D-111214: DTS-004-Rev.01
Date: 17 October 2023
CLIENT: Abu Dhabi Distribution Company TRANSMITTED FOR CODE
Construction of 33KV Switching Station, 33KV Panel Modifications
PROJECT: and Diversions of Existing Cables to Provide Power Supply to New APPROVAL 1
Development in ICAD 3
CONTRACT: D-111214 INFORMATION 2
CONTRACTOR: Prime Engineering Projects AS REQUESTED 3
FILING & DOCUMENTATION 4
OTHER (specify) 5
SUBJECT: DOCUMENT TRANSMITTAL ACTION CODE
TO: GOPA Consulting Group APPROVED A
ATTACHMENTS: Safety Induction Training APPROVED AS NOTED B
LOCATION: ICAD-3 (Kizad industrial area) REVISE AND RESUBMIT C
DISCIPLINE: Civil & Electrical Works NOT APPROVED D
PACKAGE: D-111214 FOR INFORMATION E
WE ARE SENDING HEREWITH / UNDER SEPARATE COVER THE DRAWINGS/DOCUMENTS/ SAMPLES LISTED BELOW
(DELETE AS NECESSARY)
D-111214: DTS-
1 004-Rev.01 Safety Induction Training Document 1
This Submittal does/ does not deviate from Contract Documents (Circle one)
Corrections or comments relative to submittals during this review do not relieve the contractor from compliance with the requirements of the Contract Documents. This check is
only for review of general conformance with the design concept of the project and general compliance with information given in the contract documents .The contractor is
responsible for confirming and correlating all quantities and dimensions selecting fabrication processes and techniques of construction, coordination his work with that other
trades, and performing his work in safe and satisfactory manner .
Consultant Date Client Date
Document Transmittal Ref. : DTS-004 Rev0 Comment Sheet Ref. : CS- DTS-04 Rev 0
Submission Date : 29-08-2023 Date : 15-Sep-2023
Receipt Date : 29-08-2023
Comments
Item DOC / DRWG Title CSD No. Rev. Status Ret.
attached
STATUS: AP = Approved, AEN = Approved except as noted, NA = Not approved, NR = Approval not required
RET = Drawing returned with this DTSCOM sheet (Yes/No)
Comments:
S. No Comments
Revision history with the details of revision number, date, description, Main
1. contractor Prepared by/Reviewed by and Approved by Person details has to
update
2. Add the page numbers on the footer of all presentation slides. Need to revise
3. HSE Induction content list, introduction with scope of works has to update
Provision abut Project highlights such as Project title, client, contractor,
4. project starting date, completion date, project duration and end user details
has to include.
Project organization chart with Name, designation and contact number has to
5.
update.
6. Include List of legal laws, site orientation and HSE Topics
7. Include company policies, TAQA and ADDC HSE related policies, standards,
system safety rules, Essential rules, Golden rules and relevant procedures
Signed Signed
............................................. ….............................................
For GOPA- Intec For ADDC
Cc: ADDC, Projects and Connections Directorate
Note: The above comments and/or approval do not relieve the Contractor from the obligation in the Contract to ensure conformance to the
Specifications. Any Specification deviations found subsequent to approval are to be corrected by the Contractor to the satisfaction of the
ADDC/Engineer
DTS-004 Rev 0 Page 1 of 2
CONTRACT NO. D-111214
Construction, of 33 kV Switching Station, 33 kV Panel
Modifications and Diversion of Existing cables to Provide
Power Supply to New Developments in ICAD-3
12. Provision about types of internal and external permit has to include
15. Add the company ISO Certificate and ADPHC Approval certificate.
Detailed Emergency evacuation plan with details of first aid room, fire
16. extinguisher availability, Assembly point location, Emergency Access/Exit etc.,
has to update
Add slide about Plant, Machinery and Equipment activities hazard and control
17.
measures
Prohibited/Restricted activity list, security provisions information, safety
18. signs/warning line/Barrier info, color code for lifting gears/power tools/waste
management skip follow-up info has to update in presentation slide
19. Site rules, Visitors rules and rules on activities has to include
21. Include Heat stress hazard, control measures and prevention plan
Include the provision about waste management plan and Environmental
22.
control practices
Signed Signed
............................................. ….............................................
For GOPA- Intec For ADDC
Cc: ADDC, Projects and Connections Directorate
Note: The above comments and/or approval do not relieve the Contractor from the obligation in the Contract to ensure conformance to the
Specifications. Any Specification deviations found subsequent to approval are to be corrected by the Contractor to the satisfaction of the
ADDC/Engineer
DTS-004 Rev 0 Page 2 of 2
Contract No.: D-111214
Project Name: Construction of 33KV Switching Station, 33KV Panel Modifications and Diversions of
Existing Cables to Provide Power Supply to New Development in ICAD 3
Client: Abu Dhabi Distribution Company
Consultant: Gopa Intec
Main-Contractor: Prime Engineering Projects
2 Add the page numbers on the footer of all presentation Complied (Please see above
slides. Need to revise heading)
6
Include List of legal laws, site orientation and HSE Topics Complied (Page 13)
Page 1 of 1
Contract No.: D-111214
Project Name: Construction of 33KV Switching Station, 33KV Panel Modifications and Diversions of
Existing Cables to Provide Power Supply to New Development in ICAD 3
Client: Abu Dhabi Distribution Company
Consultant: Gopa Intec
Main-Contractor: Prime Engineering Projects
Page 2 of 1
Contract No.: D-111214
Project Name: Construction of 33KV Switching Station, 33KV Panel Modifications and Diversions of
Existing Cables to Provide Power Supply to New Development in ICAD 3
Client: Abu Dhabi Distribution Company
Consultant: Gopa Intec
Main-Contractor: Prime Engineering Projects
Page 3 of 1
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 1 of 61
INTERNAL PERMITS
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 54 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 55 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 56 of 61
METHOD STATEMENT:
A method statement is a document that outlines the steps by steps procedure that will be taken to
complete a particular project, task, or operation. It is typically used in construction and other
industries where there is a need to control risks and ensure safety.
The purpose of a method statement is to provide a detailed plan of how the work will be carried out,
including any risks that may be involved and how they will be controlled. It should also set out what
resources are required and who will be responsible for each stage of the work.
A well-written method statement can help to make sure that work is carried out safely and efficiently,
with minimal disruption and disruption.
RISK ASSESSMENT:
A safety risk assessment is a systematic procedure for identifying and managing hazards. It
encompasses thorough examination of the entire work environment, processes and equipment to
determine any hazard to the health of the employees in the short or long term and implementing
remedies.
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 58 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 59 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 60 of 61
Doc No. IMSP14-F16
Prime Engineering Projects Rev 01
Date 15-10-2023
SAFETY INDUCTION Page 61 of 61