Nghi Son 2 BOT Thermal Power Plant Project

Design Query Sheet

DQ Sheet No DQ-NS2-DD09-P0ZEN-140002-A-WSP1
Document Title Method Statement for Conduit System
Document No NS2-DD09-P0ZEN-140002 Rev A
Status Description Approved except as noted (revise and resubmit)except as noted Status Code 2
These comments and/or approval by the Owner / Owners Engineer’s in no way relieves the Contractor from his obligations to ensure conformance with the requirements of
the Contract. Any Contract deviations found subsequent to approval are to be corrected by the Contractor to the satisfaction of the Owner / Owners Engineer’s.
Sl No Cl. No & page no Item description Comment details

1 General Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s(WSP)


Dedicated conduits to be provided for type 1 , type 2&3 and type 4 cables and conduits carrying earth wires/cables.

1.1 Contractors response dated DD-MM-YYYY

2 General Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s (PECC3)
Please replace “contract drawing” with “approved drawing”.

2.1 Contractors response dated DD-MM-YYYY

3 Clause 3, page 2 of Reference Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s (PECC3)
21
Please show specific local standards & other standards and attach manufacturer’s manual for installation.

3.1 Contractors response dated DD-MM-YYYY

4 Clause 5.1.1, Page- Catalogues and Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s(WSP)
4 of 21 Data sheet
Please include the statement below;
“Technical catalogues/data sheets of conduits, fittings, supports & hardwires and joints to be furnished during

529828229.docx Page 1 of 4
Sl No Cl. No & page no Item description Comment details

installation”

4.1 Contractors response dated DD-MM-YYYY

5 Clause- 5.1.5, Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s(WSP)
Page- 4 of 21
Structural rack support layout and section drawing with dimensions to be furnished. Please ensure that the rack
supports are not overloaded beyond the load carrying capacity.

5.1 Contractors response dated DD-MM-YYYY

6 Pull box Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s(WSP)
Pull boxes to be provided at suitable intervals in the conduit runs

6.1 Contractors response dated DD-MM-YYYY

7 Clause- 5.1.22 Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s(WSP)
Page-6 of 21
The spare conduit shall be sealed at both ends.

7.1 Contractors response dated DD-MM-YYYY

8 Conduit mark up Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s(WSP)
Suitable mark-up of conduits at suitable intervals to be embossed indicating voltage grade, application/type, conduit
number as per conduit layout drawings

8.1 Contractors response dated DD-MM-YYYY

529828229.docx Page 2 of 4
Sl No Cl. No & page no Item description Comment details

9 Earthing of Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s(WSP)


metallic conduit
Earthing of metallic conduits shall also be indicated in this document or the Method Statement for Earthing and
Lightning Protection System to be added in the list of referred documents .

9.1 Contractors response dated DD-MM-YYYY

10 Clause 5.6, page 9 Installation of Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s (PECC3)
of 21 Underground
Embedded conduits and duct bank should be numbered temporarily for easy pulling of cable.
Conduit and Duct
Banks Please describe excavation, support of conduits, back filling and warning tap.

10.1 Contractors response dated DD-MM-YYYY

11 Clause 5.7, page 9 Installation of Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s (PECC3)
of 21 Conduit Supports
Please show specific NEC recommendation.

11.1 Contractors response dated DD-MM-YYYY

12 Clause 5.8.3 & Installation of Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s (PECC3)
5.8.4, page 10 of Conduit for other
5.8.3: Conduit run shall not obstruct walk way, access way, platform, floor, ….
21 item area
5.8.4: Please show acceptance distance to the hot surface or other places of high ambient temperature

12.1 Contractors response dated DD-MM-YYYY

13 Clause 7, page 21 Documentation Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s (PECC3)
of 21
Please add drawing list of all drawings/documents related to conduit.

529828229.docx Page 3 of 4
Sl No Cl. No & page no Item description Comment details

13.1 Contractors response dated DD-MM-YYYY

14 General Owner /OE’s Comment dated 14-10-2018 Commented by: OE’s (PECC3)
Welding part, cutting part of support, conduit shall be re-painted and touched up to prevent corrosion.

14.1 Contractors response dated DD-MM-YYYY

15 Owner /OE’s Comment dated 14-10-2018 Commented by: Owner


Contractor to correct the project name in cover page to “Nghi Son 2 BOT Thermal Power Plant Project”

15.1 Contractors response dated DD-MM-YYYY