900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Issuer: Contractor Comment Sheet ID.: F08643S-S0206-03 Issued on: 08.12.2020


Contactor: hanlei@china-hei.com Stage: Detail Design Completion Date: 14.12.2020

Reviewer KE Document Control TEG Document Control NESPAK Document Control RE2 Document Control
Contact: ...............@ke.com.pk piotr.sputo@tractebel.engie.com haseeb.saqib@nespak.com.pk ke.design@renewableresources.com.pk

Drawing/Document ID: F08643S-S0206-03


Drawing/Document Title: DETAILS OF SUPPORT (1)

The Categories of Approval: 1 = Approved, no comments / reviewed

Cat: 2
Besides the information discussed in the following, it is assumed that
2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the 3 = Not approved, rejected / returned for correction
Contractor from fulfilling his contractual obligations. 4 = For information only

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
1. 0 KE NILL Please check beam L1 reinforcement shall be provided Change the layout plan.
end to end therefore section 2-2 shall provide and
incorporate detail of beam reinforcement as well

2. 0 KE NILL Kindly revise notes of soil replacement from excavated Sir ,it is better to follow GB
soil with Moorum or A-1-a/b material due to dynamic code same as the other areas.
loading requirement.

3. 0 NES NILL Please refer to our comments on document no. F08643S- Noted.
S0206-CA

4. 0 NES NILL Reference no. of all the related approved drawings of Noted.
Civil/Architectural sections shall be incorporated in the
drawing.

5. 0 NES NILL The depth of foundation, underneath select-fill, bearing Noted.


capacity and compaction requirement shall be as per
Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
Geo-technical recommendation.

6. 0 NES NILL Foundation shall be placed below NSL. Most of the foundation level is
3.200m.

7. 1 NES 3 Please refer to our comments on document no. F08643S-


S0206-CA

8. 1 NES 4 to 6 Noted

One behalf ofthe Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:

Signature
:

Date:

Page 2 of 2