900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Issuer: Contractor Comment Sheet ID.: E113S-KPC-T0201-07 Issued on: 20.11.2020


Contactor: hanlei@china-hei.com Stage: Detail Design Completion Date: 02.12.2020

Reviewer KE Document Control NESPAK Document Control


Contact: Amir.ipbal@ke.com.pk piotr.sputo@tractebel.engie.com haseeb.saqib@nespak.com.pk ke.design@renewableresources.com.pk

Drawing/Document ID: E113S-KPC-T0201-07


Drawing/Document Title: DETAIL OF OUTDOOR STEPS EL.1.400m

The Categories of Approval: 1 = Approved, no comments / reviewed

Cat: 3
Besides the information discussed in the following, it is assumed that 2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the Con- 3 = Not approved, rejected / returned for correction
tractor from fulfilling his contractual obligations. 4 = For information only

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering GmbH (Owner’s Action
Engineer); NES = NESPAK (Owner’s Engineer); RE2 = Renewable Resources Ltd. (To be submitted together with
(Owner’s Engineer)] the revised/completed docu-
ments)
1. 0 KE NIL Please mention reference drawing number for stairs finishing
details in notes
2. 0 KE NIL Sample of railing shall be approved on site.
3. 0 KE NIL Stair post embedded casing material shall be of GI
4. 0 KE NIL In section 2-2, mark waterproofing details
5. 0 KE NIL In section 1-1 GL is marked as 0.00 while in section 2-2 it is
marked as -0.500. HEI to rectify.
6. 0 KE NIL All metal plates shall be hot dip galvanized & protective coating
applied as per KE specifications.
7. 0 NE NIL The size of loading platform shall be finalised as per operational
requirments considering the maximum size of
equipment/component to be transported through it. HEI shall
check and confirm.

Further, as per architecture drawings the main door is opening


outwards onto the platform. Kindly consider the obstruction by
door for finalising the size of platform.
Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

One behalf of the Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:

Signature:

Date:

Page 2 of 2