132kV OHL Fujairah –Dibba - Fujairah –Tawyeen Lot 1, 2 & 3 Facsimile +971-2-4457490
CONTRACT NO. N 6734 Telephone +971-2-4457470
DRAWING / DOCUMENT COMMENT SHEET
To : Instalaciones Inabenza S.A ,Abudhabi . Fax No. 02-5550816
Attn : Mr.Jos’e Leal del Ojo Chamorro.
Copy : TRANSCO- Projects Division Manager By hand
TRANSCO- Power Projects Department Manager
Attn. Mr. V.Narayanan,Project Manager By Hand
Head of Operation and maintenance, Al Ain Fax No.03 7613226
MML Site Office, Fax No 09-2380184
Doc. Transmittal Ref. : DTS-348 Comment Sheet Ref. : CS-348
Submission Date : 29/12/2010 Date : 05/01/2011
Receipt Date : 29/12/2010 MML Previous CS No. : CS-331 dt 22.12.10
CS-348 Proposed Leg Extension & Benching for Lot 3- : APD10C/0, APD11/0, APD11A/0, APD11A/1 Page 1of 2
N-6734
625206101.doc 05th Jan 2010 Page 2 of 2
The angle of deviation of APD10 C/0 = 11° 03’20” RT, Since the terrain near down most leg ,Leg B (in tension) is not
much critical we are recommending to reduce the CP lowering by 4.0 m in place of 5.0 m proposed ,k eeping the
down leg B at 10.0m level below the CP ,there by the benching volume proposed can be reduced. Please revise .
The Total benching volume shall be verified after site measurement after completion of benching work
2. Loc # APD 11/0 : CSD No. : EF-7600 N 0539 Rev .A (sheet 1 of 2 & sheet 2 of 2) :
3. Loc # APD 11A/0 : CSD No. : EF-7600 N 0540 Rev .0 (sheet 1 of 2 & sheet 2 of 2) :
The angle of deviation of APD11A/0 = 09° 17’43” LT, Since the terrain near down most legs ,Leg C & D (in tension)
are not much critical we are recommending to reduce the CP lowering by 2.0 m in place of 3.0 m proposed ,k eeping
the down legs A,C &D at 8.0m level below the CP ,there by the benching volume proposed can be reduced.
Please revise.
The Total benching volume shall be verified after site measurement after completion of benching work
4. Loc # APD 11A/1 : CSD No. : EF-7600 N 0541 Rev .0 (sheet 1 of 2 & sheet 2 of 2) :
Please confirm the -3.50 m CP lowering considered in longitudinal profile are excluding the height adjustment ( 0.5
m is presently changed to 0.75 m). If this 3.5 m is including this 0.5 m , pls reduce the CP lowering by 3.0 m in place
of 3.5 m proposed . Please revise the benching calculation.
____________________________________________________________
MML Check/Review
Engineer
Signed………………………… Signed…………………………
AKP/RK/MA
CS-348 Proposed Leg Extension & Benching for Lot 3- : APD10C/0, APD11/0, APD11A/0, APD11A/1 Page 2of 2
N-6734
625206101.doc 05th Jan 2010 Page 3 of 2
Note: The above comments and/or approval are made after checking in accordance with the Contract and technical Specification. These do not
relieve the Contractor from his obligation in the Contract to ensure conformance to the Specification. Any Specification deviations found subsequent
to approval are to be corrected by the Contractor to the satisfaction of TRANSCO/Engineer.
CS-348 Proposed Leg Extension & Benching for Lot 3- : APD10C/0, APD11/0, APD11A/0, APD11A/1 Page 3of 2