REVISION SHEET
TABLE OF CONTENTS
1. GENERAL ...................................................................................................... 4
4. PAINT APPLICATION.................................................................................... 7
5. MARKING....................................................................................................... 10
- LREF-10-DWG-20-0097-A3 -
- LREF-10-DWG-20-0184-A3 -
7. REPAIR ......................................................................................................... 15
1. GENERAL
1.1) Scope
This specification covers the minimum requirement for the design,
material, application, inspection and certification of field painting for
PEMBANGUNAN TERMINAL LPG REFRIGERATED TANK TANJUNG
SEKONG MERAK. This specification covers painting the surface of
carbon steel, low alloy steel, high alloy steel, non ferrous metals and
metallic materials that will be exposed to outdoor atmospheric conditions.
1.2) Reference
The requirements contained in the latest editions as of the following
standards shall for a part of this specification, in the manner and to the
extent indicated herein:
(1) SSPC :
Steel Structures Painting Manual, Volume 1, Good Painting
Practice: Chapter 2.0 to 2.9.
(2) SSPC :
Steel Structures Painting Manual, Volume 2, Systems and
Specifications: Chapter 2,4 (SSPC-PA COM) and 5 (SSPC-PA
Guide 3).
(3) ISO 8501-1 :
Preparation of steel substrates before application of paints and
related products Visual assessment of surface cleanliness - Part l :
Rust grades and preparation grades of uncoated steel substrates
and of steel substrates after overall removal of previous coatings.
(4) ISO 8503-2 :
Preparation of steel before application of paints and related product
surface roughness characteristic of blast-cleaned steel substrates
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)
2. PAINT MATERIAL
2.1) General
The painting material shall be designed and manufactured for field
application in compliance with this specification.
2.2) Painting Materials System
The application paint system shall be a provided in Para 6 of this
document.
3. EXTENT OF WORKING
3.1) Surface to be painted
(1) All surface shall be painted according to the appropriate system
specified in Para 6, with the exception of those surface described
in Subsection 3.2 below.
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)
4. PAINT APPLICATION
4.1) General
Storage tanks, piping and structural steels that are field painted shall not
have paint applied within 25 mm of the butt welded edges with the
following exception : For storage tanks “Temporary rust preventive weld
able paint” shall be applied up to the butt welded edges, but shall be
removed just prior to welding if required by the welding procedure
specification.
(3) Surface preparation shall not be carried out in the following situations:
a) When the substrate temperature is less than 3 °C above the dew
point or relative air humidity at workplace is greater than 85%.
b) When the blasted surface may become wet before the first coat of
primer.
SP8 Pickling -
c) All edges, corners, notches, welded parts, joints of plates, bolts and
nuts, shall be very carefully cleaned. These special areas shall be
painted prior to general application with the use of brush to ensure
adequate painting DFT is achieved.
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)
5. MARKING
(1) Storage Tank Marking
All lettering and numbering shall be Colored black. (Munsell No. N1.5)
Letters to be gothic type. Refer to drawing
- LREF-10-DWG-20-0097-A3 (Tank Stencil Detail for Propane Tank
(T-201) attachment
- LREF-10-DWG-20-0184-A3 (Tank Stencil Detail for Butane Tank
(T-301) attachment
(2) Accessories
Each pipe, flange, fitting, valve, etc. shall be legibly dye stamped on a
yellow paint field, for pipe at 25 cm from one end. For low temperature
service materials low stress stamps to be used. The stamping should
include :
a) Factory symbol
b) Materials specification
c) Charge or batch number
11 of 25
12 of 25
FIELD PAINTING SPECIFICATION FOR PROPANE & BUTANE
REFRIGERATED TANK (T-201 & T-301)
Document No Rev : 2
Pekerjaan Engineering, Procurement & Construction (EPC) Proyek Pembangunan
Terminal LPG Refrigerated
Sheet No
LREF-00-SP-20-0015S-A4
13 of 25
L12-FF-1
L9-FF
L12-FF-1 L12-FF-1
L12-FF-2
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE REFRIGERATED TANK
(T-201 & T-301)
Document No. Pekerjaan Engineering, Procurement & Rev. 2
Construction (EPC) Proyek Pembangunan Sheet No.
LREF-00-SP-20-0015S-A4 Terminal LPG Refrigerated 14 of 25
Painting System
Temp For Surface
Environment Painting Work Primer Intermediate Top Coat Total DFT Final Coat RAL Color
NO ITEM NO. Discription Substrate Condition Painting Preparation
Condition System Places DFT DFT (µm) Colour No.
System Grade SSPC Type Brand Name DFT (µm) Type Brand Name Type Brand Name
(µm) (µm)
STORAGE TANK
External Shell Plate, External Roof Plate and Sigma Prime Sigma Cover Alphalic Sigmadur
Carbon Steel Un-Insulated - 45 < T < 120 Normal Plant L12-FF At Field SP11 or SP3 Epoxy 75 Polyamide Epoxy 100 50 225 White 9003
Pipe Nozzle 200 410 MIO Polyurethane 550
Platform, Stairway, Pipe Support Water Spray, Sigma Cover Alphalic Sigmadur
Carbon Steel Un-Insulated - 45 < T < 120 Normal Plant L12-FF At Field SP3 or SP2 - - - Polyamide Epoxy 100 50 150 Light Gray 7047
Propane Riser Pipe Support 410 MIO Polyurethane 550
Tank
1 T-201
Sigma Cover Alphalic Sigmadur
Outside Vert. Ladder, handrail Carbon Steel Un-Insulated - 45 < T < 120 Normal Plant L12-FF At Field SP3 or SP2 - - - Polyamide Epoxy 100 50 150 Yellow 1018
410 MIO Polyurethane 550
STORAGE TANK
Sigma Prime
External Shell Plate Carbon Steel Insulated - 10 Normal Plant L12-FF At Field SP11 or SP3 Epoxy 75 - - - - - - 75 Gray -
200
Butane Platform, Stairway, Pipe Support Water Spray, Sigma Cover Alphalic Sigmadur
Tank Carbon Steel Un-Insulated - 10 Normal Plant L12-FF At Field SP3 or SP2 - - - Polyamide Epoxy 100 50 150 Light Gray 7047
Riser Pipe Support 410 MIO Polyurethane 550
T-301
2
Sigma Cover Alphalic Sigmadur
Outside Vert. Ladder, handrail Carbon Steel Un-Insulated - 10 Normal Plant L12-FF At Field SP3 or SP2 - - - Polyamide Epoxy 100 50 150 Yellow 1018
410 MIO Polyurethane 550
7. REPAIR
If any repair (paint touch up) follow this field painting specification on paragraph 6
(Specification for Painting System)
8. ATTACHMENT (REPORT PAINTING)
NO. DRAWING NO. DISCRIPTION TITLE MARKING NO. SURFACE PREPARATION AREA RESULT REMARK
: 0 µm
DFT Min
: 0 µm
DFT Max
: 0 µm
Average Total DFT
16 of 25
PAINTING INSPECTION REPORT
Subject :
Remark :
17 of 25
18 of 25