FUNCTIONAL SPECIFICATION

CIVIL
SITE GRADING AND EARTH WORKS

Document No. : E-031161

Project Name : BTIP- Onshore Facilities / Offshore Pipelines

Contract No. : E-09335

Client : Shell Petroleum Development Company of Nigeria Limited

EPIC CONTRACTOR

Rev Date Description Prepared by Reviewed by Approved by

0 19 July 1999 Original Issue D. Shadrake D. Shadrake K. McAdam


Issued for CDV
1 30 June 2002 C. K. Han C. Y. Chung K. B. Choi
and Ownership
Comments
2 31 August 2002 C. K. Han C. Y. Chung K. B. Choi
Incorporated

1, Cheonha-Dong, Dong-Ku, Ulsan, Korea, 682-792, http//:www.hhi.co.kr


Tel: 82-52-230-5461/2, Fax: 82-52-230-3549, E-mail: j740hhi@hhi.co.kr
CONTRACT E-09335
DOC. NO : E-031161
BTIP – ONSHORE FACILITIES / OFFSHORE PIPELINES
REV. NO : 2
SITE GRADING AND EARTH WORKS PAGE : 2 OF 5

REVISION HISTORY

EPIC CONTRACTOR SPDC

Prepared Reviewed Approved Validity Reviewed Approved


Rev Date Date
by by by Period by by
D. D.
0 19/07/99 K. McAdam
Shadrake Shadrake
C. Y.
1 30/06/02 C. K. Han K. B. Choi 5 years
Chung
C. Y.
2 31/08/02 C. K. Han K. B. Choi 5 years
Chung
CONTRACT E-09335
DOC. NO : E-031161
BTIP – ONSHORE FACILITIES / OFFSHORE PIPELINES
REV. NO : 2
SITE GRADING AND EARTH WORKS PAGE : 3 OF 5

TABLE OF CONTENTS

1.0 INTRODUCTION.................................................................................................................................... 4

2.0 SCOPE OF WORK................................................................................................................................. 4

3.0 GENERAL REQUIREMENTS................................................................................................................ 4

4.0 TECHNICAL SPECIFICATION.............................................................................................................. 4

5.0 REFERENCES....................................................................................................................................... 4
CONTRACT E-09335
DOC. NO : E-031161
BTIP – ONSHORE FACILITIES / OFFSHORE PIPELINES
REV. NO : 2
SITE GRADING AND EARTH WORKS PAGE : 4 OF 5

1.0 INTRODUCTION

Bonny terminal requires an upgrade of facilities, processes and systems. Located in the North
East corner of the site will be the requirement for site grading and earth works.

2.0 SCOPE OF WORK

The Scope of Work of this Specification covers the site grading, and the design and installation
of an engineered earth fill in the proposed process area.

3.0 GENERAL REQUIREMENTS

Site ggrading shall include the removal of all vegetation, organic material, and large areas of
clay lenses in tthe process area, excepting the removal of all topsoil in the existing tank farm
down to the sand llayer which shall be carried out by the others. All spoil shall be hauled to a
designated area, specified by SPCD.

An engineered fill shall be installed in the process area, approximately 5.0 m above mean sea
level (MSL) reference elevation. The area to be filled shall extend approximately between
N.0+420 and N.0+850 and E.1+250 and E.1+900.. The new roads, road bridges, process
structures, and buildings will be constructed on this fill, which will be approximately 2.13 m thick,
as indicted on drawing E- 031031/sheets 1&2.

The total volume of fill will be approximately 607 750 cubic metres.

The Contractor shall specify a basic unit rate for supplied and installation of engineered fill, with
rates for additional and reduced fill, based on the above estimated volume.

Earth works shall be designed to DEP 34.11.OO.11-GEN, Site Preparation and Earth Works,
and installed under SPCD Standard Construction Specifications, S-3 Clearing, Grading and
Surface Stripping.

4.0 TECHNICAL SPECIFICATION

Unless noted otherwise, site grading and earthworks shall be designed and constructed in
accordance with this Specification and the attached drawings, codes and standards listed under
Section 5 of this specification, including environmental data for the Bonny Terminal.

5.0 REFERENCES

In case of conflict between this Specification, its associated drawings and the applicable codes
and standards, the order of precedence shall be as follows:
1) Nigerian National Standards
2) This Specification
3) Associated Drawings
4) SPDC Specifications
5) Shell DEP’s
6) International Standards
The Specifications Listed below shall be applicable to all site grading and earth works.

SPDC Standard Construction Specifications


CONTRACT E-09335
DOC. NO : E-031161
BTIP – ONSHORE FACILITIES / OFFSHORE PIPELINES
REV. NO : 2
SITE GRADING AND EARTH WORKS PAGE : 5 OF 5

S-3 Clearing, Grading and surface Stripping


S-4 Earthwork at Construction Sites

Shell DEP Manuals

DEP 34.11.00.10-Gen Site Investigations


DEP 34.11.00.11-Gen Site Preparations and Earthworks
DEP 34.11.00.12-Gen Geotechnical and Foundation Engineering
DEP 34.13.20.31-Gen Roads, Paving, Surfacing, Slope Protection and Fencing
DEP 34.14.20.31-Gen Drainage and Primary Treatment Facilities

British Standard Institution

BS 1200 Building sands from natural sources


BS 1377 Methods of Tests for Soil for Civil Engineering Purposes

Environmental Data

Ambient temperatures
 Mean minimum temperature 23°C
 Minimum temperature 18°C
 Mean maximum temperature 31°C
 Maximum temperature 40°C
 Design temperature, maximum 35°C
 Design temperature, minimum 18°C

Rainfall
Heavy rainfall can be expected in the wet season during the months of April through October.
 Average annual rainfall 3800 mm
 Mean maximum hourly rainfall 100 mm

Wind speed
 Basic wind speed 35.6 m/s

Entomology and vermin


As prevalent in the Niger Delta with thick forest and swamp habitat.

Fungi and mobid growths


As prevalent in the Niger Delta with thick forest and swamp habitat.

Lightning
Frequent in rainy season, up to 140 strikes per year.

Altitude
1.2 meters

Earthquake
None

Drawings
Drawing No. E-031031/Sheets 1&2 Site Grading and Earthworks