DESIGN CRITERIA FOR EARTHING AND LIGHTNING
NS2-YR07-P0BAU-140003
CONTENTS
1. GENERAL ............................................................................................................................ 4
Rev.1INT3 3 of 8
DESIGN CRITERIA FOR EARTHING AND LIGHTNING
NS2-YR07-P0BAU-140003
1. GENERAL
This document is intended to cover the design criteria for earthing and lightning protection system for
Nghi Son 2 BOT Thermal Power Plant Project.
4. EARTHING SYSTEM
4.1 Types of Earthing System
a. System earthing: It is intended to protect the personnel from injury and property from
damage.These connections are made to the part of the system who are not usually energized but
may become live due to an abnormal condition.
b. Equipment earthing: This ensures low impedance return path for ground current should an
electrical fault occur between the Live conductor and equipment enclosure.
Three earth system are set up :
a. General earthing network: this consists of Under-ground & above ground earthing system. *All
metallic parts of equipment and structures shall be connected to this general earth network.
b. Electronic earthing network: the design of electronic earthing network shall confirm to the need
of I&C System of the plant & the guidelines of the DCS Manufacturer for DCS Earthing. PVC
insulated copper wire shall be used to connect the equipment to general earth network. Instrument
grounding system shall be connected to the main earthing grid. The electronic earthing system
shall be of low noise type.
c. Lightning protection: this comprises of air terminations and down conductor installed to protect
buildings like chimneys and other important areas. Each Down conductor shall be clamped and
directly connected to main earthing grid. Interconnecting conductors between air terminal rods
shall be provided.
Rev.1INT3 4 of 8
DESIGN CRITERIA FOR EARTHING AND LIGHTNING
NS2-YR07-P0BAU-140003
Plant earthing system shall comprise of a buried copper conductor ground grid enhanced by ground rods.
Typical spacing between parallel conductors shall be 30 m. The LV network system shall be TN-S.
The complete earthing system shall have a maximum earth resistance value of 0.5 ohm at any point of the
earthing system to minimize the potential rise in the event of a fault.
The earthing conductor size for grid shall be sized to carry maximum ground fault current for a duration of
1 second in order to ensure adequate cross-sectional area.
The main earth grid shall consist of bare copper conductors of 240 mm2 buried at a minimum depth of 0.8
m below ground level & then backfilled with soil. This system shall be installed uniformly over the entire
power plant with the mesh size calculated by IEEE 80.
All electrical equipment such as motors, transformers, switchboards, control boards, Tanks, Hoppers,
Conveyors and all other subsidiary electrical equipment, as well as all metal parts of the mechanical
equipment which might be subject to earth fault currents shall be connected to the main earth grid via
earthing terminals or directly as per IEC 60364-5-54. Above grounding conductors shall be PVC insulated
copper wire. For the purpose of safety and reliability, all equipment would be connected to the earthing
system .
All interconnections with the underground earth grid shall be made by cad-weld/Exothermic welding. All
connection points above ground shall be made by bolting or compression connection. All instrument boxes
shall be earthed at one point only.
Note
* : For the detailed earthing concept of LV motor(below 30kW) and MOV, please refer to criteria no. 4.3.5.
Rev.1INT3 5 of 8
DESIGN CRITERIA FOR EARTHING AND LIGHTNING
NS2-YR07-P0BAU-140003
According to the 11TCN-18, spacing between parallel conductors in transformer yard area shall be 6 m.
4.3.4 Lighting
MLDB/LDB shall be earthed at two distinct points to the main earth grid.
Posts for street lights, CCTV shall be earthed from main earth grid via a separate earthing conductor. But
if away from the main earthing grid, earthing rod shall be installed near the lighting/CCTV pole.
PE conductor shall be provided for lighting circuit suitable to TN-S network.
4.3.5 Motors
a. MV Motor : All medium voltage motors shall be connected to the general earthing system at two
points by earthing wire.
b. LV Motors : LV Motors(30kW and above) shall be earthed via the earth conductor of the power
cable where applying multi-core cable. Where applying single-core cable, LV Motors(30kW and
1INT3
above) shall be earthed via PVC wire bonded with barecopper earthing conductor running in
cable tray that is connected with earthing busbar inside SWGR/MCC. One(1) more earthing
connection to local earthing system shall be provided.
c. LV motors(below 30kW) and MOV shall be earthed via the earth conductor of the power cable
based on IEC 60364-5-54.
Rev.1INT3 6 of 8
DESIGN CRITERIA FOR EARTHING AND LIGHTNING
NS2-YR07-P0BAU-140003
Rev.1INT3 7 of 8
DESIGN CRITERIA FOR EARTHING AND LIGHTNING
NS2-YR07-P0BAU-140003
k. Tanks con-structed so as to receive a stroke of lightning without damage shall require only
bonding to grounding electrodes.
End of Document