Form DOCUMENT TRANSMITTAL Transmittal No.

:
D-111214: DTS-004-Rev.01
Date: 17 October 2023
CLIENT: Abu Dhabi Distribution Company TRANSMITTED FOR CODE
Construction of 33KV Switching Station, 33KV Panel Modifications
PROJECT: and Diversions of Existing Cables to Provide Power Supply to New APPROVAL 1
Development in ICAD 3
CONTRACT: D-111214 INFORMATION 2
CONTRACTOR: Prime Engineering Projects AS REQUESTED 3
FILING & DOCUMENTATION 4
OTHER (specify) 5
SUBJECT: DOCUMENT TRANSMITTAL ACTION CODE
TO: GOPA Consulting Group APPROVED A
ATTACHMENTS: Safety Induction Training APPROVED AS NOTED B
LOCATION: ICAD-3 (Kizad industrial area) REVISE AND RESUBMIT C
DISCIPLINE: Civil & Electrical Works NOT APPROVED D
PACKAGE: D-111214 FOR INFORMATION E
WE ARE SENDING HEREWITH / UNDER SEPARATE COVER THE DRAWINGS/DOCUMENTS/ SAMPLES LISTED BELOW

(DELETE AS NECESSARY)

DRWS., SPEC. OR ITEM SEQ ACTION


QTY DESCRIPTION TYPE
BOQ. REF NUMBER CODE

D-111214: DTS-
1 004-Rev.01 Safety Induction Training Document 1

This Submittal does/ does not deviate from Contract Documents (Circle one)

Contractor Signature: Date: 17 October 2023 Contractor Stamp


CONSULTANT REVIEW/ COMMENTS :

Corrections or comments relative to submittals during this review do not relieve the contractor from compliance with the requirements of the Contract Documents. This check is
only for review of general conformance with the design concept of the project and general compliance with information given in the contract documents .The contractor is
responsible for confirming and correlating all quantities and dimensions selecting fabrication processes and techniques of construction, coordination his work with that other
trades, and performing his work in safe and satisfactory manner .
Consultant Date Client Date

ROUTING DATE INITIAL NAME


Received by
Forwarded to ADDC
Received from ADDC
Forwarded to
D111214: Construction of 33KV Switching
Station, 33KV Panel Modifications and
Diversions of Existing Cables to Provide
Power Supply to New Development in
ICAD 3

Safety Induction Training

Document Number D-111214: DTS-004


Revision 01
Date 17-10-2023
CONTRACT NO. D-111214
Construction, of 33 kV Switching Station, 33 kV Panel
Modifications and Diversion of Existing cables to Provide
Power Supply to New Developments in ICAD-3

DOCUMENT SUBMITTAL COMMENT SHEET NO. DTS-004 Rev 0

To : Prime Engineering Projects


P.O.BOX: 23059
0097137211889, FAX: 0097137211889
Abu Dhabi - U.A.E
Attn: Project Manager
Copy: ADDC, Projects and Connections Directorate

Document Transmittal Ref. : DTS-004 Rev0 Comment Sheet Ref. : CS- DTS-04 Rev 0
Submission Date : 29-08-2023 Date : 15-Sep-2023
Receipt Date : 29-08-2023

Comments
Item DOC / DRWG Title CSD No. Rev. Status Ret.
attached

1 Safety Induction Training DTS-PEP-004 0 NA - See Below

STATUS: AP = Approved, AEN = Approved except as noted, NA = Not approved, NR = Approval not required
RET = Drawing returned with this DTSCOM sheet (Yes/No)

Comments:

S. No Comments
Revision history with the details of revision number, date, description, Main
1. contractor Prepared by/Reviewed by and Approved by Person details has to
update
2. Add the page numbers on the footer of all presentation slides. Need to revise

3. HSE Induction content list, introduction with scope of works has to update
Provision abut Project highlights such as Project title, client, contractor,
4. project starting date, completion date, project duration and end user details
has to include.
Project organization chart with Name, designation and contact number has to
5.
update.
6. Include List of legal laws, site orientation and HSE Topics

7. Include company policies, TAQA and ADDC HSE related policies, standards,
system safety rules, Essential rules, Golden rules and relevant procedures

Signed Signed

............................................. ….............................................
For GOPA- Intec For ADDC
Cc: ADDC, Projects and Connections Directorate

Note: The above comments and/or approval do not relieve the Contractor from the obligation in the Contract to ensure conformance to the
Specifications. Any Specification deviations found subsequent to approval are to be corrected by the Contractor to the satisfaction of the
ADDC/Engineer
DTS-004 Rev 0 Page 1 of 2
CONTRACT NO. D-111214
Construction, of 33 kV Switching Station, 33 kV Panel
Modifications and Diversion of Existing cables to Provide
Power Supply to New Developments in ICAD-3

Personal Protective equipment as per company requirements, TAQA and ADDC


8.
Requirements has to update.
Emergency procedures follow-up, Emergency contact numbers, First aider and
9.
fire fighter list and various emergency scenarios has to include.
Emergency response team has to update with the details of Main site
controller, Incident controller, Emergency response coordinator, firefighting
10. team in-charge, evacuation team in-charge, head counting team in-charge,
first aid team in-charge, Rescue team in-charge, Traffic control team in-
charge.
11. Highlight about Method of statement and Risk assessment follow-up

12. Provision about types of internal and external permit has to include

13. First aid and firefighting arrangements facilities has to update

14. Highlights Welfare facilities arrangements.

15. Add the company ISO Certificate and ADPHC Approval certificate.
Detailed Emergency evacuation plan with details of first aid room, fire
16. extinguisher availability, Assembly point location, Emergency Access/Exit etc.,
has to update
Add slide about Plant, Machinery and Equipment activities hazard and control
17.
measures
Prohibited/Restricted activity list, security provisions information, safety
18. signs/warning line/Barrier info, color code for lifting gears/power tools/waste
management skip follow-up info has to update in presentation slide
19. Site rules, Visitors rules and rules on activities has to include

20. Add awareness of main hazards as per scope of works.

21. Include Heat stress hazard, control measures and prevention plan
Include the provision about waste management plan and Environmental
22.
control practices

Signed Signed

............................................. ….............................................
For GOPA- Intec For ADDC
Cc: ADDC, Projects and Connections Directorate

Note: The above comments and/or approval do not relieve the Contractor from the obligation in the Contract to ensure conformance to the
Specifications. Any Specification deviations found subsequent to approval are to be corrected by the Contractor to the satisfaction of the
ADDC/Engineer
DTS-004 Rev 0 Page 2 of 2
Contract No.: D-111214
Project Name: Construction of 33KV Switching Station, 33KV Panel Modifications and Diversions of
Existing Cables to Provide Power Supply to New Development in ICAD 3
Client: Abu Dhabi Distribution Company
Consultant: Gopa Intec
Main-Contractor: Prime Engineering Projects

Comment Reply Sheet for Safety Induction

Sl. No. CONSULTANT COMMENTS PRIME REPLY

Revision history with the details of revision number, date,


1 Complied (Please see above
description, Main contractor Prepared by/Reviewed by
heading)
and Approved by Person details has to update

2 Add the page numbers on the footer of all presentation Complied (Please see above
slides. Need to revise heading)

3 HSE Induction content list, introduction with scope of


Complied (Page 7)
works has to update

Provision abut Project highlights such as Project title,


4
client, contractor, project starting date, completion date, Complied (Page 7)
project duration and end user details has to include.

5 Project organization chart with Name, designation and


Complied (Page 8)
contact number has to update.

6
Include List of legal laws, site orientation and HSE Topics Complied (Page 13)

Include company policies, TAQA and ADDC HSE related


7
policies, standards, system safety rules, Essential rules, Complied (Page 9 - 12)
Golden rules and relevant procedures

Personal Protective equipment as per company


8 requirements, TAQA and ADDC Requirements has to Complied (Page 35)
update..

Emergency procedures follow-up, Emergency contact


9 numbers, First aider and fire fighter list and various Complied (Page 41-42)
emergency scenarios has to include.

Page 1 of 1
Contract No.: D-111214
Project Name: Construction of 33KV Switching Station, 33KV Panel Modifications and Diversions of
Existing Cables to Provide Power Supply to New Development in ICAD 3
Client: Abu Dhabi Distribution Company
Consultant: Gopa Intec
Main-Contractor: Prime Engineering Projects

Comment Reply Sheet for Safety Induction


Sl. No. CONSULTANT COMMENTS PRIME REPLY
Emergency response team has to update with the details
of Main site controller, Incident controller, Emergency
response coordinator, firefighting team in-charge,
10 Complied (Page 41-42)
evacuation team in-charge, head counting team in-charge,
first aid team in-charge, Rescue team in-charge, Traffic
control team in-charge.

Highlight about Method of statement and Risk


11 Complied (57)
assessment follow-up

Provision about types of internal and external permit has


12 Complied (Page 53 – 56)
to include

First aid and firefighting arrangements facilities has to


13 Complied (Page 49 – 50)
update

14 Highlights Welfare facilities arrangements. Complied (Page 51 – 52)

Add the company ISO Certificate and ADPHC Approval


15 Complied (Page 58 – 59)
certificate.

Detailed Emergency evacuation plan with details of first


16 aid room, fire extinguisher availability, Assembly point Complied (Page 41-47)
location, Emergency Access/Exit etc., has to update

Page 2 of 1
Contract No.: D-111214
Project Name: Construction of 33KV Switching Station, 33KV Panel Modifications and Diversions of
Existing Cables to Provide Power Supply to New Development in ICAD 3
Client: Abu Dhabi Distribution Company
Consultant: Gopa Intec
Main-Contractor: Prime Engineering Projects

Comment Reply Sheet for Safety Induction


Sl. No. CONSULTANT COMMENTS PRIME REPLY

Add slide about Plant, Machinery and Equipment activities


17. Complied (Page 29 – 32)
hazard and control measures

Prohibited/Restricted activity list, security provisions


information, safety signs/warning line/Barrier info, color
code for lifting gears/power tools/waste management
18. skip follow-up info has to update in presentation slide
Complied (30 – 32)

Site rules, Visitors rules and rules on activities has to


include
19. Complied (Page 14)

Add awareness of main hazards as per scope of works.


20. Complied (Page 14)
.

Include Heat stress hazard, control measures and


21. Complied (Page 38)
prevention plan

Include the provision about waste management plan and


22. Complied (Page 39 - 40)
Environmental control practices

Page 3 of 1
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 1 of 61

Name Designation Signature


Prepared by Edwin Layos HSE Officer
Reviewed by Saudi Marantan QHSE Manager
Approved by Hesham Salama Project Manager
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 2 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 3 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 4 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 5 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 6 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 7 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 8 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 9 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 10 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 11 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 12 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 13 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 14 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 15 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 16 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 17 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 18 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 19 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 20 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 21 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 22 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 23 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 24 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 25 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 26 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 27 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 28 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 29 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 30 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 31 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 32 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 33 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 34 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 35 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 36 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 37 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 38 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 39 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 40 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 41 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 42 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 43 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 44 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 45 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 46 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 47 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 48 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 49 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 50 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 51 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 52 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 53 of 61

INTERNAL PERMITS
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 54 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 55 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 56 of 61

EXTERNAL PERMITS – ADDC

1. PERMIT TO WORK – LOW VOLTAGE

2. SANCTION FOR TEST

3. LIMITED ACCESS PERMIT


Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 57 of 61

METHOD STATEMENT:
A method statement is a document that outlines the steps by steps procedure that will be taken to
complete a particular project, task, or operation. It is typically used in construction and other
industries where there is a need to control risks and ensure safety.
The purpose of a method statement is to provide a detailed plan of how the work will be carried out,
including any risks that may be involved and how they will be controlled. It should also set out what
resources are required and who will be responsible for each stage of the work.
A well-written method statement can help to make sure that work is carried out safely and efficiently,
with minimal disruption and disruption.

RISK ASSESSMENT:
A safety risk assessment is a systematic procedure for identifying and managing hazards. It
encompasses thorough examination of the entire work environment, processes and equipment to
determine any hazard to the health of the employees in the short or long term and implementing
remedies.
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 58 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 59 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 60 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 61 of 61