You are on page 1of 8

PHASE II OF REFINERY IN DOS

BOCAS (FCC)
Page 1 of 8
Doc. TITLE CAUSE AND EFFECT MATRIX
Rev. 3
Contract Doc. No. R2B-P3-206-02-A-CE-00001 Contract No. PTI-ID-O-004-2-2020
Contractor
Contractor Doc. No. SO6465-ES0D-CNE-P3206001 SO6625
Job. No.

CAUSE AND EFFECT MATRIX


FCC Unit 21000

BETWEEN

PTI-Infraestructura de Desarrollo, S.A. de C.V.

AND

Samsung Ingeniería Manzanillo, S.A. de C.V. /


Asociados Constructores DBNR, S.A. de C.V.

“COMPLEMENTARY ENGINEERING, PROCUREMENT, CONSTRUCTION AND SUPPORT


DURING TESTS AND STARTUP OF THE CATALYTIC CRACKING FCC PLANT FOR THE
REFINERY IN DOS BOCAS, PARAÍSO, TABASCO” (PHASE II)

Contract No. PTI-ID-O-004-2-2020

3 17 JUN 22 ISSUE FOR CONSTRUCTION WJ Kim WD Cho KH Lee


2 31 AUG 21 ISSUE FOR CONSTRUCTION WJ Kim WD Cho KH Lee
1 26 FEB 21 ISSUE FOR CONSTRUCTION WJ Kim WD Cho KH Lee
0 22 APR 20 ISSUE FOR COST ESTIMATION WJ Kim WD Cho KH Lee
A 13 FEB 20 ISSUE FOR REVIEW WJ Kim SJ Lim KH Lee

Rev Date Description Prepared by Reviewed by Approved by

This document, including any patented or patentable features, embodies confidential information of Samsung Ingeniería Manzanillo, S.A. de C.V. and its use is
conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon nor to use the document for any purpose
other than specifically permitted in writing by Samsung Ingeniería Manzanillo, S.A. de. C.V.
PHASE II OF REFINERY IN DOS BOCAS
(FCC)
Page 2 of 8
Doc. TITLE CAUSE AND EFFECT MATRIX
Rev. 3
Contract Doc. No. R2B-P3-206-02-A-CE-00001 Contract No. PTI-ID-O-004-2-2020

Contractor
Contractor Doc. No. SO6465-ES0D-CNE-P3206001 SO6625
Job. No.

REVISION HISTORY

Rev. Date Description


A 13 FEB 20 ISSUE FOR REVIEW
0 22 APR 20 ISSUE FOR COST ESTIMATION
ISSUE FOR CONSTRUCTION
1 26 FEB 21 - It was updated overally as emergency shutdown logic was developed.
- DCS permissive was indicated as Note.
ISSUE FOR CONSTRUCTION
- Logic regarding to compressor isolation MOVs was developed.
2 31 AUG 21
- Equipment tag no. and P&ID sheet no. were updated according to the latest P&ID.
- Duplication logic with PKG. was deleted based on Vendor C&E / P&ID.
ISSUE FOR CONSTRUCTION
- Logic regarding for pump trip at Low Level was developed as per SIL reports.
- Auto switching logic between N2 and steam for Reactor was developed.
3 17 JUN 22
- ESD was developed based on FAT result with UOP comments.
- Vacuum Breaker Logic for MAB was developed based on MAB Vendor clarification.
- C&E for Surface condenser condensate pumps was developed based on P&ID.
* Notes:
This page records all revisions on the procedures.
NOTES Rev

3
R2B-P3-206-02-A-DTI-00066 2, 3-6, 3-7

3-3

3-5

3-4

3-2

3-2

3-1

3-1

3-1

3-1
3

6
R2B-P3-206-02-A-DTI-00066

R2B-P3-206-02-A-DTI-00065

R2B-P3-206-02-A-DTI-00064

R2B-P3-206-02-A-DTI-00064

R2B-P3-206-02-A-DTI-00065

R2B-P3-206-02-A-DTI-00064

R2B-P3-206-02-A-DTI-00067

R2B-P3-206-02-A-DTI-00063

R2B-P3-206-02-A-DTI-00012

R2B-P3-206-02-A-DTI-00076

R2B-P3-206-02-A-DTI-00073

R2B-P3-206-02-A-DTI-00074

R2B-P3-206-02-A-DTI-00078
R2B-P3-206-02-A-DTI-

R2B-P3-206-02-A-DTI-

R2B-P3-206-02-A-DTI-

R2B-P3-206-02-A-DTI-

R2B-P3-206-02-A-DTI-

R2B-P3-206-02-A-DTI-

R2B-P3-206-02-A-DTI-
P&ID NUMBER

00058/00061
00058H

00061A

00061A

00061A

00061A

00058A
Doc. TITLE : CAUSE AND EFFECT CHART Page 3 of 8
Contract Doc. No. : R2B-P3-206-02-A-CE-00001
Contractor Doc. No.

CAUSE AND EFFECT MATRIX

DIRECT FIRED AIR HEATER(BA-21001) PILOT GAS SHUTOFF


OPTIMIX PRIMARY ATOMIZING STEAM, PUT IN MANUAL-SET

DIRECT FIRED AIR HEATER(BA-21001) FUEL GAS SHUTOFF

(SPE-21020) VACUUM BREAKER VALVE. (DE-ENERGIZE XY-


LIFT STEAM TO REACTOR RISER (DE-ENERGIZE FY-21926)

SPENT CATALYST SLIDE VALVE (DE-ENERGIZE LY-21931)


MAIN COLUMN BOTTOMS RECYCLE TO REACTOR RISER

NAPHTHA TO REACTOR RISER (DE-ENERGIZE XY-21927)

MOVE FLUE GAS DIVERTER VALVE TO "BYPASS STACK"

HP STEAM SHUTOFF VALVE TO MAIN AIR BLOWER (GB-


DIRECT FIRED AIR HEATER(BA-21001) PILOT GAS VENT

DIRECT FIRED AIR HEATER(BA-21001) FUEL GAS VENT


TORCH OIL SHUTOFF VALVE (DE-ENERGIZE XY-21940)

MAIN AIR BLOWER SURFACE CONDENSER PACKAGE


VALVES (DE-ENERGIZE XY-21911A/B, XY-21912A/B)

VALVES (DE-ENERGIZE XY-21915A/B, XY-21916A/B)


EFFECT
NOTES

FUNCTION PERFORMED
1) LEGEND : O = OPEN, C = CLOSE, A = ACTIVATE, S = STOP, Y = YES, C/D = CLOSE AFTER DELAY,

MAIN AIR BLOWER SPECIAL CHECK VALVES


RECIRCULATION CATALYST SLIDE VALVES

STEAM TO FLUE GAS STEAM GENERATOR


O/D = OPEN AFTER DELAY, S/D = STOP AFTER DELAY, Y/D = YES AFTER DELAY, E = ENABLE

REGENERATED CATALYST SLIDE VALVE

TURBINE. (DE-ENERGIZE XY-21930A/B)


2) PUT FEED CONTROLLER (FIC-21101, 206-00101) IN MANUAL AND SET THE OUTPUT TO 10%

FEED TO REACTOR SHUTOFF VALVE

VALVE (DE-ENERGIZE XY-21924A/B)

VALVE (DE-ENERGIZE XY-21925A/B)


(SINGLE SHOT TO DCS).

DIVERT TO MAIN COLUMN VALVE

(DE-ENERGIZE XY-21905 / 21907)

ELECTROSTATIC PRECIPITATOR
(DE-ENERGIZE XY-21920 / 21921)
3) PUT CORRESPONDING CONTROL OR SLIDE VALVE CONTROLLER(S) IN MANUAL
AND SET THE OUTPUT TO ZERO (SINGLE SHOT TO DCS).

(DE-ENERGIZE XY-21929A/B)

(DE-ENERGIZE XY-21929A/B)
3-1) PDIC-21010, 206-00061 / PDIC-21011, 206-00061

(DE-ENERGIZE XY-21937)

(DE-ENERGIZE TY-21925)
3-2) FIC-21073, 206-00012 / DIC-21006, 206-00063
3-3) FIC-21011, 206-00064

AT STARTUP-RATE

MAIN AIR BLOWER


3-4) LIC-21005, 206-00068
3-5) TIC-21056, 206-00072
3-6) FIC-21103, 206-00102

POSITION
3-7) FIC-21105, 206-00103

21001)

21010)
4) PUT LIFT STEAM CONTROLLER (FIC-21081, 206-00064) TO MANUAL AND LEAVE THE OUTPUT
AT LAST SETPOINT (SINGLE SHOT TO DCS).
5) SHUTDOWN EFFECTS ARE VALID ONLY WHEN DIVERTER VALVE IS NOT IN BYPASS STACK

SPE-21008 / 21009
FIC-21039 - 21047

XV-21911 / 21912

XV-21915 / 21916
POSITION.

SPE-21003A/B

(XA-21001A)
TAG NO.

XV-21929A

XV-21929B

SPE-21001

SPE-21002

SPE-21013

SPE-21014
GB-21001

HV-21026
XV-21937

XV-21927

XV-21940

XV-21924

XV-21925

XV-21930

XV-21917
FV-21081
6) PUT STEAM TO FLUE GAS STEAM GENERATOR CONTROLLER (HIC-21026, 206-00074) IN MANUAL
AND SET THE OUTPUT TO ZERO AS A RAMP CLOSE FUNCTION, AFTER A TIME DELAY.
7) MAIN AIR BLOWER VENDOR C&E TO BE REFERRED FOR DETAIL.

CAUSE
Rev S/D SYSTEM P&ID NUMBER TAG NO. SERVICE SIL NOTES

3 R2B-P3-206-02-A-DTI-00058 HS-21904E MAIN AIR BLOWER (GB-21001) STOP S C


IS-21007
3 R2B-P3-206-02-A-DTI-00058A HS-21930B HAND SWITH (LOCAL) TO CLOSE XV-21930 S C

VERY LOW FLOWRATE OF AIR TO REGENERATOR


R2B-P3-206-02-A-DTI-00060 FSLL-21906A/B/C 2 C O C C O Y C C C C C C O C O S
(DC-21002). (TWO OUT OF THREE)
FLUE GAS STEAM GENERATOR STEAM DRUM VERY
3 R2B-P3-206-02-A-DTI-00075A LSLL-21936A/B/C 5 C/D C/D C/D C/D O/D Y/D C/D C/D C/D S/D C/D C/D C/D O/D C/D O/D S Y C C/D
LOW LEVEL

R2B-P3-206-02-A-DTI-00068 HS-21901 REACTOR EMERGENCY SHUTDOWN. C O C C O Y C C S

VERY LOW FLOWRATE OF RAW OIL FEED, WHEN


3 R2B-P3-206-02-A-DTI-00102 FSLL-21941A/B/C HL-21900A IS NOT IN "BYPASS" (TWO OUT OF C O C C O Y C C S
THREE)

VERY LOW PRESSURE DIFFERENTIAL BETWEEN


UPSTREAM AND DOWNSTREAM OF THE
R2B-P3-206-02-A-DTI-00064 PDSLL-21924A/B/C C O C C O Y C C S
REGENERATED CATALYST SLIDE VALVE (SPE-
21001). (TWO OUT OF THREE)

VERY LOW POSITION OF THE REGENERATED


R2B-P3-206-02-A-DTI-00064 ZSLL-21925A/B/C CATALYST SLIDE VALVE (SPE-21001). (TWO OUT OF C O C C O Y C C S
THREE)

VERY LOW PRESSURE DIFFERENTIAL BETWEEN


UPSTREAM AND DOWNSTREAM OF THE SPENT
R2B-P3-206-02-A-DTI-00067 PDSLL-21930A/B/C C O C C O Y C C S
CATALYST SLIDE VALVE (SPE-21002). (TWO OUT OF
THREE)

VERY LOW POSITION OF THE SPENT CATALYST


R2B-P3-206-02-A-DTI-00067 ZSLL-21931A/B/C C O C C O Y C C S
SLIDE VALVE (SPE-21002). (TWO OUT OF THREE)

VERY LOW TEMPERATURE OF VAPOR FORM THE


R2B-P3-206-02-A-DTI-00072 TSLL1-21933A/B/C REACTOR (DC-21001) VAPOR. (HS-21903 POSITION C O C C O Y C C S
1, RAW OIL MODE). (TWO OUT OF THREE)
IS-21001 VERY LOW TEMPERATURE OF VAPOR FORM THE
REACTOR (DC-21001) VAPOR. (HS-21903 POSITION
R2B-P3-206-02-A-DTI-00072 TSLL2-21933A/B/C C O C C O Y C C S
2, START-UP NAPHTHA MODE). (TWO OUT OF
THREE)

VERY HIGH TEMPERATURE OF VAPOR FORM THE


R2B-P3-206-02-A-DTI-00072 TSHH-21933A/B/C
REACTOR (DC-21001) VAPOR. (TWO OUT OF THREE)
C O C C O Y C C S

VERY HIGH TEMPERATURE OF THE REGENERATOR


R2B-P3-206-02-A-DTI-00062 TSHH1-21918A/B/C (DC-21002). (REGENERATOR DILUTE PHASE). (TWO C O C C O Y C C C C O C O S
OUT OF THREE)
VERY HIGH TEMPERATURE OF THE REGENERATOR
R2B-P3-206-02-A-DTI-00062 TSHH2-21918A/B/C (DC-21002). (REGENERATOR DILUTE PHASE). (TWO C O C C O Y C C C C O C O S
OUT OF THREE)
VERY LOW PRESSURE OF THE PURGE GAS RISER.
R2B-P3-206-02-A-DTI-00070 PSLL-21934A/B/C C O C C O Y C C S
(TWO OUT OF THREE)

VERY HIGH LEVEL OF THE SPENT CATALYST


R2B-P3-206-02-A-DTI-00068 LSHH-21932A/B/C C O C C O Y C C/D S
STRIPPER. (TWO OUT OF THREE)

FEED TO REACTOR (DC-21001) SWITCH POSITION 1


R2B-P3-206-02-A-DTI-00068 HS-21903 O C
- RAW OIL

FEED TO REACTOR (DC-21001) SWITCH POSITION 2


R2B-P3-206-02-A-DTI-00068 HS-21903
- START-UP NAPHTHA
C O

FEED TO REACTOR (DC-21001) SWITCH POSITION 3


R2B-P3-206-02-A-DTI-00068 HS-21903 C O C C S
- DIVERT/RESET

REACTOR (DC-21001) EMERGENCY RESET, ONLY


R2B-P3-206-02-A-DTI-00068 HS-21902 WHEN FEED TO REACTOR SWITCH IS IN POSITION 3 E E E
- DIVERT/RESET

3 IS-21003 R2B-P3-206-02-A-DTI-00078 MAIN AIR BLOWER TRIP 7 O


NOTES Rev

2-2

2-1

2-1

2-1

2-1

2-3

2-3

R2B-P3-206-02-A-DTI-00115A

R2B-P3-206-02-A-DTI-00130A
R2B-P3-206-02-A-DTI-00012

R2B-P3-206-02-A-DTI-00061

R2B-P3-206-02-A-DTI-00061

R2B-P3-206-02-A-DTI-00061

R2B-P3-206-02-A-DTI-00061

R2B-P3-206-02-A-DTI-00011

R2B-P3-206-02-A-DTI-00011

R2B-P3-206-02-A-DTI-00115

R2B-P3-206-02-A-DTI-00118

R2B-P3-206-02-A-DTI-00115

R2B-P3-206-02-A-DTI-00118

R2B-P3-206-02-A-DTI-00116

R2B-P3-206-02-A-DTI-00118

R2B-P3-206-02-A-DTI-00114

R2B-P3-206-02-A-DTI-00130
P&ID NUMBER
Doc. TITLE : CAUSE AND EFFECT CHART Page 4 of 8
Contract Doc. No. : R2B-P3-206-02-A-CE-00001
Contractor Doc. No.

CAUSE AND EFFECT MATRIX

DIRECT FIRED AIR HEATER(BA-21001) PILOT GAS SHUTOFF

DIRECT FIRED AIR HEATER(BA-21001) FUEL GAS SHUTOFF

MP STEAM SHUTOFF VALVE TO MAIN COLUMN BOTTOMS

MP STEAM SHUTOFF VALVE TO MAIN COLUMN REFLUX


COLUMN BOTTOMS CIRCULATION PUMP C (GA-21103C)
DIRECT FIRED AIR HEATER(BA-21001) PILOT GAS VENT

COLUMN BOTTOMS CIRCULATION PUMP A (GA-21103A)

COLUMN BOTTOMS CIRCULATION PUMP B (GA-21103B)


DIRECT FIRED AIR HEATER(BA-21001) FUEL GAS VENT
TORCH OIL SHUTOFF VALVE (DE-ENERGIZE XY-21940)

ISOLATION VALVE C ON THE SUCTION LINE OF MAIN


ISOLATION VALVE A ON THE SUCTION LINE OF MAIN

ISOLATION VALVE B ON THE SUCTION LINE OF MAIN


VALVES (DE-ENERGIZE XY-21911A/B, XY-21912A/B)

VALVES (DE-ENERGIZE XY-21915A/B, XY-21916A/B)


EFFECT

PUMP A (GA-21109A). (DE-ENERGIZE XY-21914A/B)


MAIN COLUMN BOTTOMS CIRCULATION PUMP C
MAIN COLUMN BOTTOMS CIRCULATION PUMP A

MAIN COLUMN BOTTOMS CIRCULATION PUMP B


DRYPLANT AIR SHUTOFF VALVE TO CATALYST

DRYPLANT AIR SHUTOFF VALVE TO CATALYST


FUNCTION PERFORMED
NOTES

MAIN COLUMN BOTTOMS SPILLBACK VALVE

MAIN COLUMN REFLUX PUMP A (GA-21109A)


1) LEGEND : O = OPEN, C = CLOSE, A = ACTIVATE, S = STOP.
2) PUT CORRESPONDING CONTROL OR SLIDE VALVE CONTROLLER(S) IN MANUAL
AND SET THE OUTPUT TO ZERO (SINGLE SHOT TO DCS).

VALVE (DE-ENERGIZE XY-21924A/B)

VALVE (DE-ENERGIZE XY-21925A/B)

CIRCULATION PUMP A (GA-21103A)


2-1) PDIC-21010, 206-00061 / PDIC-21011, 206-00061
2-2) FIC-21073, 206-00012 / DIC-21006, 206-00063

(DE-ENERGIZE XZY-21945A/B)
2-3) FIC-21074, 206-00011

(DE-ENERGIZE XY-21949)
3) ADD REMOTE HAND SWITHCHS FOR CLOSE ACTION AS PER HAZOP RECOMMENDATION NO.52

WITHDRAWAL LINE

WITHDRAWAL LINE
XV-21911 / 21912

XV-21915 / 21916

XY-21908A/B

MOV-21949

MOV-21951

MOV-21955
TAG NO.

GA-21103C
GA-21103A

GA-21103B

GA-21109A
XV-21940

XV-21924

XV-21925

XV-21907

XV-21945

XV-21914
FV-21149
CAUSE
Rev S/D SYSTEM P&ID NUMBER TAG NO. SERVICE SIL NOTES
VERY LOW TEMPERATURE IN COMBUSTOR OF THE
R2B-P3-206-02-A-DTI-00063 TSLL-21922 C
REGENERATOR (DC-21002)
VERY LOW DENSITY IN COMBUSTOR OF THE
R2B-P3-206-02-A-DTI-00063 DSLL-21923
REGENERATOR (DC-21002)
C

VERY HIGH LEVEL IN THE FUEL GAS KNOCKOUT


R2B-P3-206-02-A-DTI-00611 LSHH-21901
DRUM (FA-21610)
C O C O

VERY LOW PRESSURE DIFFERENTIAL BETWEEN


INLET PILOT GAS AND OUTLET OF THE DIRECT
R2B-P3-206-02-A-DTI-00061 PDSLL-21909A/B/C
FIRED AIR HEATER (BA-21001). (TWO OUT OF
2 C O C O
THREE)
IS-21001
VERY LOW PRESSURE DIFFERENTIAL BETWEEN
R2B-P3-206-02-A-DTI-00061 PDSLL-21913A/B/C INLET FUEL GAS AND OULET OF THE DIRECT FIRED C O
AIR HEATER (BA-21001). (TWO OUT OF THREE)

DIRECT FIRED AIR HEATER FLAME FAILURE.


R2B-P3-206-02-A-DTI-00061 BY-21908A/B/C/D
(THREE OUT OF FOUR)
2 C O C O

VERY HIGH TEMPERATURE OF THE DIRECT FIRED


R2B-P3-206-02-A-DTI-00061 TSHH-21917A/B/C AIR HEATER (DC-21001) OUTLET. (TWO OUT OF C O C O
THREE)

DIRECT FIRED AIR HEATER (BA-21001) EMERGENCY


R2B-P3-206-02-A-DTI-00061 HS-21909A/B
SHUTDOWN SWITCH
C O C O

DRYPLANT AIR SUPPLY STOP SWITCH FOR


R2B-P3-206-02-A-DTI-00011 HS-21022B C C
CATALYST WITHDRAWAL CONNECTION.
IS-21002
VERY LOW LEVEL IN THE REGENERATOR (DC-
R2B-P3-206-02-A-DTI-00062 LSLL-21904A/B C C
21002). (ONE OUT OF TWO)

MAIN COLUMN BOTTOMS CIRCULATION PUMP A


3 R2B-P3-206-02-A-DTI-00115A HS-21946B
(GA-21103A) EMERGENCY STOP.
C S

ISOLATION VALVE A (MOV-21949) EMERGENCY


R2B-P3-206-02-A-DTI-00118 HS-21949A
CLOSE SWITCH.
C S C
IS-21100
ISOLATION VALVE A (MOV-21949) EMERGENCY
3 R2B-P3-206-02-A-DTI-00118 HSC-21949B
CLOSE SWITCH.
3 C S C

R2B-P3-206-02-A-DTI-00118 ZSO-21949 ISOLATION VALVE A (MOV-21949) NOT OPEN C S

MAIN COLUMN BOTTOMS CIRCULATION PUMP B


R2B-P3-206-02-A-DTI-00115 HS-21944
(GA-21103B) EMERGENCY STOP SWITCH
S

ISOLATION VALVE B (MOV-21951) EMERGENCY


R2B-P3-206-02-A-DTI-00118 HS-21951A
CLOSE SWITCH
S C
IS-21101
ISOLATION VALVE B (MOV-21951) EMERGENCY
3 R2B-P3-206-02-A-DTI-00118 HSC-21951B
CLOSE SWITCH
3 S C

R2B-P3-206-02-A-DTI-00118 ZSO-21951 ISOLATION VALVE B (MOV-21951) NOT OPEN S

MAIN COLUMN BOTTOMS CIRCULATION PUMP C


R2B-P3-206-02-A-DTI-00116 HS-21947
(GA-21103C) EMERGENCY STOP SWITCH
S

ISOLATION VALVE C (MOV-21955) EMERGENCY


R2B-P3-206-02-A-DTI-00118 HS-21955A
CLOSE SWITCH
S C
IS-21102
ISOLATION VALVE C (MOV-21955) EMERGENCY
3 R2B-P3-206-02-A-DTI-00118 HSC-21955B
CLOSE SWITCH
3 S C

R2B-P3-206-02-A-DTI-00118 ZSO-21955 ISOLATION VALVE C (MOV-21955) NOT OPEN S

VERY LOW FLOWRATE AT DISCHARGE OF THE


IS-21103 R2B-P3-206-02-A-DTI-00115 FSLL-21943A/B/C MAIN COLUMN BOTTOMS CIRCULATION PUMPS C
(GA-21103 A/B/C) (TWO OUT OF THREE)

3 IS-21109 R2B-P3-206-02-A-DTI-00130A HS-21914 HAND SWITCH (LOCAL) TO CLOSE XV-21914 C S


NOTES Rev

3
R2B-P3-206-02-A-DTI-00206A

R2B-P3-206-02-A-DTI-00206B

R2B-P3-206-02-A-DTI-00075A

R2B-P3-206-02-A-DTI-00075B
WET GAS COMPRESSOR 1ST STAGE DEPRESSURING VALVE R2B-P3-206-02-A-DTI-00205

WET GAS COMPRESSOR 2ND STAGE DEPRESSURING VALVE R2B-P3-206-02-A-DTI-00206

R2B-P3-206-02-A-DTI-00205

R2B-P3-206-02-A-DTI-00205

R2B-P3-206-02-A-DTI-00206

R2B-P3-206-02-A-DTI-00206

R2B-P3-206-02-A-DTI-00009

R2B-P3-206-02-A-DTI-00009

R2B-P3-206-02-A-DTI-00009

R2B-P3-206-02-A-DTI-00009

R2B-P3-206-02-A-DTI-00009

R2B-P3-206-02-A-DTI-00009

R2B-P3-206-02-A-DTI-00009

R2B-P3-206-02-A-DTI-00009

R2B-P3-206-02-A-DTI-00226
P&ID NUMBER
Doc. TITLE : CAUSE AND EFFECT CHART Page 5 of 8
Contract Doc. No. : R2B-P3-206-02-A-CE-00001
Contractor Doc. No.

CAUSE AND EFFECT MATRIX

WET GAS COMPRESSOR 1ST STAGE DISCHARGE ISOLATION

MP STEAM SHUTOFF VALVE TO START-UP STRIPPER STEAM


FLUE GAS STEAM GENERATOR WATER CIRCULATION PUMP
WET GAS COMPRESSOR 2ND STAGE SUCTION ISOLATION
WET GAS COMPRESSOR 1ST STAGE SUCTION ISOLATION
HP STEAM SHUTOFF VALVE TO WET GAS COMPRESSOR

GENERATOR WATER CIRCULATION PUMP A (SPE-21012-


MP STEAM SHUTOFF VALVE TO FLUE GAS STEAM
EFFECT

WET GAS COMPRESSOR 2ND STAGE DISCHARGE


FUNCTION PERFORMED
NOTES

MP STEAM SHUTOFF VALVE OF DETAIL "NN"

MP STEAM SHUTOFF VALVE OF DETAIL "NN"

MP STEAM SHUTOFF VALVE OF DETAIL "NN"


NITROGEN SHUTOFF VALVE OF DETAIL "NN"

NITROGEN SHUTOFF VALVE OF DETAIL "NN"

NITROGEN SHUTOFF VALVE OF DETAIL "NN"


MP STEAM SHUTOFF VALVE OF DETAIL "N"
NITROGEN SHUTOFF VALVE OF DETAIL "N"
1) LEGEND : O = OPEN, C = CLOSE, A = ACTIVATE, S = STOP, C/D = CLOSE AFTER DELAY,
O/D = OPEN AFTER DELAY.

(GB-2121)(DE-ENERGIZE XY-21932A/B)
2) MOV-21936, MOV-21938, MOV-21939 AND MOV-21942 ARE CLOSED BY HAND SWITCHES
WITH TIME DELAY

(DE-ENERGIZE XZY-21958A/B)

(DE-ENERGIZE XY-21952A/B)
HAND SWITCH TAG NO.:
HS-21936A (LOCAL), HSO/HSC-21936B (DCS) FOR MOV-21936

WET GAS COMPRESSOR


HS-21938A (LOCAL), HSO/HSC-21938B (DCS) FOR MOV-21938

REBOILER(EA-21209)
ISOLATION VALVE
HS-21939A (LOCAL), HSO/HSC-21939B (DCS) FOR MOV-21939
HS-21942A (LOCAL), HSO/HSC-21942A (DCS) FOR MOV-21942
3) WET GAS COMPRESSOR START PERMISSIVE :
MOV-21936, MOV-21938, MOV-21939 AND MOV-21942 FULLY OPEN

GA01A)
VALVE

VALVE

VALVE
XV-21920. XV-21926 FULLY CLOSE

B
4) WET GAS COMPRESSOR VENDOR C&E TO BE REFERRED FOR DETAIL.

SPE-21012-GA01B

XV-21952A/B
MOV-21936

MOV-21938

MOV-21939

MOV-21942
TAG NO.

GB-21201

XV-21932

XV-21920

XV-21926

XV-21011

XV-21012

XV-21013

XV-21014

XV-21015

XV-21016

XV-21017

XV-21018

XV-21958
CAUSE
Rev S/D SYSTEM P&ID NUMBER TAG NO. SERVICE SIL NOTES
VERY HIGH LEVEL IN THE COMPRESSOR SUCTION
R2B-P3-206-02-A-DTI-00203 LSHH-21958A/B/C S C
DRUM (FA-21201). (TWO OUT OF THREE)

VERY HIGH LEVEL IN THE COMPRESSOR


R2B-P3-206-02-A-DTI-00209 LSHH-21959A/B/C INTERSTAGE SUCTION DRUM (FA-21202). (TWO OUT S C
OF THREE)

3 R2B-P3-206-02-A-DTI-00206A HS-21957B WET GAS COMPRESSOR (GB-21201) STOP SWITCH S C

3 R2B-P3-206-02-A-DTI-00206B HS-21932 HAND SWITCH (LOCAL) TO CLOSE XV-21932 S C

VERY HIGH TEMPERATURE OF DISCHARGE GAS


R2B-P3-206-02-A-DTI-00205 TSHH-21923A/B/C FORM THE WET GAS COMPRESSOR (GB-21201) 1ST S C
STAGE. (TWO OUT OF THREE)

VERY HIGH TEMPERATURE OF DISCHARGE GAS


R2B-P3-206-02-A-DTI-00206 TSHH-21203A/B/C FORM THE WET GAS COMPRESSOR (GB-21201) 2ND S C
STAGE. (TWO OUT OF THREE)

R2B-P3-206-02-A-DTI-00205 ZSO-21936 MOV-21936 (1ST STAGE SUCTION) NOT FULLY OPEN 2,3 S C O O
IS-21200
MOV-21938 (1ST STAGE DISCHARGE) NOT FULLY
R2B-P3-206-02-A-DTI-00205 ZSO-21938 2,3 S C O O
OPEN

R2B-P3-206-02-A-DTI-00206 ZSO-21939 MOV-21939 (2ND STAGE SUCTION) NOT FULLY OPEN 2,3 S C O O
MOV-21942 (2ND STAGE DISCHARGE) NOT FULLY
R2B-P3-206-02-A-DTI-00206 ZSO-21942 2,3 S C O O
OPEN

R2B-P3-206-02-A-DTI-00205 HS-21936A HAND SWITCH (LOCAL) TO CLOSE MOV-21936 2,3 S C O/D O/D C/D C/D C/D C/D

R2B-P3-206-02-A-DTI-00205 HS-21938A HAND SWITCH (LOCAL) TO CLOSE MOV-21938 2,3 S C O/D O/D C/D C/D C/D C/D

R2B-P3-206-02-A-DTI-00206 HS-21939A HAND SWITCH (LOCAL) TO CLOSE MOV-21939 2,3 S C O/D O/D C/D C/D C/D C/D

R2B-P3-206-02-A-DTI-00206 HS-21942A HAND SWITCH (LOCAL) TO CLOSE MOV-21942 2,3 S C O/D O/D C/D C/D C/D C/D

3 WET GAS COMPRESSOR TRIP (MECHANICAL TRIP) 4 S


WET GAS COMPRESSOR EMERGENCY SHUTDOWN
3 XL-21791B
WITH VENT
4 S O/D O/D C/D C/D C/D C/D

3 R2B-P3-206-02-A-DTI-00009 TSH-21045 HIGH TEMPERATURE FROM REACTOR C O C O C O C O


NOT HIGH TEMPERATURE FROM REACTOR
3 R2B-P3-206-02-A-DTI-00009 TI-21045
(HIGH TEMPERATURE DEACTIVATED)
O C O C O C O C
IS-21006
3 R2B-P3-206-02-A-DTI-00009 HS-21021 SWICH POSITION 1 - STEAM MODE C O C O C O C O

3 R2B-P3-206-02-A-DTI-00009 HS-21021 SWICH POSITION 2 - NITROGEN MODE O C O C O C O C


FLUE GAS STEAM GENERATOR STEAM DRUM VERY
3 IS-21008 R2B-P3-206-02-A-DTI-00075A LSLL-21936A/B/C S C
LOW LEVEL
VERY HIGH PRESSURE VAPOR FROM THE STRIPPER
3 IS-21209 R2B-P3-206-02-A-DTI-00226 PSHH-21952A/B/C C
(DS-21201). (TWO OUT OF THREE)
NOTES Rev

R2B-P3-206-02-A-DTI-00316

R2B-P3-206-02-A-DTI-00313

R2B-P3-206-02-A-DTI-00321

R2B-P3-206-02-A-DTI-00311

R2B-P3-206-02-A-DTI-00312

R2B-P3-206-02-A-DTI-00313

R2B-P3-206-02-A-DTI-00309

R2B-P3-206-02-A-DTI-00323

R2B-P3-206-02-A-DTI-00323

R2B-P3-206-02-A-DTI-00313

R2B-P3-206-02-A-DTI-00323
P&ID NUMBER
Doc. TITLE : CAUSE AND EFFECT CHART Page 6 of 8
Contract Doc. No. : R2B-P3-206-02-A-CE-00001
Contractor Doc. No.

CAUSE AND EFFECT MATRIX

VENT TANK (FA-21306) TO CLOSED DRAIN SHUTOFF VALVES


LEAN CAUSTIC TO EXTRACTOR PLUS (DT-21301) SHUTOFF
SPENT CAUSTIC SHUTOFF VALVE ON DISCHARGE OF THE

RICH AMINE SHUTOFF VALVE (LPG AMINE ABSORBER(DA-

SPENT AIR TO HEATER DIVERTING VALVE (DE-ENERGIZE


CAUSTIC PREWASH CIRCULATION PUMPS (GA-21302A/B)

SETTLER (FA-21301) BOTTOM OULET)(DE-ENERGIZE XY-


SPENT WATER SHUTOFF VALVE ( AMINE WATER WASH

SPENT AIR TO EXHAUST HEAD DIVERTING VALVE (DE-


RICH CAUSTIC SHUTOFF VALVE ( EXTRACTOR PLUS
(DT-21301) EXTRACTION SECTION BOTTOM OULET)
EFFECT

AIR SHUTOFF VALVE TO OXIDIZER (FA-21304)


FUNCTION PERFORMED
NOTES

) BOTTOM OUTLET) (DE-ENERGIZE XY-21961)


AMINE WATER WASH CIRCULATION PUMPS
1) LEGEND : O = OPEN, C = CLOSE, A = ACTIVATE, S = STOP.
2) WHEN HS-21968, NOT IN BYPASS

VALVE (DE-ENERGIZE XY-21967)


(DE-ENERGIZE XY-21966)

(DE-ENERGIZE XY-21964)

(DE-ENERGIZE XY-21965)

(DE-ENERGIZE XY-21970)
DISULFIDE OIL PUMPS

ENERGIZE XY-21972)
XY-21972)
21975)

21301
BP-21305A/B

BP-21301A/B
TAG NO.

XV-21972A

XV-21972B
XV-21966

XV-21964

XV-21975

XV-21965

XV-21961

XV-21967

XV-21970
CAUSE
Rev S/D SYSTEM P&ID NUMBER TAG NO. SERVICE SIL NOTES
VERY HIGH PRESSURE OF THE DISULFIDE
IS-21301 R2B-P3-206-02-A-DTI-00322 PSHH-21970 C
SEPARATOR (FA-21305)

VERY LOW LEVEL IN THE EXTRACTOR PLUS (DT-


IS-21302 R2B-P3-206-02-A-DTI-00313 LSLL-21963 C
21301) (PREWASH SECTION)

VERY HIGH LEVEL IN THE DISULFIDE SAND FILTER


R2B-P3-206-02-A-DTI-00320 LSHH-21967 S
(FAR-21301),
IS-21303
VERY HIGH LEVEL IN THE DISULFIDE SEPARATOR
R2B-P3-206-02-A-DTI-00322 LSLL-21968 S
(FA-21305) STACK.

VERY LOW LEVEL OF THE AMINE WATER WASH


IS-21304 R2B-P3-206-02-A-DTI-00311 LSLL-21974 C S
SETTLER (FA-21301)

VERY LOW LEVEL IN THE EXTRACTOR PLUS (DT-


R2B-P3-206-02-A-DTI-00313 LSLL-21962 C
21301) (EXTRACTION SECTION)
IS-21305
R2B-P3-206-02-A-DTI-00323 LSHH-21971 VERY HIGH LEVEL IN THE VENT TANK (FA-21306) C

VERY LOW LEVEL IN THE LPG AMINE ABSORBER


IS-21306 R2B-P3-206-02-A-DTI-00309 LSLL-21960 C
(DA-21301)

MAIN FRACTIONATOR REBOILER HEATER


R2B-P3-206-02-A-DTI-00323 SHUTDOWN SIGNAL FROM ALKYPLUS UNIT C O
IS-21307 FRACTIONATION SECTION

R2B-P3-206-02-A-DTI-00323 HS-21973 THE EMERGENCY DIVERTING SWITCH C O

VERY LOW FLOWRATE OF LEAN CAUSTIC TO


IS-21308 R2B-P3-206-02-A-DTI-00313 FSLL-21961A/B EXTRACTOR PLUS (DT-21301) (EXTRACTION 2 C
SECTION). (TWO OUT OF TWO)

IS-21309 R2B-P3-206-02-A-DTI-00323 LSLL-21969 VERY LOW LEVEL IN THE VENT TANK (FA-21306) C
NOTES Rev

3
R2B-P3-206-02-A-DTI-00078A

R2B-P3-206-02-A-DTI-00234A

R2B-P3-206-02-A-DTI-00080F
R2B-P3-206-02-A-DTI-00414

R2B-P3-206-02-A-DTI-00414

R2B-P3-206-02-A-DTI-00414

R2B-P3-206-02-A-DTI-00414

R2B-P3-206-02-A-DTI-00402

R2B-P3-206-02-A-DTI-00407

R2B-P3-206-02-A-DTI-00078

R2B-P3-206-02-A-DTI-00078

R2B-P3-206-02-A-DTI-00234

R2B-P3-206-02-A-DTI-00234
P&ID NUMBER
Doc. TITLE : CAUSE AND EFFECT CHART Page 7 of 8
Contract Doc. No. : R2B-P3-206-02-A-CE-00001
Contractor Doc. No.

CAUSE AND EFFECT MATRIX

HP STEAM SHUTOFF VALVE TO MAIN AIR BLOWER SURFACE


LP STEAM SHUTOFF VALVE TO C3/C4 SPLITTER AUXILIARY

SURFACE CONDENSER CONDENSATE PUMP A (GA-21209A)


CONDENSER CONDENSATE PUMP A (GA-21001A) TURBINE.
HEAT PUMP COMPRESSOR DISCHARGE ISOLATION VALVE

LP STEAM SHUTOFF VALVE TO DEETHANIZER REBOILER

HP STEAM SHUTOFF VALVE TO WET GAS COMPRESSOR


HEAT PUMP COMPRESSOR SUCTION ISOLATION VALVE
HEAT PUMP COMPRESSOR DEPRESSUREING VALVE
EFFECT

WET GAS COMPRESSOR SURFACE CONDENSER

WET GAS COMPRESSOR SURFACE CONDENSER


FUNCTION PERFORMED
NOTES

MAIN AIR BLOWER SURFACE CONDENSER

MAIN AIR BLOWER SURFACE CONDENSER


1) LEGEND : O = OPEN, C = CLOSE, A = ACTIVATE, S = STOP, C/D = CLOSE AFTER DELAY,

TURBINE. (DE-ENERGIZE XY-21933A/B)


O/D = OPEN AFTER DELAY.
2) MOV-21948, MOV-21950 ARE CLOSED BY HAND SWITCHES WITH TIME DELAY
HAND SWITCH TAG NO.:

FLUFFING AIR COMPRESSOR


(DE-ENERGIZE XY-21941A/B)

(DE-ENERGIZE XY-21923A/B)
HS-21948A (LOCAL), HSO/HSC-21948B (DCS) FOR MOV-21948

HEAT PUMP COMPRESSOR

(DE-ENERGIZE XY-21943)
HS-21950A (LOCAL), HSO/HSC-21950B (DCS) FOR MOV-21950

CONDENSATE PUMP B

CONDENSATE PUMP A

CONDENSATE PUMP A

CONDENSATE PUMP B
3) HEAT PUMP COMPRESSOR START PERMISSIVE :

REBOILER (EA-21403)
MOV-21948, MOV-21950 FULLY OPEN
XV-21918 FULLY CLOSE
4) HEAT PUMP COMPRESSOR VENDOR C&E TO BE REFERRED FOR DETAIL.

(EA-21405)
5) FLUFFING AIR COMPRESSOR VENDOR C&E TO BE REFERRED FOR DETAIL.

XV-21941A/B
MOV-21948

MOV-21950
TAG NO.

GA-21001B

GA-21001A

GA-21209A

GA-21209B
GB-21401

GB-21002
XV-21918

XV-21943

XV-21923

XV-21933
CAUSE
Rev S/D SYSTEM P&ID NUMBER TAG NO. SERVICE SIL NOTES
STOP POSITION OF THE HEAT PUMP COMPRESSOR
R2B-P3-206-02-A-DTI-00414 HS-21982
(GB-21401) STOP SWITCH
S

VERY HIGH LEVEL IN THE COMPRESSOR SUCTION


R2B-P3-206-02-A-DTI-00412 LSHH-21980A/B/C
DRUM (FA-21403). (TWO OUT OF THREE)
S

VERY HIGH TEMPERATURE OF THE HEAT PUMP


R2B-P3-206-02-A-DTI-00414 TSHH-21981A/B/C COMPRESSOR DISCHARGE. (GB-21401) (TWO OUT S
OF THREE)

R2B-P3-206-02-A-DTI-00414 ZSO-21948 MOV-21947(SUCTION) NOT FULLY OPEN 2,3 S O


IS-21401
R2B-P3-206-02-A-DTI-00414 ZSO-21950 MOV-21948(DISCHARGE) NOT FULLY OPEN 2,3 S O

R2B-P3-206-02-A-DTI-00414 HS-21948A HAND SWITCH (LOCAL) TO CLOSE MOV-21948 2,3 S O/D C/D C/D

R2B-P3-206-02-A-DTI-00414 HS-21950A HAND SWITCH (LOCAL) TO CLOSE MOV-21950 2,3 S O/D C/D C/D

3 HEAT PUMP COMPRESSOR TRIP (MECHANICAL TRIP) 4 S

3 HEAT PUMP COMPRESSOR TRIP (SEAL FAILURE) 4 S O/D C/D C/D

VERY HIGH PRESSURE VAPOR FROM THE C3/C4


IS-21406 R2B-P3-206-02-A-DTI-00402 PSHH-21941A/B/C C
SPLITTER (DF-21401). (TWO OUT OF THREE)

VERY HIGH PRESSURE VAPOR FROM THE


IS-21407 R2B-P3-206-02-A-DTI-00407 PSHH-21942A/B/C C
DEETHANIZER (DF-21402). (TWO OUT OF THREE)

VERY LOW LEVER IN THE MAIN AIR BLOWER


3 R2B-P3-206-02-A-DTI-00078 LSLL-21902
SURFACE CONDENSER (SPE-21020)
S S C

3 IS-21004 R2B-P3-206-02-A-DTI-00078A HS-21917A HAND SWITCH (LOCAL) TO CLOSE XV-21923 S C

3 R2B-P3-206-02-A-DTI-00078 FSLL-21076 VERY LOW FLOWRATE OF CLEAN CONDENSATE O


VERY LOW LEVER IN THE WET GAS COMPRESSOR
3 R2B-P3-206-02-A-DTI-00234 LSLL-21903
SURFACE CONDENSER (SPE-21201)
S C S

3 IS-21201 R2B-P3-206-02-A-DTI-00234A HS-21933A HAND SWITCH (LOCAL) TO CLOSE XV-21933 S C

3 R2B-P3-206-02-A-DTI-00234 FSLL-21243 VERY LOW FLOWRATE OF CLEAN CONDENSATE O

R2B-P3-206-02-A-DTI-00080F HS-21989 FLUFFING AIR COMPRESSOR (GB-21002) STOP 5 S


IS-21005
FLUFFING AIR COMPRESSOR TRIP (MECHANICAL
3
TRIP)
5 S
NOTES Rev

3
R2B-P3-206-02-A-DTI-00130A
Page 8 of 8

R2B-P3-206-02-A-DTI-00102

R2B-P3-206-02-A-DTI-00120

R2B-P3-206-02-A-DTI-00119

R2B-P3-206-02-A-DTI-00121

R2B-P3-206-02-A-DTI-00131

R2B-P3-206-02-A-DTI-00130

R2B-P3-206-02-A-DTI-00123

R2B-P3-206-02-A-DTI-00214

R2B-P3-206-02-A-DTI-00216

R2B-P3-206-02-A-DTI-00217

R2B-P3-206-02-A-DTI-00225

R2B-P3-206-02-A-DTI-00232

R2B-P3-206-02-A-DTI-00405

R2B-P3-206-02-A-DTI-00409

R2B-P3-206-02-A-DTI-00410

R2B-P3-206-02-A-DTI-00413

R2B-P3-206-02-A-DTI-00232

R2B-P3-206-02-A-DTI-00405

R2B-P3-206-02-A-DTI-00409

R2B-P3-206-02-A-DTI-00410

R2B-P3-206-02-A-DTI-00413
Doc. TITLE : CAUSE AND EFFECT CHART
Contract Doc. No. : R2B-P3-206-02-A-CE-00001

P&ID NUMBER
Contractor Doc. No.

CAUSE AND EFFECT MATRIX


NOTES
1) LEGEND : O = OPEN, C = CLOSE, A = ACTIVATE, S = STOP
2) TRIP THE PUMPS, WHEN THE VALVE IS NOT FULLY OPENED.
3) HAND SWITCH TAG NO. FOR EBV :

EFFECT

REFLUX PUMP A (GA-21109A). (DE-ENERGIZE XY-


HS-21901A/B/C FOR EBV-21901 OPEN/CLOSE HS-21902A/B/C FOR EBV-21902 OPEN/CLOSE

MP STEAM SHUTOFF VALVE TO MAIN COLUMN


HS-21903A/B/C FOR EBV-21903 OPEN/CLOSE HS-21904A/B/C FOR EBV-21904 OPEN/CLOSE

PRIMARY ABSORBER INTERCOOLER PUMPS

DEBUTANIZER BOTTOMS RECYCLE PUMPS


HS-21905A/B/C FOR EBV-21905 OPEN/CLOSE HS-21906A/B/C FOR EBV-21906 OPEN/CLOSE

FUNCTION PERFORMED

C3/C4 SPLITTER NET OVERHEAD PUMPS

C3/C4 SPLITTER NET OVERHEAD PUMPS


HEAVY CYCLE OIL CIRCULATION PUMPS

LIGHT CYCLE OIL CIRCULATION PUMPS


HS-21919A/B/C FOR EBV-21919 OPEN/CLOSE HS-21910A/B/C FOR EBV-21910 OPEN/CLOSE

MAIN COLUMN NET OVERHEAD PUMPS

PRIMARY ABSORBER RICH OIL PUMPS


HEAVY NAPTHA CIRCULATION PUMPS
HS-21928A/B/C FOR EBV-21928 OPEN/CLOSE HS-21921A/B/C FOR EBV-21921 OPEN/CLOSE

LIGHT CYCLE OIL PRODUCT PUMPS

HIGH PRESSURE RECIEVER PUMPS

DEBUTANIZER OVERHEAD PUMPS

DEBUTANIZER OVERHEAD PUMPS


HS-21922A/B/C FOR EBV-21922 OPEN/CLOSE HS-21985A/B/C FOR EBV-21985 OPEN/CLOSE

C3 SPLITTER OVERHEAD PUMPS

C3 SPLITTER OVERHEAD PUMPS


MAIN COLUMN REFLUX PUMPS
HS-21986A/B/C FOR EBV-21986 OPEN/CLOSE HS-21987A/B/C FOR EBV-21987 OPEN/CLOSE

C3 SPLITTER BOTTOMS PUMPS

C3 SPLITTER BOTTOMS PUMPS


DEETHANIZER REFLUX PUMPS

DEETHANIZER REFLUX PUMPS


HS-21988A/B/C FOR EBV-21988 OPEN/CLOSE
4) PUMP START PERMISSIVE :
EBV-21901 FULLY OPEN FOR RAW OIL PUMPS (GA-21101A/B)
EBV-21902 FULLY OPEN FOR HEAVY CYCLE OIL CIRCULATION PUMPS (GA-21104A/B)
EBV-21903 FULLY OPEN HEAVY NAPTHA CIRCULATION PUMPS (GA-21107A/B)

RAW OIL PUMPS


EBV-21904 FULLY OPEN FOR LIGHT CYCLE OIL CIRCULATION PUMPS (GA-21105A/B)
EBV-21905 FULLY OPEN FOR MAIN COLUMN NET OVERHEAD PUMPS (GA-21110A/B) / MAIN COLUMN REFLUX PUMPS (GA-21109A/B)

21914A/B)
EBV-21906 FULLY OPEN FOR LIGHT CYCLE OIL PRODUCT PUMPS (GA-21106A/B)
EBV-21919 FULLY OPEN FOR HIGH PRESSURE RECIEVER PUMPS (GA-21203A/B)
EBV-21910 FULLY OPEN FOR PRIMARY ABSORBER RICH OIL PUMPS (GA-21204A/B)
EBV-21928 FULLY OPEN FOR PRIMARY ABSORBER INTERCOOLER PUMPS (GA-21205A/B)
EBV-21921 FULLY OPEN FOR DEBUTANIZER BOTTOMS RECYCLE PUMPS (GA-21207A/B)

GA-21101A/B

GA-21104A/B

GA-21107A/B

GA-21105A/B

GA-21110A/B

GA-21109A/B

GA-21106A/B

GA-21203A/B

GA-21204A/B

GA-21205A/B

GA-21207A/B

GA-21208A/B

GA-21401A/B

GA-21402A/B

GA-21403A/B

GA-21404A/B

GA-21208A/B

GA-21401A/B

GA-21402A/B

GA-21403A/B

GA-21404A/B
TAG NO.
EBV-21922 FULLY OPEN FOR DEBUTANIZER OVERHEAD PUMPS (GA-21208A/B)

XV-21914
EBV-21985 FULLY OPEN FOR C3/C4 SPLITTER NET OVERHEAD PUMPS (GA-21401A/B)
EBV-21986 FULLY OPEN FOR DEETHANIZER REFLUX PUMPS (GA-21402A/B)
EBV-21987 FULLY OPEN FOR C3 SPLITTER BOTTOMS PUMPS (GA-21403A/B)

CAUSE
Rev S/D SYSTEM P&ID NUMBER TAG NO. SERVICE SIL NOTES

IS-21105 R2B-P3-206-02-A-DTI-00101 ZSO-21901 EBV VALVE (EBV-21901) NOT FULL OPEN 2 S

IS-21106 R2B-P3-206-02-A-DTI-00120 ZSO-21902 EBV VALVE (EBV-21902) NOT FULL OPEN 2 S

IS-21107 R2B-P3-206-02-A-DTI-00119 ZSO-21903 EBV VALVE (EBV-21903) NOT FULL OPEN 2 S

IS-21108 R2B-P3-206-02-A-DTI-00121 ZSO-21904 EBV VALVE (EBV-21904) NOT FULL OPEN 2 S

IS-21109 R2B-P3-206-02-A-DTI-00128 ZSO-21905 EBV VALVE (EBV-21905) NOT FULL OPEN 2 S S C

IS-21110 R2B-P3-206-02-A-DTI-00122 ZSO-21906 EBV VALVE (EBV-21906) NOT FULL OPEN 2 S

IS-21202 R2B-P3-206-02-A-DTI-00213 ZSO-21919 EBV VALVE (EBV-21919) NOT FULL OPEN 2 S

IS-21203 R2B-P3-206-02-A-DTI-00215 ZSO-21910 EBV VALVE (EBV-21910) NOT FULL OPEN 2 S

IS-21204 R2B-P3-206-02-A-DTI-00217 ZSO-21928 EBV VALVE (EBV-21928) NOT FULL OPEN 2 S

IS-21206 R2B-P3-206-02-A-DTI-00229 ZSO-21921 EBV VALVE (EBV-21921) NOT FULL OPEN 2 S

IS-21207 R2B-P3-206-02-A-DTI-00230 ZSO-21922 EBV VALVE (EBV-21922) NOT FULL OPEN 2 S

IS-21402 R2B-P3-206-02-A-DTI-00403 ZSO-21985 EBV VALVE (EBV-21985) NOT FULL OPEN 2 S

IS-21403 R2B-P3-206-02-A-DTI-00408 ZSO-21986 EBV VALVE (EBV-21986) NOT FULL OPEN 2 S

IS-21404 R2B-P3-206-02-A-DTI-00411 ZSO-21987 EBV VALVE (EBV-21987) NOT FULL OPEN 2 S

IS-21405 R2B-P3-206-02-A-DTI-00412 ZSO-21988 EBV VALVE (EBV-21988) NOT FULL OPEN 2 S

LOW LEVEL IN THE DEBUTANIZER RECEIVER


3 IS-21208 R2B-P3-206-02-A-DTI-00230 LSL-21208 S
(FA-21206).

LOW LEVEL IN THE C3/C4 SPLITTER RECEIVER


3 IS-21408 R2B-P3-206-02-A-DTI-00403 LSL-21403 S
(FA-21401).

LOW LEVEL IN THE DEETHANIZER RECEIVER


3 IS-21409 R2B-P3-206-02-A-DTI-00408 LSL-21409 S
(FA-21402).

3 IS-21410 R2B-P3-206-02-A-DTI-00411 LSL-21413 LOW LEVEL IN THE C3 SPLITTER (DF-21403). S

LOW LEVEL IN THE COMPRESSOR SUCTION DRUM


3 IS-21411 R2B-P3-206-02-A-DTI-00412 LSL-21980A S
(FA-21403).