DOCUMENT TITLE : BA-40001 Cause and Effect Diagram

PTI-ID V/P NO : R2B-P2-205-03-H-CE-47233


SECL V/P NO : SO6625-MBA419-01-J1CNE001-001
REQUISITION NO : MBA419 / 2B-205-1-0-H-RQ-0006
PURCHASE ORDER NO : PTI-ID-PROC-47-2020
ITEM DESCRIPTION : Fired Heater (LLI-HDTGO)

□ APPROVED □ WITH COMMENT


□ REVIEWED □ RESUBMIT

This approval or review does not relieve the vendor /


subcontractor of his responsibilities to meet all
requirements of the purchase order

ORIGINAL CHECKED APPD(PRJ)

SIGN

DATE
SAMSUNG ENGINEERING CO., LTD

E 07-FEB-2022 FOR APPROVAL NCA SHV MHT


✔ Approved
PM
D 18-OCT-2021 FOR APPROVAL NCA SHV MHT
Approved with comment
C 30-AUG-2021 FOR APPROVAL NCA SHV MHT
Approved with comment / Resubmit
B 8-APR-2021 FOR APPROVAL ANG
Reject / Resubmit
MHT MHT
A 12-FEB-2021 FOR APPROVAL CCE
Reviewed / Information Only MHT MHT
29 Mar 2022
REV DATE DESCRIPTION Reviewed with Comment / CHECKED
PREPARED Resubmit APPROVED
SAMSUNG
This approval or review does not relieve the ENGINEERING CO., LTD
vendor / subcontractor of his responsibilities to
Meet all requirements of the purchase order.
Dos Bocas New Refinery Project
ORIGINAL CHECKED

SIGN.

PTI-Infraestructura de Desarrollo, S.A. de C.V. (PTI-ID)


DATE 29 Mar 2022 29 Mar 2022

SAMSUNG ENGINEERING CO., LTD

SAMSUNG Ingeniería Manzanillo, S.A. de C.V.

Heurtey Petrochem Solutions


Engineering & Solutions
Petro-Chem Development Co., Inc.
COLUMN NUMBER A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA
CLIENT: PTI-ID
PURCHASER: SAMSUNG

BA-40001 DOWNSTREAM PILOT GAS SHUTDOWN VALVE

BA-40001 DOWNSTREAM FUEL GAS SHUTDOWN VALVE

BA-40001 NATURAL DARFT DOOR 1 ON-OFF DAMPER

BA-40001 NATURAL DARFT DOOR 2 ON-OFF DAMPER


LOCATION: NUEVA REFINERIA DOS BOCAS, TABASCO

BA-40001 RESIDUE RECYCLE LINE SHUT-OFF VALVE


BA-40001 UPSTREAM PILOT GAS SHUTDOWN VALVE

BA-40001 UPSTREAM FUEL GAS SHUTDOWN VALVE


ITEM NUMBER: BA-40001

BA-40001 PILOT GAS VENT SHUTDOWN VALVE

BA-40001 FUEL GAS VENT SHUTDOWN VALVE

INTERLOCK SHUTDOWN SIGNALS IS-40061


SERVICE: FRACTIONATOR FEED HEATER

BA-40001 MP STEAM SHUT-OFF VALVE


PROJECT: DOS BOCAS REFINERY PROJECT

BA-40001 FLOW CONTROL VALVE


EQUIPMENT DESCRIPTION
PO: PTI-ID-PROC-47-2020

BA-40001 STACK DAMPER


EFFECTS

BA-40001 FD FAN A

BA-40001 FD FAN B
BA-40001 ID FAN
LEGEND
A ALARM
S START
ROW NUMBER

T STOP/TRIP
P PERMISSIVE
O OPEN
C CLOSE
SD SHUTDOWN
X ACTION/REQUIREMENT

CAUSES

BA-40001-BV02

BA-40001-BV01A

BA-40001-BV01B
HV-40098
XV-40934

XV-40932

XV-40933

XV-40937

XV-40935

XV-40936

XV-40938

XV-40939

PV-40201

XV-40950

XV-40921

IS-40061

REV.
INTERLOCK
PCD P&ID SERVICE DESCRIPTION TAG NUMBER
NUMBER

1 IS-40061 (6) F-20-2103-16-01, Sheet 2 of 6 INTERLOCK SHUTDOWN SIGNALS IS-40038 IS-40038 C C O O T X (4)
2 IS-40060 (6) F-20-2103-16-01, Sheet 3 of 6 BA-40001 PILOT GAS PRESSURE LOW LOW (2oo3) PALL-40901A/B/C C C O C C O O T T T X (4)
3 IS-40060 (6) F-20-2103-16-01, Sheet 3 of 6 BA-40001 PILOT GAS PRESSURE HIGH HIGH (2oo3) PAHH-40901A/B/C C C O C C O O T T T X (4)
4 IS-40061 (6) F-20-2103-16-01, Sheet 3 of 6 BA-40001 MAIN GAS PRESSURE LOW LOW (2oo3) PALL-40902A/B/C C C O O T X (4)
5 IS-40061 (6) F-20-2103-16-01, Sheet 3 of 6 BA-40001 MAIN GAS PRESSURE HIGH HIGH (2oo3) PAHH-40902A/B/C C C O O T X (4)
6 IS-40064 (6) F-20-2103-16-01, Sheet 6 of 6 BA-40001 EMERGENCY SHUTDOWN LOCATED 15m FROM HEATER HS-40951A C C O C C O O T T T X (4)
7 IS-40064 (6) F-20-2103-16-01, Sheet 6 of 6 BA-40001 EMERGENCY SHUTDOWN LOCATED IN CONTROL ROOM HS-40951B C C O C C O O T T T X (4)
8 IS-40022 (6) F-20-2103-16-01, Sheet 2 of 6 BA-40001 ARCH PRESSURE HIGH HIGH (2oo3) PAHH-40913A/B/C C C O O T X (4)
9 IS-40022 (6) F-20-2103-16-01, Sheet 2 of 6 BA-40001 ARCH PRESSURE HIGH (2oo3) PAH-40913A/B/C O
10 IS-40066 (6) F-20-2103-16-01, Sheet 4 of 6 BA-40001 FLUE GAS TEMPERATURE LEAVING APH HIGH HIGH (2oo3) TAHH-40188A/B/C O T
11 IS-40065 (6) F-20-2103-16-01, Sheet 4 of 6 BA-40001 COMBUSTION AIR FLOWRATE LOW LOW FALL-40975 O T T T O O X (5)
12 IS-40065 (6) F-20-2103-16-01, Sheet 4 of 6 BA-40001 COMBUSTION AIR OUTLET PRESSURE LOW LOW (2oo3) PALL-40903A/B/C O T T T O O X (5)
13 IS-40066 (6) F-20-2103-16-01, Sheet 4 of 6 BA-40001 INDUCED DRAFT FAN FAILURE (SIS) BA-40001-BV02 O T
14 IS-40065 (6) F-20-2103-16-01, Sheet 4 of 6 BA-40001 FORCED DRAFT FAN FAILURE (SIS) BA-40001-BV01A/B O T T T O O X (5)
15 IS-40067 (6) F-20-2103-16-01, Sheet 4 of 6 BA-40001 DROP OUT DOOR 1 FAILURE XV-40938 C C O O (7) (7) (7) X (4)
16 IS-40067 (6) F-20-2103-16-01, Sheet 4 of 6 BA-40001 DROP OUT DOOR 2 FAILURE XV-40939 C C O O (7) (7) (7) X (4)
17 IS-40038 F-20-2103-16-01, Sheet 2 of 6 BA-40001 WARM FRACTIONATOR FEED FLOWRATE LOW LOW (PASS 1 TO 8) FT-40929 A-H O O X
18 IS-40038 F-20-2103-16-01, Sheet 2 of 6 BA-40001 WARM FRACTIONATOR FEED OUTLET TEMPERATURE HIGH HIGH TAHH-40956 O O X
19 IS-40061 (6) - INTERLOCK SHUTDOWN SIGNALS IS-40034 (8) IS-40034 C C O O T X (4)
20 IS-40061 (6) - INTERLOCK SHUTDOWN SIGNALS IS-40035 (8) IS-40035 C C O O T X (4)
21 IS-40061 (6) - INTERLOCK SHUTDOWN SIGNALS IS-40039 (8) IS-40039 C C O O T X (4)
22 IS-40022 (6) F-20-2103-16-01, Sheet 4 of 6 BA-40001 COMBUSTION AIR OUTLET PRESSURE HIGH HIGH (2oo3) PAHH-40903A/B/C C C O O T X (4) E
23
24
25
26
27
28
29
30
NOTES: PETRO-CHEM DEVELOPMENT, CO., INC
REFERENCE DRAWINGS:
(1) CLIENT TO ADVISE FUNCTION PERFORMED FOR TAG NO. SPECIFIED
(2) IF ANY PASS OF BA-40001 IS LOW LOW FLOW, IS-40038 IS ACTIVATED.
P&ID E 7-Feb-22 Issued for Approval NCA SHV MHT
F-20-2103-16-01 (3) DELETED
(4) SIS TO COMMAND CONTROLLER TO RAMP TO 0% AND LEAVE IN MANUAL.
D 18-Oct-21 Issued for Approval NCA SHV MHT
(5) SIS TO COMMAND CONTROLLER TO RAMP TO POSITION EQUIVALENT TO 50% FIRING RATE. THEN DCS TO COMMAND CONTROLLER TO SLOWLY
RAMP TO POSITION EQUIVALENT TO 67% OF FIRING RATE OF BALANCED DRAFT CASE.
C 30-Aug-21 Issued for Approval NCA SHV MHT CAUSE AND EFFECT E
(6) BURNER MANAGEMENT SYSTEM
B 8-Apr-21 Issued for Approval ANG MHT MHT
(7) IN THE CASE OF THE DROP OUT DOORS FAILURE, THE FANS ARE ALREADY TRIPPED WHEN THE CONDITIONS OF THE DROP OUT DOORS FAILURE FIRST TRAIN REACTOR HEATER (BA-40001)
ARE ACTIVATED.
(8) REFER TO THE CAUSE AND EFFECT TABLE R2B-P2-205-02-A-CE-00001. A 12-Feb-2021 Issued for Approval CCE MHT MHT
DOCUMENT NUMBER SHEET REV
REV. DATE REVISION BY CHK APPD F-20-2103-CE-01-01 1 OF 1 E