900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Issuer: Contractor Comment Sheet ID.: E113S-Q&K-T0307-03 Issued on:


Contactor: hanlei@china-hei.com Stage: Detail Design Completion Date: 19.02.2021

Reviewer KE Document Control TEG Document Control NESPAK Document Control RE2 Document Control
Contact: Amir.ipbal@ke.com.pk piotr.sputo@tractebel.engie.com haseeb.saqib@nespak.com.pk ke.design@renewableresources.com.pk

Drawing/Document ID: E113S-Q&K-T0307-03

Drawing/Document Title: 132kV S.A.& C.S.E. FOUNDATION

The Categories of Approval: 1 = Approved, no comments / reviewed

Cat: 3
Besides the information discussed in the following, it is assumed that 2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the Con- 3 = Not approved, rejected / returned for correction
tractor from fulfilling his contractual obligations. 4 = For information only

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the re-
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = vised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
1. 0 NE NIL Please refer to our comments on document no. E113S-
Q&K-T0307-CS-01 (Equipment Support Structure Report)
2. 0 NES NIL Top and bottom level of pile cap and top level of pile shall Noted
be as per approved Structural design and shall be
confirmed at site. M/s HEI shall confirm.
3. 0 NES NIL Piles cut off levels as mentioned in the drawings are Confirmed
assumed to be correct and M/s HEI shall confirm.
4. 0 NES NIL Clearly specify in drawings that the pile capacities are Noted and incororated
with group efficiency or without group efficiency. Add a
note in the drawings
5. 0 NES NIL The measures taken to for retaining and protection of Confirmed
foundation excavation, shall be approved by site staff be-
fore execution of work. M/s HEI shall confirm.
6. 0 NES NIL Membrane detail shall be rectified Noted and incorporated
7. 0 NES NIL Plastic hinge rebar shall be provided in sand stone as per
GB code recommended length
8.
9.
F08643S-T0212-01PILE LAYOUT Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the re-
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = vised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
10.
11.
12.
13.
14.
15.

One behalf ofthe Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:

Signature
:

Date:

F08643S-T0212-01PILE LAYOUT Page 2 of 2