900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Issuer: Contractor Comment Sheet ID.: E113S-Q&K-T0307-02 Issued on: 05.02.2021


Contactor: hanlei@china-hei.com Stage: Detail Design Completion Date: 19.02.2021

Reviewer KE Document Control TEG Document Control NESPAK Document Control RE2 Document Control
Contact: Amir.ipbal@ke.com.pk piotr.sputo@tractebel.engie.com haseeb.saqib@nespak.com.pk ke.design@renewableresources.com.pk

Drawing/Document ID: E113S-Q&K-T0307-02 

Drawing/Document Title: 132kV S.A.& C.S.E. FOUNDATION

The Categories of Approval: 1 = Approved, no comments / reviewed

Cat: 3
Besides the information discussed in the following, it is assumed that 2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the Con- 3 = Not approved, rejected / returned for correction
tractor from fulfilling his contractual obligations. 4 = For information only

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the re-
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = vised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
1. 0 KE NIL HEI to provide water proofing measures for the pile cap. Noted and incorpoarated in
Drawing
2. 0 KE NIL HEI to revise top level of pedestals as grading level of Noted and incorpoarated in
that area is around 5.3m to 5.4m. subject foundation shall Drawing
be at least 200mm higher than the surrounding level.
3. 0 KE NIL Mid depth bars in section a-a are missing, HEI to check. Noted and incorpoarated in
Drawing
4. 0 KE NIL HEI to provide coating & protection of all metal parts as Noted
per KE specifications.
5. 0 NE NIL Please refer to our comments on document no. E113S- Noted
Q&K-T0307-CS-01 (Equipment Support Structure Report)
6. 0 NE NIL Top and bottom level of pile cap and top level of pile shall Noted
be as per approved Structural design and shall be
confirmed at site. M/s HEI shall confirm.
7. 0 NE NIL Pilecap width shall be rectified as per GB code Noted and incorporated
8. 0 NE NIL Membrane detail shall be as per RFP Noted and incorporated
9. 0 NE NIL Skin bars in pile caps shall be provided Provided
10. 0 NE NIL Reinforcement detailing shall be s per GB code/16G101. Noted and incorporated in
F08643S-T0212-01PILE LAYOUT Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the re-
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = vised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
A note shall be added drawing
11. 0 NE NIL Design of bolts and base plate is not reviewed. Designer Confirmed
shall be responsible solely for its design. M/s HEI shall
confirm

One behalf ofthe Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:

Signature
:

Date:

F08643S-T0212-01PILE LAYOUT Page 2 of 2