Maharashtra State Electrlcity

MAHADISCOM Office of the


Distribution Company Ltd.
Superlntending Englneer
CIN No U4010MH2005SGC153645 0&M Circle office, Buldhana
Tel.:(P) 242190 (0) 243492
To 03 92 9 4 DEC 2018
Executive Engineer,
MSEDCL,0&M Division,
Khamgaon
Subject- Technical Sanction of Estimate for shiftling of HT/LT Iine & DTC
under DDF 1.3% Sup. Scheme.
Ref 1. EE/Khm/Est/3270 Dated
08.08.2018 & emall, Dt 7.12.2018 &
2. Office Note
10.12.18
3. Circular No 23 Dated 04.08.2006
4.
(Delegation of Power)
CE/Dist./p-1/ 16037 Dated 08.06.2012 (Revlse Delegatlon of Power)
5.
CE(Dist.)/D-V/Centages/DDF Works/24007 Dated 29.07.2016.
6. CE/DIst./D-11/ 23799 Dated
28.09.2017.
7.
CE/Intra/Cost-Data/Rev/2018-19/I 72/ 17375 Dt 19.07.2018
As per the estimate submitted by vour office vide letter u/r No.1
Sr No Title SDn Ttem
Qty DPR Cost
Estimate for Providing 11kV Link line from
11kV Sadaphate DTC to 1lkV Wanere DTC to 11 KV HT 0OH
1.38
dismantle the dam cross 11kV line out of the Line
Submergence area of Arkacheri Dam as per
Tq
request of M/s Executive Engineer, Vidharbha |Sangrampur
896869
Hydro Electric &Lift lrrigation Division, Akola 11KV OH4
at Arkacheri Minor Irrigation Project, Sonala
Single Pole 6
under Sonala D/C in Sangrampur Subdivision.
Cutp oint

As per power delegated vide GO-l Section-i {Works) Clause E-(U} (Circular No 23 Dated 04.08.2006), above
estimate is technically sanctioned vide Sanction No. SE/BLD/T/Shifting/2018-19/ DDF-NR (1.3% sup)/|5
Dated. 14 12.2013
Estimate sanction is subject to following Terms & condition:

1. The applicant has topay as per DPR cost and any additional higher quote by MSEDCL contractor
cost if it
against material
requests MSEDCL to execute the work. Else only supervision charges is applicable.
2.The work will commence only after payment of above
Charges plus tax as applicable and other formalities (Payment
of SC/SD,
Pending Energy Bill f any,
Execution of Agreement, GTP approval etc.). The differential amount if any due
3. The Estimate is prepared & sanctioned as per cost data 2018-19 under DDF-NR (1.3% Sup) scheme.
4. The validity of this technical sanction is 6 months or till changes in cost data whichever occurs
5. The work shall be carried out earlier.
through licensed Electrical Contractor.
6. The
necessary way leaves /permission for shifting of lines to be obtained by the concerned consumer/applicant.
7. The work should be carried out during the load shedding
carried out staggering day. If there is shutdown
perlod. If, at all, outage is required, the same shall be
more than Load shedding hours, the
shall be recoverable on revenue loss (Energy Charges)
actual basis of Interruptlon period (33 & 11Kv
feeders).
8. The concerned Executive Engineer will act as the Nodal offlcer. He will ensure the source of material
9.On
completlon
of above, WCR to be finalized & necessary entrles of work shall be taken in utilsed, quality
Asset register.

Copy to: Superinding Engineer


Dy.Executlve Engineer, MSEDCL, 0&M Sub-Dlvision,
E
0&M Circle, Buldhana
Manager (F&A), MSEDCL, O&M Circle
Office, Buldhana
MAHARASHTRA STAE ELECTRICIY DISTRIBUTION CO,LTD_
C.C.O& M Division, Khamgaon
ESTIMATE REPORT

Estimate for Providing 11kV Link line from 1kV Sadaphate DTC to 11kV Wanere DTC to
dismantle the dam cross 11kV line out of the Submergence area of Arkacheri Dam as per
Division, Akola at
request of M/s Executive Engineer, Vidharbha Hydro Electic&Lift Iigation Subdivision.
Arkacheri Minor Irigatlon Project, Sonala under Sonala D/C in Sangrampur

At-Sonala Tq-Sangrampur Dist:-Buldhana

Estimate provides Shifting of HT Line, LT Line & DTC


mate
Rs. 896869
Eslimate
Superintending Engineer, Buldhana

Overhead

Parometer
Km 11 KV HT OH Line
1.38
No. 11KV OH Single Pole Cutpoint
6.00

R.S.J. 100x 116mm 11/10/9/8Mi long


poTs
R.S.J. 152 x 152 mm 13/11Mt longg
P.S.C. pole 9/8 Mt long

ronsformer Capacity NA

AAC Ant & Gnat


noucior
AAAC 100 sq.mm/ AAAC 55 sq.mm

50 Mtr LT.
60 Mtr H.T.

of tronsformer NA

enue Retun NA

Meod DDF-1.37% Sup.

Applicant is ready to execute work with his own material through LEC. work is allowed to be
xecuted by party through LEC. Hence supevision charges /agreement charges as
pplicobleshil be recovered. Further drawings of standard method of construction and our
specificofions of material shall be given to the consumer with estimate and our all terms of
Execulion of work shall be informed to consumer and ensure work as per MSEDCL standard
method of construction and work must be
supervised by our staff.

ulive Engineer
Circle.Buldhan0 Executiy6 Eaileer(ADM) Manager{f&A
0&Circle, Buldhana Q&M Clrcle, Buldhan
cOMPANY LTD.
DISTRIBUTION
ELECTRICITY
MAHARASHTRA STATE
Buldhana
C.C. O&M Clrcle
11kV line out
of the
ABSTRACT SHEET the dam cross
Division, Akola at|
DTC todismantle Irigation
DTC to 11kV Wanere Electric & Lift
from 11kV Sadaphate Vidharbha Hydro
11kv LInk line of M/s Executive
Engineer,
torProviding per request
Dam as under Sonala D/C In Sangrampur
Subdlvlsion.
Dist:-Buldhana
ence area of Arkacher Sonala
Igotion Project,
Tq S a n g r a m p u r
Minor
Amount
At:Sonala Rate
QUanlly
Unlt 402692.56
Partlculars As Per Sheet
1.38
Km
162022.17
KVHT OH Line As Per Sheet
No.
6.00
0.00
OH Single Pole Cutpoint As Per Sheet
1IKV km
0.00
As Per Sheet
0.00
LT OH Line
0.00
km
Coble 564714.73
HT Aerial Bunch
22588.59
Cost of material
4.0%
materiol cost A
Transporation on 5647.15
1.0%
T& P on material cost A
2823.57
0.5%
material cost A
3Contigenciesn 84707.21
15.0%

Erecion cost on maierial cost A


28235.74
5.0%
material A
Contriaciors Sup Charges
on

2.57% 14117.87

Cost Material A
insurance, labour & finance
on

722834.86
I
Gross Maierial cost (SUB TOTAL
4.0% 28913.39

Controcior's profit on SUB TOTAL -I


751748.25
Tender cost (SUB TOTAl - )
C
18.0% 135314.68
GST 18% on SUB TOTAL | I

D Sub Total II 887062.93

H.O. Supervision charges1.3 %on ( mateñol cost (A ]+ erection 1.3% 8442.49


COsi14))
Sub Total V 58.58% 895505.42

19 Dismontfing Chorges As Per Sneet 1364.00

FGrandTotal 896869

Dy.Exautive Engineer
0&M Circle. Buldhana Execulive npheer(ADM
OBM Clrcle. Buldhana MandgetF&A
Q&M Circle. Buldhono

(
Superinteneing Engineer
O8M Circle, Bulchana
E n scibmep

kothe p ine to (0e


SMala Sonolh
dismanyled
To
fiogi
BhaEH Bua
Sonala 0 06

wadrde 9
Smle Sonala

Sahhw un 33 kn
Sadaphal. r S a

d+m mtHed
Depuly EnginggrTT
Vidarbha Hydro Electric
Project Dam wall
KOr'ENJV Sub-Division, No.-1KHAMGAON
Junior geor Exevngineer
N.SE.DC.Ltd A1.G.E.D.C.L. Rhamgaon