Nghi Son 2 BOT Thermal Power Plant Project

Design Query Sheet

DQ Sheet No DQ-NS2-DH01-P0ZEN-140017-B-WSP1
Document Title Inspection and Test Plan For Field Instrument DCS Cabinet, LCP, IR, JB and Office Equipment Installation
Document No NS2-DH01-P0ZEN-140017 Rev B
Status Description Disapproved (revise and resubmit) Status Code 3
These comments and/or approval by the Owner / Owners Engineer’s in no way relieves the Contractor from his obligations to ensure conformance with the requirements of
the Contract. Any Contract deviations found subsequent to approval are to be corrected by the Contractor to the satisfaction of the Owner / Owners Engineer’s.
Sl No Cl. No & page no Item description Comment details

1 Item 1.1 Material Owner /OE’s Comment dated 27-01-2020


verification
Please list out what kind of equipment included for inspection.

1.1 Contractors response dated DD-MM-YYYY


Note: Please Refer to Item 1.1, 2.1, 3.1, 4.1,5.1

1.2 Owner /OE’s Comment dated 16-03-2020


Noted- Item closed.

2 Item 1.17 Inspection & Test Owner /OE’s Comment dated 27-01-2020
process
Please add ‘Check whether thermocouple’s damage has or not’ and the Owner inspection level is ‘W’.

2.1 Contractors response dated DD-MM-YYYY


Note. This item was added.

2.2 Owner /OE’s Comment dated 16-03-2020


Noted- Item closed.

3 General Codes & Standards Owner /OE’s Comment dated 27-01-2020


DQ-NS2-DH01-P0ZEN-140017-B-WSP1 Page 1 of 3
Sl No Cl. No & page no Item description Comment details

Please specify details of approved construction drawing number and the Codes & Standards are referring to.

3.1 Contractors response dated DD-MM-YYYY


Note. Please Refer to Items 1,2,3,4,5

3.2 Owner /OE’s Comment dated 16-03-2020


Noted- Item closed.

4 General Leak Test Owner /OE’s Comment dated 27-01-2020


Please submit testing procedure for approval before test.

4.1 Contractors response dated DD-MM-YYYY


Note. Please Refer to NS2-DD09-P0ZEN-140017, item 7.1.9.2.

4.2 Owner /OE’s Comment dated 16-03-2020


Noted- Item closed.

5 General Acceptance Owner /OE’s Comment dated 27-01-2020


Criterial
Please provide details of Acceptance & Rejection criteria for each item.

5.1 Contractors response dated DD-MM-YYYY

5.2 Owner /OE’s Comment dated 16-03-2020


Please reply as Owner commented above.

6 Item 3 Acceptance Owner /OE’s Comment dated 27-01-2020


Criterial
How many bar for hydrostatic test pressure?

6.1 Contractors response dated DD-MM-YYYY

DQ-NS2-DH01-P0ZEN-140017-B-WSP1 Page 2 of 3
Sl No Cl. No & page no Item description Comment details

Note. Please Refer to Items 1,2,3,4,5

6.2 Owner /OE’s Comment dated 16-03-2020


Please answer strictly the question by Owner commented.

7 Item Owner inspection Owner /OE’s Comment dated 27-01-2020


2.5;2.6;2.10;2.11; level
Please change to ‘W’.
2.12;2.13;2.14;2.15;
7.1 Contractors response dated DD-MM-YYYY
5.3;5.5;5.7;
Note. Refer to those items in ITP.
6.3;6.4;6.5;6.6;6.76.
8
7.2 Owner /OE’s Comment dated 16-03-2020
Please clarify from Item 5.4 to item 5.9 Owner inspection level is Witness but contractor inspection level is
Surveilance.

8 Item 4.0 Owner /OE’s Comment dated 17-03-2020


1. Doosan to add Inspection for Instrument support such as IR support and stanchion, and to separate it from
item 1.0
2. Checking cable connection such as internal wiring, cable gland, flexible conduit shall be required for item 3.0

8.1 Contractors response dated DD-MM-YYYY

9 Item 2.0 Inspection Report Owner /OE’s Comment dated 17-03-2020


for Instrument
For wet-leg transmitters used in steam service, demi water filling shall be checked. DVN to add one more step to
Installation
check.

9.1 Contractors response dated DD-MM-YYYY

DQ-NS2-DH01-P0ZEN-140017-B-WSP1 Page 3 of 3