Nghi Son 2 BOT Thermal Power Plant Project

Design Query Sheet

DQ Sheet No DQ-NS2-DD09-P0ZEN-169402-D-WSP1
Document Title Method Statement for Landscaping Work
Document No NS2-DD09-P0ZEN-169402 Rev D
Status Description Approved except as noted (revise and resubmit) Status Code 2
These comments and/or approval by the Owner / Owners Engineer’s in no way relieves the Contractor from his obligations to ensure conformance with the requirements of
the Contract. Any Contract deviations found subsequent to approval are to be corrected by the Contractor to the satisfaction of the Owner / Owners Engineer’s.
Sl Cl. No & Item
Comment details
No page no description
1 General Owner /OE’s Comment dated 27-May-21
- Please mention detail where area which tree will grow and size and deep of hole for each kind of tree.
- Please make detail of Irrigation System

1.1 Contractors response dated 01-06-2021


- Planting plan was provided. “The depth of the planting pit will vary but shall match root ball depth and not less than 65 cm”
(refer to contents 5.5).
- Detail of irrigation system was provided.

1.2 Owner /OE’s Comment dated 7-Jun-21


- Please provide approved drawing of tree plant and Irrigation System

1.3 Contractors response dated 14-06-2021


Tree plan and Irrigation system are showed in the approved Landscaping drawing NS2-XB02-P0UZK-165506 (Rev. 1) which was issued.
Owner can refer to this.

1.4 Owner /OE’s Comment dated 18-Jun-21


- Noted & Closed

550208689.docx Page 1 of 4
Sl Cl. No & Item
Comment details
No page no description
2 Site Owner /OE’s Comment dated 7-Jun-21
preparation
- Please add site preparation, levelling, and compaction before start landscaping work.
and
levelling - For the large area of grass, please arrange the stormwater drainage system to ensure no water pond.
- For gravel area, please provide measure to ensure no grass/weed growing.

2.1 Contractors response dated 14-06-2021


- Item was added
- The elevation and compaction will be checked carefully to ensure no water stagnant in the future
- DVN will manage & remove all grass/weeds when handover to the Owner

2.2 Owner /OE’s Comment dated 18-Jun-21


- Noted
- Please make drainage system
- Noted

2.3 Contractors response dated -08-2021


- Noted
- The appropriate slope and compaction will be applied and controlled through construction stage (slope ≥ 1.5%).
(please refer to below detailed sketch of flow direction)
Stormwater drainage system is already designed by ditch and concrete pipe to cover whole power plant area.
In addition, DVN marked direction of stormwater drainage in landscape drawing.
- Noted

550208689.docx Page 2 of 4
Sl Cl. No & Item
Comment details
No page no description

2.4 Owner /OE’s Comment dated 20-Jul-21


- Not accepted. DVN shall check the actual site condition and provide SW drainway for some large areas.

550208689.docx Page 3 of 4
Sl Cl. No & Item
Comment details
No page no description

550208689.docx Page 4 of 4