrity


[] Analogue Display Back-up % [ ] Microprocessor Control
Back-up %
[] Configuration Programming by [ ] CONTRACTOR
[ ] Client

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 17 OF 30
(BEDD) ENGINEERING STANDARD REV D2

Note: - DCS shall be designed for future addition of Advanced Control System

2.9.3 Control Room/Panel

The Control Room shall be:

[ ] Single Central Control Room


[ ] Multiple Control Rooms, one for each Area/Unit Group
[] Central Control Room with Satellite Control Rooms
[ ] Distributed Control Option for specified Control Room Type(s),

Controllers mounted in field locations (climate controlled).

The Control Panel shall be:

[] Computer Type Consoles


[ ] Semi-Graphic Control Panel
[ ] Non-Graphic Control Panel
[] Computer Generated Graphics
[ ] Other

Control Panel configuration shall be: [] Conventional


[ ] K-Style
[ ] Other

Auxiliary devices

Alarm Indicating Devices shall be:

[]Conventional Annunciators [] CRT-Based


[ ] Microprocessor Based [ ] Other

Recording shall be by:

[ ] Dedicated-Pen Strip Chart Units [] CRT - Trending


[ ] Selectable-Input Strip Chart Units [ ] Hardcopy of CRT
Display
[ ] Existing DCS has Printer for Colour [ ] Colour Hardcopier
Hardcopier Printer should be added.
[ ] Other
[ ] Field-Mounted Chart-Type Units Integrators
Required

Printers

[ ] Alarm Logging
[ ] Data Logging
[ ] Other

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 18 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.9.4 Special Control Systems

[] Shut-down System [] Programmable Logic Controller


[ ] Hard-Wired Relay Logic
[ ] Part of Main Control System
[] Solid State (fail safe)
[] Sequence Control [] Programmable Logic Controller
[ ] Hard-Wired Relay Logic
[ ] Part of Main Control System
[ ] Blending [ ] Microprocessor Based System
[ ] Hard-Wired Relay Logic/Analog Control
[ ] Part of Main Control System
[] Tank Gauging with Master Tank System
[ ] Water Treatment
[] SCADA system
[] Fire detection and fighting
see Section 13 SAFETY FACILITIES

2.9.5 Alarm Initiations

[ ] Field Switches
[ ] Trip Amp Generated
[] Microprocessor Generated

2.9.6 Shut-down System

[ ] Field Switches
[ ] Trip Amp Generated
[] Microprocessor Generated

2.9.7 Analysers

Analysers are required as shown on Engineering Flow Diagram.

Analyser Location:

[ ] Local Enclosures [ ] Central Analyser House


[] Area/Unit Analyser House

2.9.8 Package Equipment Instrumentation

Instrumentation Supplied by: [] CONTRACTOR


[] Manufacturer

Manufacturer-Supplied Instrumentation
[] Supplied to Engineering Standard ES-60.01 Instrument General
Specification
[ ] Other

2.9.9 Control Valves

Primary type of Modulating Control Valve shall be:

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 19 OF 30
(BEDD) ENGINEERING STANDARD REV D2

[] Globe-Type (see Note 1) [ ] Wafer/Butterfly Type


[ ] Rotary Plug Type [ ] Other

The type chosen shall be the type used for routine applications.

Other types shall be used as required by process.

Valve positioners shall be:


[ ] Pneumatic
[] Electropneumatic
[ ] Pneumatic + I/P Converter

2.9.10 Special Approval Agency Requirements

Approval of instruments and/or systems is required by:


[] BASEEFA [ ] PTB
[ ] CSA [ ] Other

2.9.11 Transmitted Signal Levels


[] Electronic 4-20 mA, [] Foundation Fieldbus

Pneumatic [ ] 3-15 psig [] 0.2 - 1.0 barga

2.9.12 Electrical Equipment in Hazardous Areas

Electronic instrumentation in hazardous areas shall be based upon:


[] intrinsically safe
[ ] explosion proof/flame proof
[ ] non-indecisive/non-sparking
[ ] Other

See section 2.9.10 above for approval authority

2.9.13 Instrument Installation

Cable routing

Service Underground Above Direct Conduit Tray


Ground Buried

ISBL [] [ ] [] [] [ ]

OSBL [] [ ] [] [] [ ]

Cable Types

ISBL: - Armoured

OSBL: - Armoured

Process Hook-ups [ ] Tubing [] Piping

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 20 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.10 Electrical

2.10.1 General requirements for electrical equipment, materials and design shall be in
accordance with Engineering Specification for Electrical and Telecommunication
System.

2.10.2 Power Supply

The system characteristics shall be as follows:

2.10.2.1 Incoming supply refer to ES-70.01.

2.10.2.2 In plant generation refer to ES-70.01.

2.10.2.3 The power source location at the battery limit shall be refer to ES-70.01.

2.10.2.4 The max. 3 phase fault level refer to ES-70.01.

2.10.2.5 An emergency power supply shall be provided by CONTRACTOR in accordance


with Engineering Standard ES-70.02.08 Diesel generator Set
2.10.2.6 An Uninterruptable power supply shall be provided by CONTRACTOR in
accordance with Engineering Standard ES-70.02.06 Uninterruptable Power
Supply.

2.10.2.7 Generally, the ISBL systems Voltage Levels and System Design Data shall be
designed, performed, operated and utilized as specified in ES-70.01 section 2.0
system design.

2.10.3 Utilisation Voltages shall be designed, performed, operated and utilized as


specified in ES-70.01 section 2.0 system design.

2.10.4 Distribution and Lighting

2.10.4.1 Service

Above Direct Conduit Tray


Ground Buried

Power ISBL ISBL ISBL


OSBL OSBL OSBL

Lighting ISBL ISBL ISBL


OSBL OSBL OSBL

Communication ISBL ISBL


OSBL OSBL

2.10.4.2 Cable Types shall refer to ES-70.01 and ES-70.21.

2.10.4.3 Area Classification and minimum required type of Protection for equipment in
Hazardous Areas shall be designated as ES-70.01 section 1.3 Hazardous Area.

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 21 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.10.4.4 One-Line Diagrams shall be provided by CONTRACTOR.

2.10.4.5 The location of motor control stations shall be developed by CONTRACTOR.

2.10.4.6 Lighting fixtures shall refer to ES-70.01 and ES-70.23.

2.10.4.7 Soil Characteristics such as Soil Temperature, Soil Thermal Resistivity and Soil
Resistivity shall refer to Soil report.

2.10.4.8 Supplementary Lighting shall be provided.

Type Location

Emergency Critical Plant, wherever safety requirement

Aviation obstruction According to ICAO

Security Exit/entry and control room

Other Indication Purpose for Safety


2.10.4.9 Offsite lighting shall be provided.

2.10.5 Miscellaneous Requirements

2.10.5.1 A fire alarm system shall be provided.


(Also see Section 13 Safety Facilities)

2.10.5.2 Not used

2.10.5.3 A communications system shall be provided in accordance with ES-70.01 and


refer to ES-80.13, ES-80.14, ES-80.15 and ES-80.17.

2.11 Protective Cover

2.11.1 Insulation for hot piping and equipment

Insulation for hot piping and equipment shall be in accordance with ES-92.01 Hot
Insulation.

2.11.2 Insulation for cold piping and equipment

Insulation for cold piping and equipment shall be in accordance with ES-92.02
Cold Insulation.

2.11.3 Winterising is not applicable on this plant.

2.11.4 External heating

2.11.4.1 External heating for piping and equipment shall be electric tracing as specified on
Piping and Instrument diagram.

2.11.5 Personnel Protection

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 22 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.11.5.1 Piping and equipment operating at or above 60oC shall be provided with insulation
guards for personnel protection where accessible.

2.11.6 Fireproofing

2.11.6.1 Fireproofing of equipment and supports shall be provided in accordance with


Engineering Standard ES-92.05 External Fireproofing for equipment support
and structure.

2.11.7 Painting

2.11.7.1 Painting for all piping, equipment structures and all externals shall be in
accordance with Engineering Standard ES-92.06 Painting. (included internal
painting prior to internal lining of WHRU, Stack. Linings of internals are
excluded)

2.11.8 Wrapping Underground Pipe

2.11.8.1 Coating and wrapping of underground steel pipe shall be in accordance with
Engineering Standard ES-92.07 Cathodic protection of Onshore and buried pipe.
2.11.9 Galvanising

Galvanising of iron and steel items shall be accordance with ES 40.8 Structural
Steel Fabrication and Erection.

2.12 Safety Facilities

2.12.1 Fire Fighting

Fire Fighting facilities shall be provided in accordance with Engineering Standard


ES-90.03 Fire and Gas Specification.

2.12.1.1 Deleted.

2.12.1.2 Fire trucks shall be provided.

2.12.1.3 A foam system shall be provided in accordance with Engineering Standard ES-
90.03 Fire and Gas Specification.

2.12.1.4 Sprinkler systems shall be Water Spray systems are covered in the Fire and
Gas Detection and Protection Specification ES-90.03.

2.12.1.5 Detection, Alarm and Control Systems shall be provided in accordance with
Engineering Standard ES-90.03 Fire and Gas Specification.

Fire and Safety Display System in process area shall be centralised in GSP 7
CCR. Fire and Safety Display System for product storage shall be centralised in
GSP 7 CCR.

2.12.2 Blowdown and Flare System

2.12.2.1 Blowdown and flare facilities shall be provided. Flare should be smokeless design
in accordance with PH-10-05

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 23 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.12.2.2 Flares shall be elevated.

2.12.2.3 Not used.

2.12.2.4 Relief valves handling hydrocarbon vapour shall be vented to a closed relief
system.

2.12.2.5 The liquid relief system shall be combined with the vapour relief system.

2.12.2.6 The allowable ground level radiation shall be 4.73 KW/m2 (solar not included).

2.12.2.7 The air pollution control requirements shall be in accordance with Engineering
Standard ES-91.03 Environmental Specification.

2.12.3 Aircraft Warning Lights

2.12.3.1 Warning lights for aircraft shall be provided on the following tall structures:

Note: see also ES-70.01 and ES-70.23

2.12.4 Safety Showers

Safety showers and eye wash stations (fountain type) shall be provided by
CONTRACTOR in accordance with ES-90.04 Personnel Protection and ES-
50.05 Piping Layout

2.13 Shipping Facilities

2.13.1 Marine Facilities

2.13.1.1 Marine facilities shall not be provided.

2.13.2 Rail Facilities

2.13.2.1 Rail facilities shall not be provided.

2.13.3 Truck Facilities

2.13.3.1 Truck facilities shall be provided for:-

Amine loading
Hot Oil loading
Chemical loading (e.g. NaOH, HCl, Ammonia)
Waste disposal
Note: 200 liter drums loading facility shall also be provided for all above systems.

2.13.4 Ship Security

2.13.4.1 N/A

2.13.5 Pipe Runs

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 24 OF 30
(BEDD) ENGINEERING STANDARD REV D2

2.13.5.1 Pipelines shall be provided.

2.13.5.2 The facilities required are as identified on P&IDs and Piping Layout drawings.

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 25 OF 30
(BEDD) ENGINEERING STANDARD REV D2

APPENDIX A UNITS OF MEASUREMENT

UNITS OF MEASUREMENT

The units of measurement to be used on this project are the International System of units (SI),
except for the rating and sizing of piping and equipment nozzles where pound-inch units shall
be used.

Description Name Symbol Remarks

Length kilometer km
Meter m
Millimeter mm

Mass (weight) metric ton t, ton *


Kilogram kg
Gram g
Micro gram micro equivalent to10-6g

Molecular weight kilo mole kmol *


Mole mol *

Area square meter m2


square centimeter cm2
square millimeter mm2

Concentration Mole percent mol %


Mole fraction -
Weight percent % by weight
Weight fraction -

Volume (for gas Parts per million ppm


and solid) Cubic meter m3
Cubic centimeter cm3
Cubic millimeter mm3
(for liquid) Cubic meter m3
litre l *

Temperature Degree centigrade C *


Kelvin K (K=C + 273.15 (K
is used for physical
variables)

Plan angle Degree  *

Time Year y *
Day d *
Hour h *
Minute min *
Second s

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 26 OF 30
(BEDD) ENGINEERING STANDARD REV D2

Description Name Symbol Remarks

Force Newton N
Stress Megapascal MPa
(1 pa=1N/m2) *

Hardness - N/mm2

Pressure

- gauge Bar gauge Barg *

- absolute Bar absolute Bara *


(1 bar = 1.020 kg/cm2)

Velocity Meter/second m/s


Kilometer/hour km/h

Flow

- volume Cubic meter/hour m3/h


- weight Ton/hour or
kilogram/hour t/h or kg/h *
- gases Normal
cubicmeter/hour at 0C, Nm3/h *
1.013 bara kilogram Kmol/h
mole/hour mole/hour Mol/s
or millions mole standard cubic feet per day MMSCFD

Density Kilogram/cubic meter kg/m3

Linear expansion - m/(m x K) *


Coefficient (or m/mC)

Impact strength Joule/square meter or J/m2 or J/cm2


Joule/square centimeter

Energy, enthalpy, heatJoule or kilojoule J or kJ

Specific enthalpy kJ/kg, J/mol

Heating value kJ/kg or J/mol

Heat duty, electric Watt kW (or kJ/s) 1 W = 1 J/s


Power = 0.860 kcal/h

Heat flux J/(m2 x s) (or W/m2)


(or J/m2 x h))

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 27 OF 30
(BEDD) ENGINEERING STANDARD REV D2

Description Name Symbol Remarks

Specific conductivity kJ/(kg x K)


J/(mol x K)

Thermal conductivity W/mK 1W/K = 0.860


Kcal/mhC

Heat transfer coefficient W/m2K

Absolute viscosity cP

Kinematic viscosity m2/s (or mm2/s)

Fouling factor m2K/W (1m2K/W = 1.163


m2hC/kcal)

Surface tension N/m (1N/m=1,000 dyn/cm)

Sound pressure level decibel dB

Rotating speed revolutions per second s-1 (or 1/s) min-1


or minute (or 1/min)

Electric current ampere A


Milliampere mA

Voltage volt V

Frequency hertz Hz, 1/s

Electric resistance ohm

Electric energy Kilowatt hour KWh

Intensity of illumination Lx (Lx = 1m/m2)

Moment Nxm

Notes

1. Symbols marked * are deviating from the SI system.

2. Further units outside the SI can be agreed upon after consultation with PTT.

3. Pipe diameters shall be in inches (primarily) or mm (limited for special application).

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 28 OF 30
(BEDD) ENGINEERING STANDARD REV D2

APPENDIX B FUEL GAS CHARACTERRISTICS

MP FUEL GAS

Source: GSP 7 Sales Gas Header

Component Lean (% mole) Normal (% mole) Rich (% mole)


CO2 0.0151 0.0316 0.0266
N2 1.7889 2.5821 2.3991
CH4 98.1242 97.3015 97.4670
C2H6 0.0718 0.0848 0.1073
C3H8 0.0000 0.0000 0.0000
Total 100.0000 100.0000 100.0000

Source: OCS4 Sale gas header


Remark: Components to be confirmed by DEC.

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 29 OF 30
(BEDD) ENGINEERING STANDARD REV D2

APPENDIX B FUEL GAS CHARACTERISTICS

LP FUEL GAS

Source: Let down of MP Fuel gas and HP off-gas from AGRU.


Normal case: Based on GSP 7 Hot Oil heat duty. GTG and WHRU normally operate.

Component Lean (% mole) Normal (% mole) Rich (% mole)


CO2 51.896 41.772 22.886
N2 0.604 1.083 1.394
CH4 41.438 50.238 68.392
C2H6 2.292 2.988 3.494
C3H8 1.247 1.521 1.837
i-C4 0.231 0.292 0.369
n-C4 0.334 0.422 0.506
i-C5 0.016 0.017 0.014
n-C5 0.010 0.012 0.010
n-C6 0.006 0.006 0.005
n-C7 0.008 0.008 0.005
n-C8 0.000 0.000 0.000
H2O 1.918 1.641 1.088
Total 100.000 100.000 100.000
LHV KJ/Kg 12,887 17,118 27,503

Remark: Components and LHV to be confirmed by DEC based on HP off-gas information from
licensor of AGRU and final LP Fuel gas demand.

Source: Letdown of MP Fuel gas and HP off-gas from AGRU


Design case: Based on GSP 7 and future GSP 8 Hot Oil heat duty. GTG normally operates when
WHRU bypass

Component Lean (% mole) Normal (% mole) Rich (% mole)


CO2 34.047 25.422 12.406
N2 1.012 1.670 1.855
CH4 60.940 68.673 81.721
C2H6 1.528 1.851 1.941
C3H8 0.818 0.925 0.995
i-C4 0.151 0.177 0.200
n-C4 0.219 0.257 0.274
i-C5 0.011 0.011 0.008
n-C5 0.007 0.007 0.005
n-C6 0.004 0.004 0.003
n-C7 0.005 0.005 0.003
n-C8 0.000 0.000 0.000
H2O 1.258 0.998 0.589
Total 100.000 100.000 100.000
LHV KJ/Kg 20,451 25,279 34,971

Remark: Components and LHV to be confirmed by DEC based on HP off-gas information from
licensor of AGRU and final LP Fuel gas demand.

ES-99.00.05 BEDD_D2
BASIS
ENGINEERING ES-99.00.05
DESIGN DATA PTT PUBLIC COMPANY LIMITED PAGE 30 OF 30
(BEDD) ENGINEERING STANDARD REV D2

APPENDIX C LNG CHARACTERRISTICS

LNG

Source: PTTLNG

Component Lean (% mole) Rich (% mole) High N2 (% mole)


CH4 99.84 87.24 93.40
C2H6 0.01 8.45 3.90
C3H6 0.00 3.15 1.12
i-C4H10 0.00 1.11 0.58
n-C4H10 0.00 0.00 0.00
i-C5H12 0.00 0.05 0.00
n-C5H12 0.00 0.00 0.00
CO2 0.00 0.00 0.00
N2 0.15 0.00 1.00
Total 100.0 100.0 100.0
Molecular Weight 16.06 18.61 17.27
Density 424.7 469.5 451.9

ES-99.00.05 BEDD_D2