To,
M/S MAK Pumd Company (Pvt) Ltd:
Plot # 87 industries Estate Jamrud Road Peshawar.
Subject:- Work Order for the “ ADP NO. 2276/190396 IMPROVEMENT & CONSTRUCTION OF
CHANNELS, FLOOD PROTECTION WORKS, DRAINS, ROADS,
BRIDGES/CAUSEWAY & INSTALLATION OF SOLAR IRRIGATION TUBE
WELLS IN TEHSILS TOPI, SWABI & LAHORE OF DISRICT SWABI”
Sub Work: Installation of solar based Tube wells and installation of solar energy conversion system and
pumping machinery for new exeiting Irrigation Tube Well in Pk-43 & PK-44 District Swabi
(Solar System) (12 Nos) Conversion
E/Cost: 16.60 (M) B/Cost: 15.43 (M) Compt; Period; June 20___
The rate of Rs. -10% below on the estimated cost of Rs. 16.60 million which come to Rs.
15.4366 million, item wise detail and BOQ which is indicated as under for the subject mentioned work,
have been approved by the competent authority of above letter reference Number.
/conversion/tmp/activity_task_scratch/710152892.doc
Supply and Fixing MS Column pipe with 335.61 Meter 2341.80 785954.916
flanges for sub,erssible pump : 3" ( 75 mm)
6 Nominal Pipe Size (NPS), 3/16" thick, 10'
length
Supply and installation of Submersible Flat 335.4 Rft 635.75 213230.55
Cable made of 99.9% copper, coated with
7 double PVC as per BSS Standards, 3x10
mm2
Supply and Erection 1x6 sq.mm single core 335.4 Rft 228.30 76571.82
8 (XPLE/XPLO insulated/PCV sheathed)
flexible copper cable
Supply and Erection 1x10 sq.mm flexible 339.6 Rft 349.84 118805.664
9 copper cable
Supplying and Fixing MS Suspension 12 Each 574.38 6892.56
10 Clamp 3/8" thick for housing pipe : 4" i/d
Supplying and Fixing MS cap of 3/8" thick 24 Watt 1450.76 34818.24
11 sheet : 8" i/d
Supply and fixing of AC & DC connection 12.00 No 1400.00 16800.00
17 boxes fuse, earthen system PVC pipe earth
wire as per site requirements (Market Rate)
Supply and fixing bore cover plate cover (2 24.00 Job 3000.00 72000.00
piece) clamp 3/8" thick arrangement hole
18 per column and cable , hole 1" i/d for
inspection water level in T/well (Market
Rate)
Total 16600343.94
Total in 16.60
million
Note:
1-Any other unforeseen items cropped up during execution will be payable on MRS
2020.
2-The quantities are liable to be increased/decreased during execution of work
1. Any other unforeseen item cropped up during execution will be payable on MRS 2020 of the quoted
premium of contractor.
2. The quantities are liable to be increased or decreased during execution.
/conversion/tmp/activity_task_scratch/710152892.doc
You are further directed to attend the Divisional Office Gohati for execution of contract
agreement well before commencement of the work. Sub Engineer Gohati should be contact with the
contractor to start the above noted work with immediate effect and complete the same within the stipulated
period as per contract agreement.