Professional Documents
Culture Documents
KNT-001-GE-ST3-SP-004
KNT CPP
SPECIFICATION FOR STAINLESS STEEL Rev. 0 Page 2 of 6
MATERIALS
Track Changes
TABLE OF CONTENTS
1. INTRODUCTION 4
2. ADDENDUM 5
BLOCK 09-2/09 FIELD DEVELOPMENT
KNT-001-GE-ST3-SP-004
KNT CPP
SPECIFICATION FOR STAINLESS STEEL Rev. 0 Page 4 of 6
MATERIALS
1. INTRODUCTION
Kinh Ngu Trang (KNT) and Kinh Ngu Trang Nam (KTN) fields belong to Block 09-2/09 in Cuu
Long Basin offshore southern Vietnam. KNT field locates in distance approxiemately 150km
from Vung Tau city, 40 km from the East of White Tiger field, 14 km from platform E1 of Rang
Dong field (Block 15-2, JVPC) and 25 km from CNV field. KTN field locates in distance 3.5km
from KNT field. Sea water depth in KNT, KTN locations is approxiemately 65m.
RD Field
TGT Field
KNT Discovery
KTN Discovery
CNV Field
Block 09-2/09
At the Block 09-2/09, it is planned for development by building two offshore platforms KNT and
KTN which will be connected with each other by 3.5km infield pipeline. The KNT platform will be
designed as a Central Processing Platform (CPP) equipped with full process and utility facilities
to ensure the safe and effective oil & gas production at the Block 09-2/09. KTN will be designed
as an unmanned wellhead platform, which is monitored and controlled remotely from KNT CPP.
Production fluid of KNT/KTN fields will be gathered and processed on KNT CPP. The mixture
of gas and liquid of KNT/KTN fields will be transported to White Tiger field via 38.8 km of subsea
pipleline for further processing to meet commercial requirement before offloading. Injection
water for KNT/KTN platforms will be supplied from BK-15 platform in White Tiger field via 35.8
km of subsea pipeline.
BLOCK 09-2/09 FIELD DEVELOPMENT
KNT-001-GE-ST3-SP-004
KNT CPP
SPECIFICATION FOR STAINLESS STEEL Rev. 0 Page 5 of 6
MATERIALS
2. ADDENDUM
This document uses the Typical Engineering Documentation for this Project. However, some
design intends or requirements may require to be revised to fit with Project’s purpose. This
section lists changes in the applied typical documents, originating in Typical Engineering
Documentation for any reason including those indicated in Table 1. These changes are identified
in this Addendum to the applied typical document, identifying the document and section affected
and the required change.
VENDOR shall review the required changes in conjunction with the referenced document
and project’s engineering documents.
BLOCK 09-2/09 FIELD DEVELOPMENT
KNT-001-GE-ST3-SP-004
KNT CPP
SPECIFICATION FOR STAINLESS STEEL Rev. 0 Page 6 of 6
MATERIALS
The type of modification shall be defined and indicated in subsequent text as follows:
✓ “ADD” - Indicates the following statement(s) is/are added to the Company referenced
text.
✓ “DELETE” - Indicates the following statement(s) is/are deleted from the Company
referenced text.
✓ “REPLACE WITH” - Indicates the following statement(s) is/are revision(s) to the
Company referenced text.
Current Statement or
Section Revised to
Requirement
Note:
No changes need to be made.