SERVICE REPORT

Nr ZLYSRE2300093
Date: 15/12/2023

Page 1 sur 2

Client / Klant : Rolls Royce Solutions Asia Pte Ltd Tasks


Site address C SERVICING FOR KS5-560 BI-ACCUMULATEUR 50HZ

Hamlet 2, Long Son Commune C SERVICING FOR KS5-560 BI-ACCUMULATEUR


78222 Vung Tau City, Ba Ria Province 50HZ
Tel.:
Park ref.: K19008-AA-MAPA LSP PACKAGE G VIETNAM AA-MAPA DPC - LSP
Dossier ref.: SGS 2301700 C Maintenance
JN 11MK00055

Technician LYNN
Report sent date 15/12/2023
Worked hours total
Mileage

Achieved work
LSP, Vietnam
K19008
DRUPSs C maintenance (#11MK00055)

11/12/2023
Attended SIC for LSP site entry.
When reach on site, Check HMI screen can't operation well on 6902, 6919, 6920 and MAP 1.
Reset HMI and check wire connection is secure.
Tested on function well currently and reoccurrence happened, recommend to replace Cfast card in HMI.
Take vibration and temperature readings then stop the units 6901 and 6920.
12/12/2023
Demonstrate and start to do C maintenance on DRUPS with DP-consulting.
Perform DRUPS C maintenance as per submitted MOS.
Perform 3000rpm drum bearings greasing.
Check clutch air gap open and close.
Check engine starter batteries impedance and voltage.
Complete C maintenance on 6901 and 6920.
House keeping working area.
Switch to bypass stop on 6902.
Continue work on next day.
13/12/2023
Meeting with LSP for C maintenance and DCM firmware upgrade.
Perform C maintenance on 6902 with DPC.
DCM firmware update to 6902, 6903, and 6905.
Replace air inlet fan M5 due to fan driver fault.
Replace 2x engine starter batteries.
Download KS and DCM data to files.
Housekeeping working area.
Restart to 6902 and back to secure load.
Bypass Stop on DRUPS 6903 and 6919.
Continues to do maintenance on next day.
14/12/2023
Perform C maintenance on 6903 and 6919 with DPC.
Replace 4x engine starter batteries.
Perform to manual Alternator bearings greasing.
Complete C maintenance and Housekeeping.
15/12/2023
Do engine test.
Restart DRUPS 6903 and 6919.
Perform to manual Alternator bearings greasing.
Check operation status and no alarms on DRUPSs.
DP-Consulting will continues to doing C maintenance on the rest of DRUPSs.
Page 2 sur 2

ZLYSRE2300093

QSV091 NO-BREAK KS7&KS7-SB SYSTEMS

Customer remarks

Nil

Customer signature Customer name


The machine is left in operational mode.
DPC Hoang Xuan Van
In signing this service report I confirm that works
have been completed as per submitted RAMS. Any
further actions have been communicated by KINOLT
Service Engineers.

Work start Start time Work end End time Pause Additional Op. Work code Worked
date date hours

You might also like