Professional Documents
Culture Documents
Project Title: Additional Three (3) Transformers 132/33kV,100MVA and Related Substation Works at
Shamkha 400/132/33kV Grid Station
DOCUMENT TRANSMITTAL SHEET
TO: TRACTEBEL ENGINEERING CONSULTANCY LLC
Al Danah 1099 - 1000 Zayed the first Street (Electra St.)
PO BOX - 4657, Abu Dhabi - UNITED ARAB EMIRATES
DOCUMENT DISTRIBUTION
Copy - TE Head Office
Soft Copy TE Abu Dhabi Office
Soft Copy TRANSCO/Projects Division Manager
TRANSCO/Manager Power Projects Department
- ADDC
Status: A=Approved, AEN = Approved Except as Noted, NA = Not Approved, NR = Approval Not Required,
RET =Drawing Returned with this Comment Sheet (Yes/No)
COMMENTS:
Reviewer Engineer
Note: The above comments and/or approval does not relieve the Contractor from his obligation in the Contract to ensure conformance to the Specification. Any Specification deviations
found subsequent to approval are to be corrected by the Contractor to the satisfaction of the Owner/Engineer.
DTS COMMENT SHEET
Consultancy N-17733
Contract N-17734: M/s. National Contracting Co. LLC
Contract Title Additional Three (3) 132/33kV Transformers, 100MVA and Related Substation
Works at Shamkha 400/132/33kV Grid Station
Subject DTS No : 0333 Dated 15-03-2023 Received on 15-03-2023
Comments
1. Reference to your reply to the previous comment no. 10, the proposed recommendation under
Clause No. 8.1.2 shall be clarified under a separate DTS.
2. As commented earlier, “The degree of compaction shall not be less than 97% as per contract
specification. Please revise accordingly”. Clause No. 10.4.1 shall be revised accordingly.
3. The previous comment no. 18 is still not justified properly with respect to the subgrade reaction
value in the As-Built Soil Report.
( TRANSCO ) ( ENGINEER )
Date:
Note: For additional comments from TRANSCO / ADDC / EWEC, refer to the next page.
Date: