DRAWING / DOCUMENT COMMENT SHEET
To : Instalaciones Inabenza S.A ,Abudhabi . Fax No. 02-5550816
Attn : Mr.Jos’e Leal del Ojo Chamorro.
Copy : TRANSCO- Projects Division Manager By hand
TRANSCO- Power Projects Department Manager
Attn. Mr. V.Narayanan,Project Manager By Hand
Head of Operation and maintenance, Al Ain Fax No.03 7613226
MML Site Office, Fax No 09-2380184
Doc. Transmittal Ref. : DTS-350 Comment Sheet Ref. : CS-350
Submission Date : 02/01/2011 Date : 05/01/2011
Receipt Date : 02/01/2011 MML Previous CS No. :

Item CSD No. Comment


Title / Details Rev. Status Ret.
No. N – 6734 attached
Proposed Leg Extension & Benching for
1 EF 7600 N 0555 0 AEN No As below
Lot 3- : Location no. AP D8/0
Proposed Leg Extension & Benching for
2 EF 7600 N 0556 0 AEN No As below
Lot 3- : Location no. D8A/2
Status: As per TRANSCO Contract Document
A = Approved, AEN = Approved Except as Noted, NA = Not Approved, NR = Approval Not Required
Ret = Drawing returned with this comment sheet (Yes/No)
COMMENTS ON THIS SUBMISSION
General Comments
1. The contractor is requested to transfer the datum level to some place and keep it undisturbed until the final
measurement.
2. The final benching volume shall be considered for accounting purposes based on the most economical foundation design
for an individual tower location based on the design parameters recommended by the soil investigation agency for that
particular location.
3. It is advised to verify the CP lowering proposed in the diagonal profile and benching calculation with the values used in
the longitudinal profile of the respective towers and if any extra lowering than the approved longitudinal profile is
required, pls check the ground clearance and weight span criteria’s due to this effect. Also pls note the CP lowering used
in the profile comprising of the tower height adjustment from GL to reference point (PL). Pls rectify the mistakes if any.
Comments in this submittal
1. Loc # APD 8/0 : CSD No. : EF-7600 N 0555 Rev .0 (sheet 1 of 2 & sheet 2 of 2) :
 The individual LE selection are found to be correct.
 The concept adopted for benching volume calculation between Legs A-C-D are incorrect.
 The setting level shall be -1.0 m and benching volume between leg A-C-D shall be corrected as 390.16 m³
instead of 1104.54 m³ and the total benching volume for location APD8/0 shall be corrected as 442.21 m³
instead of 1156.60 m³. Pls correct .
 The Total benching volume shall be verified after site measurement after completion of benching work.
2. Loc # D 8A/2 : CSD No. : EF-7600 N 0556 Rev .0 (sheet 1 of 2 & sheet 2 of 2) :
 The individual LE selection are found to be correct.
 The Total benching volume shall be verified after site measurement after completion of benching work
_____________________________________________________________________
MML Check/Review
Engineer
Signed………………………… Signed…………………………
RK/MA for Mott MacDonald Ltd. for TRANSCO

CS-350 Proposed Leg Extension & Benching for Lot 3- : APD8/0, D8A/2 Page 1of 1
N-6734
625206166.doc 05th Jan 2011 Page 2 of 2
Note: The above comments and/or approval are made after checking in accordance with the Contract and technical Specification. These do not
relieve the Contractor from his obligation in the Contract to ensure conformance to the Specification. Any Specification deviations found subsequent
to approval are to be corrected by the Contractor to the satisfaction of TRANSCO/Engineer.

CS-349 Proposed Leg Extension & Benching for Lot 3- : APD10/0, APD10/1, APD10A/0, APD10B/0 Page 2of 2