FIELD PAINTING SPECIFICATION

FOR PROPANE & BUTANE


REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 1 of 25

CLIENT : WIKA – PEN CONSORTIUM


CONTRACTOR : PT. BANGUN BEJANA BAJA
PROJECT TITLE : Pekerjaan Engineering, Procurement &
Construction (EPC) Proyek Pembangunan
Terminal LPG Refrigerated
LOCATION : Tanjung Sekong di Merak Mas – Banten
CONTRACT NO. : PEN-150099001

2 20-10-2018 IFA ADI SS SG


1 10-10-2018 RE-IFR ADI SS SG

0 23-11-2017 IFR APR GND JB/SG

PRE CHK APP CHK CHK APP


REV DATE DESCRIPTION
PT. BBB WIKA-PEN PTM
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 2 of 25

REVISION SHEET

No Rev Page Subject Description of Change

1 0 All Issued For Review

2 1 All Re-Issued For Review

3 2 All Issued For Approval


FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 3 of 25

TABLE OF CONTENTS

1. GENERAL ...................................................................................................... 4

2. PAINT MATERIAL ......................................................................................... 5

3. EXTENT OF WORKING ................................................................................. 5

4. PAINT APPLICATION.................................................................................... 7

5. MARKING....................................................................................................... 10

- LREF-10-DWG-20-0097-A3 -

(Tank Stencil Detail for Propane Tank (T-201) ...................................... 11

- LREF-10-DWG-20-0184-A3 -

(Tank Stencil Detail for Butane Tank (T-301) ........................................ 12

6. SPECIFICATION FOR PAINTING SYSTEM ................................................. 14

7. REPAIR ......................................................................................................... 15

8. ATTACHMENT (REPORT PAINTING) .......................................................... 16

9. ATTACHMENT (FLOWCHART OF APPLICABLE STANDARD) ................. 18

10. ATTACHMENT (ASME A 123/A 123M) ......................................................... 19


FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 4 of 25

1. GENERAL
1.1) Scope
This specification covers the minimum requirement for the design,
material, application, inspection and certification of field painting for
PEMBANGUNAN TERMINAL LPG REFRIGERATED TANK TANJUNG
SEKONG MERAK. This specification covers painting the surface of
carbon steel, low alloy steel, high alloy steel, non ferrous metals and
metallic materials that will be exposed to outdoor atmospheric conditions.

1.2) Reference
The requirements contained in the latest editions as of the following
standards shall for a part of this specification, in the manner and to the
extent indicated herein:
(1) SSPC :
Steel Structures Painting Manual, Volume 1, Good Painting
Practice: Chapter 2.0 to 2.9.
(2) SSPC :
Steel Structures Painting Manual, Volume 2, Systems and
Specifications: Chapter 2,4 (SSPC-PA COM) and 5 (SSPC-PA
Guide 3).
(3) ISO 8501-1 :
Preparation of steel substrates before application of paints and
related products Visual assessment of surface cleanliness - Part l :
Rust grades and preparation grades of uncoated steel substrates
and of steel substrates after overall removal of previous coatings.
(4) ISO 8503-2 :
Preparation of steel before application of paints and related product
surface roughness characteristic of blast-cleaned steel substrates
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 5 of 25

– Part 2 : Method for the grading of surface profile of abrasive


blast cleaned steel
– Comparator procedure
(5) ISO 8504-2 : Preparation of steel substrates before application of
paints and related products Surface preparation methods – Part 2:
Abrasive blast-cleaning.
(6) ISO 8504-3 : Preparation of steel substrates before application of
paints and related products Surface preparation methods - Part 3:
Hand and power-tool cleaning.
(7) RAL-Far register 840HR.
(8) ASTM A 123: Standard Specification for Zinc (Hot-Dip Galvanized)
Coating on iron and steel products.
(9) LREF-00-SP-20-0033-A4 Specification for Painting.
(10) LREF-00-SP-20-0014S-A4 Shop Painting Specification for
Refrigerated Tank

2. PAINT MATERIAL
2.1) General
The painting material shall be designed and manufactured for field
application in compliance with this specification.
2.2) Painting Materials System
The application paint system shall be a provided in Para 6 of this
document.

3. EXTENT OF WORKING
3.1) Surface to be painted
(1) All surface shall be painted according to the appropriate system
specified in Para 6, with the exception of those surface described
in Subsection 3.2 below.
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 6 of 25

(2) The protruded portions shall be applied with suitable manufacturer’s


paint system for the excepted operating temperature and shall have
sufficient paint service life to the selected environment conditions.

3.2) Surfaces not to be painted


The following surfaces shall not be painted:
(1) Non-metallic surfaces.
(2) The following carbon steel and low-alloy steel surface not be painted,
except Para 6 and where specified for temporary rust prevention:
a) Internal surface of equipment (Outer shell tank inside for Propane
tank, Shell inside for Butane tank should be painted the primer only),
piping, electrical equipment and instruments.
b) Surfaces which must not be painted (e.g. nameplates, valve stems,
gasket contact surfaces, etc.
c) Contacts surface of assemblies to be jointed with high-strength
bolts for friction grip connections.
d) Surfaces in contact with concrete, cement mortar, asphalt mortar,
sliding plate and clean sanded surface (e.g. under side of equipment
base plate, tank bottom plates, etc) except where to be fireproofed
surface.
e) Plastic protected coated surface.
f) Surfaces to be protected by protective wrapping.
g) Surfaces to be protected by asphalt or a tar enamel protective
coating.
h) Metal protective coated surfaces (e.g. galvanized or aluminized),
for color identification required by Para 6 or at Typical Marine
Environment. Threads (however, the exposed portions can be
painted after the nuts are tightened down)
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 7 of 25

4. PAINT APPLICATION
4.1) General

Storage tanks, piping and structural steels that are field painted shall not
have paint applied within 25 mm of the butt welded edges with the
following exception : For storage tanks “Temporary rust preventive weld
able paint” shall be applied up to the butt welded edges, but shall be
removed just prior to welding if required by the welding procedure
specification.

4.2) Sources of Materials


Only material generally specified for a given service in this specification as
detailed in the document is to be used. Any deviations or change in any
system or application be approved by Contractor.

4.3) Surface Preparation and Cleaning


Painting service life depends primarily on the type of surface preparation.
Harmful materials, such as rust, water, dirt, dust, grease, oil, flux, weld
spatter and chlorides shall be removed from the substrate to ensure proper
adhesion of the primer.
Surface preparation shall comply with the following:
(1) The surface preparation grade and surface roughness for each painting
system shall be according to Para 6.
(2) Surface preparation grades shall comply with either of the standards
in the following corresponding table:
The details of the surface roughness measurement method shall
comply with ISO 8503-2
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 8 of 25

(3) Surface preparation shall not be carried out in the following situations:
a) When the substrate temperature is less than 3 °C above the dew
point or relative air humidity at workplace is greater than 85%.
b) When the blasted surface may become wet before the first coat of
primer.

SSPC Vol.2 Chapter 2 ISO 8501-1

SP1 Solvent Cleaning -

Though hand and


SP2 Hand Tool Cleaning St2
power tool cleaning
Very thorough hand
SP3 Power Tool Cleaning St3 and power tool
cleaning
Commercial Blast Thorough blast
SP6 Sa2
Cleaning cleaning

SP7 Brush Off Blast Cleaning Sal Light blast cleaning

SP8 Pickling -

Near White Metal Blast Sa 2- Very thorough blast


SP10
Cleaning 1/2 cleaning
Power Tool
SP11 -
Cleaning to Bare Metal

c) All edges, corners, notches, welded parts, joints of plates, bolts and
nuts, shall be very carefully cleaned. These special areas shall be
painted prior to general application with the use of brush to ensure
adequate painting DFT is achieved.
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 9 of 25

The paints shall be applied as per the following methods: Paint


application method shall be as per the Paint manufacturer's
recommendations. Paint application methods shall be by one of or a
combination of, the following:
a) Brush
b) Roller
c) Spray (air spray or airless spray).
d) Other practical methods approved by (contractor) in principle,
paints shall be applied by brush or roller at the field (except at field
shop).

4.4) Climatic Conditions for Paint Application


The climatic conditions for playing paint shall meet the following
requirements:
(1) Ambient Temperature Painting works shall be suspended when the
air temperature at the work place exceeds the limit specified in the
paint manufacturer’s instructions.
(2) Substrate Surface Temperature. The surface temperature of the
Substrate shall not be less than 3˚C above the dew point.
(3) Relative Humidity. In principle, painting work shall not be performed
when the humidity exceeds 85%. Painting works shall be suspended
when relative air humidity at the workplace exceeds the limit
specified in the paint manufacturer’s instructions. As for ethyl
(or alkyl) zinc silicate paint shall be applied when the relative
humidity is between 40% and 90%.
(4) Other Conditions
a) Painting work shall be suspended during strong wind to avoid
depositing dust and other contaminants on the wet paint film or
interring with spray painting.
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 10 of 25

b) If bad weather is imminent, outdoor painting work shall be


suspended.
c) If it rains either during or right after paint application in which the
paint film is suspected to be uncured according to paint
manufacturer’s recommendation, the paint film already applied shall
be completely removed and the substrate re-prepared and
repainted.

5. MARKING
(1) Storage Tank Marking
All lettering and numbering shall be Colored black. (Munsell No. N1.5)
Letters to be gothic type. Refer to drawing
- LREF-10-DWG-20-0097-A3 (Tank Stencil Detail for Propane Tank
(T-201) attachment
- LREF-10-DWG-20-0184-A3 (Tank Stencil Detail for Butane Tank
(T-301) attachment

(2) Accessories
Each pipe, flange, fitting, valve, etc. shall be legibly dye stamped on a
yellow paint field, for pipe at 25 cm from one end. For low temperature
service materials low stress stamps to be used. The stamping should
include :
a) Factory symbol
b) Materials specification
c) Charge or batch number
11 of 25
12 of 25
FIELD PAINTING SPECIFICATION FOR PROPANE & BUTANE
REFRIGERATED TANK (T-201 & T-301)

Document No Rev : 2
Pekerjaan Engineering, Procurement & Construction (EPC) Proyek Pembangunan
Terminal LPG Refrigerated
Sheet No
LREF-00-SP-20-0015S-A4
13 of 25

L12-FF-1

L9-FF

L12-FF-1 L12-FF-1

Tank Inside: Primer Only

L12-FF-2
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE REFRIGERATED TANK
(T-201 & T-301)
Document No. Pekerjaan Engineering, Procurement & Rev. 2
Construction (EPC) Proyek Pembangunan Sheet No.
LREF-00-SP-20-0015S-A4 Terminal LPG Refrigerated 14 of 25

6. Specification For Painting System

Painting System
Temp For Surface
Environment Painting Work Primer Intermediate Top Coat Total DFT Final Coat RAL Color
NO ITEM NO. Discription Substrate Condition Painting Preparation
Condition System Places DFT DFT (µm) Colour No.
System Grade SSPC Type Brand Name DFT (µm) Type Brand Name Type Brand Name
(µm) (µm)

STORAGE TANK

External Shell Plate, External Roof Plate and Sigma Prime Sigma Cover Alphalic Sigmadur
Carbon Steel Un-Insulated - 45 < T < 120 Normal Plant L12-FF At Field SP11 or SP3 Epoxy 75 Polyamide Epoxy 100 50 225 White 9003
Pipe Nozzle 200 410 MIO Polyurethane 550

Platform, Stairway, Pipe Support Water Spray, Sigma Cover Alphalic Sigmadur
Carbon Steel Un-Insulated - 45 < T < 120 Normal Plant L12-FF At Field SP3 or SP2 - - - Polyamide Epoxy 100 50 150 Light Gray 7047
Propane Riser Pipe Support 410 MIO Polyurethane 550
Tank
1 T-201
Sigma Cover Alphalic Sigmadur
Outside Vert. Ladder, handrail Carbon Steel Un-Insulated - 45 < T < 120 Normal Plant L12-FF At Field SP3 or SP2 - - - Polyamide Epoxy 100 50 150 Yellow 1018
410 MIO Polyurethane 550

Epoxy for Alphalic


Normal Plant
Galvanized Galvanized surface Polyurethane or Sigmadur
Pipe Fire Fighting Un-Insulated - 45 < T < 120 and Typical L9-FF At Field SP1 or SP2 -- -- -- -- 30 30 60 Red 3020
Steel or PMF's PMF's 550
marine
Recomendation Recomendation

Repair (Touch-up Primer) For Damage and Field


Welded Portion Min. DFT Shall be More Than 75 Painting All Surface
Micron

STORAGE TANK

Sigma Prime
External Shell Plate Carbon Steel Insulated - 10 Normal Plant L12-FF At Field SP11 or SP3 Epoxy 75 - - - - - - 75 Gray -
200

Sigma Prime Sigma Cover Alphalic Sigmadur


External Roof Plate and Pipe Nozzle Carbon Steel Un-Insulated - 10 Normal Plant L12-FF At Field SP11 or SP3 Epoxy 75 Polyamide Epoxy 100 50 225 White 9003
200 410 MIO Polyurethane 550

Butane Platform, Stairway, Pipe Support Water Spray, Sigma Cover Alphalic Sigmadur
Tank Carbon Steel Un-Insulated - 10 Normal Plant L12-FF At Field SP3 or SP2 - - - Polyamide Epoxy 100 50 150 Light Gray 7047
Riser Pipe Support 410 MIO Polyurethane 550
T-301
2
Sigma Cover Alphalic Sigmadur
Outside Vert. Ladder, handrail Carbon Steel Un-Insulated - 10 Normal Plant L12-FF At Field SP3 or SP2 - - - Polyamide Epoxy 100 50 150 Yellow 1018
410 MIO Polyurethane 550

Epoxy for Alphalic


Normal Plant
Galvanized Galvanized surface Polyurethane or Sigmadur
Pipe Fire Fighting Un-Insulated - 10 and Typical L9-FF At Field SP1 or SP2 -- -- -- -- 30 30 60 Red 3020
Steel or PMF's PMF's 550
marine
Recomendation Recomendation

Repair (Touch-up Primer) For Damage and Field


Welded Portion Min. DFT Shall be More Than 75 Painting All Surface
Micron
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 15 of 25

7. REPAIR
If any repair (paint touch up) follow this field painting specification on paragraph 6
(Specification for Painting System)
8. ATTACHMENT (REPORT PAINTING)

PAINTING INSPECTION REPORT

Project Title : Proyek Pembangunan Terminal LPG Refrigerated Date :


WO No : PEN-150099001 Report No. :
Client : PT. PERTAMINA PERSERO Tank Name :
Main Contractor : PT. WIKA - PEN Consortium Tag No. :
Sub-Contractor : PT. BANGUN BEJANA BAJA Location : Tanjung Sekong - Merak - Banten
Page : 1 of 2

Item : Visual examination : Clear


Surface Preparation : DFT Reading and Visual Inspection :
Painting Application √ Primer Intermediate Coat Finish Coat
Painting Material/ Colour : Thinner No. :
Manufacture : Batch No. :
Batch No. : Add Thinner :
Expire Date : DFT Spec : µm
Mixing Ratio/ Pot Life : 4 : 1/ 30 °C : 4 hours Induction Time : N/A
Weather Condition √ Clear Cloudy Rain
Ambient temperature :

Time 09.00 AM 11.00 AM 13.00 PM 15.00 PM 17.00 PM


Wet ( °C )
Dry ( °C )
RH ( % )
DP ( °C )
T. Steel (°C)

NO. DRAWING NO. DISCRIPTION TITLE MARKING NO. SURFACE PREPARATION AREA RESULT REMARK

DFT MEASUREMENTS (µm)

1st areas of 10 m² 2nd areas of 10 m² 3rd areas of 10 m²


Spot R1 R2 R3 AVG Spot R1 R2 R3 AVG Spot R1 R2 R3 AVG
1 0 1 0 1 0
2 0 2 0 2 0
3 0 3 0 3 0
4 0 4 0 4 0
5 0 5 0 5 0
Total Average DFT (µm) 0 Total Average DFT (µm) 0 Total Average DFT (µm) 0

: 0 µm
DFT Min
: 0 µm
DFT Max
: 0 µm
Average Total DFT

Prepared & Inspected by, Witnessed/Reviewed by, Approved by,


PT. Bangun Bejana Baja WIKA - PEN Consortium PT. Pertamina (Persero)

Date Print Name Date Print Name Date

16 of 25
PAINTING INSPECTION REPORT

Project Title : Proyek Pembangunan Terminal LPG Refrigerated Date :


WO No : PEN-150099001 Report No. :
Client : PT. PERTAMINA PERSERO Tank Name :
Main Contractor : PT. WIKA - PEN Consortium Tag No. :
Sub-Contractor : PT. BANGUN BEJANA BAJA location : Tanjung Sekong - Merak - Banten
Page : 2 of 2

Subject :

(Surface Preparation 1) (Surface Preparation 2)

(DFT Primer Coat 1) (DFT Primer Coat 2)

Remark :

Prepared & Inspected by, Witnessed/Reviewed by, Approved by,


PT. Bangun Bejana Baja WIKA - PEN Consortium PT. Pertamina (Persero)

Date Print Name Date Print Name Date

17 of 25
18 of 25

9. ATTACHMENT (FLOWCHART OF APPLICABLE STANDARD)

FLOW CHART of APPLICABLE


STANDARD

Pre-Inspection (Pengamatan Permukaan)


Design Fabrication Details NACE PR0178
- Skip Weld, Blow Hole, Weld Smoke, Rough Weld
- Sharp Edge / Corner
Dirt Contamination (Oil/Grease, Salt, Dirt’s, Etc) Environmental Test (Uji Lingkungan ASTM E-337)
Rust Condition Test: Ambient Temperature (Wet/Dry), Dew Point,
- Ref. SSPC Vis-1 (New Steel) / ISO 8501 Relative Humidity, Wind Velocity & Surface
- Ref. SSPC Vis-2 (Painted Steel) / ASTM D610 Temperature
Equipment: Sling Hygrometer, Dew Point Calculator,
Surface Thermometer & Anemometer

Pre-Inspection (Pengamatan Peralatan/Abrasive)


Equipment:
- ASTM D-4264 Hypodermic Pressure Test,
- ASTM D-4285 Blotter Test (Water & Oil),
& Bore No zzle Test Mixing, Thinning & Agitation (SSPC PA1)
- Abrasive: ASTM E136 Sieve Test, SSPC AB 1/2/3 Vial Batch Number , Soil Volume, Mixing Ratio, Thinner Add,
Test, SSPC TU4 Conductivity Soluble Salts Viscosity, Pt Life, Fluid Temperatur e, Induction Time,
DFT Spec, Dry To Touch, Dry Handle, Fully Cure, and
Recoating Interval Time
Equipment: Pneumatic Agitator, ASTM D-42 12 Viscose,
Liquid Thermometer, RAL Color Card

Pre-Preparation (Persiapan Permukaan)


- SSPC SP1 – Solvent Cleaning
- SSPC SP2 – Hand Tool Cleaning
- SSPC SP3 – Power Tool Cleaning
Method of Application
- SSPC – PA1 : Spray Equipment
- ASTM D – 4414 : Wet Film Thickness
- SSPC – PA3 : Safety in Painting Operation

Surface Cleaning (Pembersihan Permukaan)


- SSPC SP5 / NACE1 / Sa3 : White Cleaning
- SSPC SP10 / NACE2 / Sa2.5 : Near White Cleaning
- SSPC SP6 / NACE3 / Sa2 : Commercial Cleaning
- SSPC SP7 / NACE4 / Sa1 : Brush off Cleaning Non-Destructive Inspection
Reference: SSPC Vis – 1 for Abrasive - ASTM D – 1186 / SSPC PA2 : Dry Film Thickness
- NACE RP – 0188 / ASTM D-5162 : Holiday Test

Surface Roughness (Kekasaran Permukaan)


- ASTM D-4417A : KTA Surface Profile Comparator Destructive Inspection
- ASTM D-4417B : Micro Depth Gauge - ASTM D-3359 : Cross-Hatch Adhesion Test
- ASTM D-6677 : Knife Adhesion Test
- ASTM D-4417C / NACE RP0287: Replica Tape
- ASTM D-4541 : Pull-Off Adhesion Test
- ASTM D-3363 :Pencil Hardness Test
- ASTM D-4752 : Solvent Rub ness Test
- ASTM D-4138 : PIG Took Gauge

Surface Contamination (Kontaminasi Permukaan)


Reference:
- ISO 8502 – 3 : Dust Level
- ISO 8502 – 9 : Salt Contamination
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 19 of 25

10. ATTACHMENT (ASME A 123/A 123M)


FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 20 of 25
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 21 of 25
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 22 of 25
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 23 of 25
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 24 of 25
FIELD PAINTING SPECIFICATION
FOR PROPANE & BUTANE
REFRIGERATED TANK
(T-201 & T-301)

Document No Pekerjaan Engineering,Procurement Rev : 2


&Construction (EPC)ProyekPembangunan Sheet No
LREF-00-SP-20-0015S-A4 Terminal LPGRefrigerated 25 of 25