S No MRS Code Item Description Unit 2020 2021 2022
2020-2021 2020-2022
Steel Items other than Solar Items
Providing, laying, cutting, jointing, testing
and disinfecting GI pipeline in trenches,
with socket joint, using GI pipes of EN
1 24-16-c-08 10255 - 2004 (Approved Light quality ) Meter 1,559.30 2,335.14 2,797.25 49.76% 79.39%
including specials etc.Complete as per
specifications except excavation. 3"
Nominal Pipe Size (NPS)
Supply & fabricate M.S. reinforcement for
2 06-08-c cement concrete (Hot rolled deformed Tonne 141,789.80 200,355.09 235,394.09 41.30% 66.02%
bars Grade 40)
Steel Items releated to Solar Items
Supply and Erection of Stainless Steel Nuts
3 26-01-n-03 Watt 3.86 3.92 3.92 1.55% 1.55%
and Bolts
Supply and Fixing MS Column pipe with
flanges for sub,erssible pump : 3" ( 75
4 24-56-b Meter 2,341.80 2,391.11 2,858.78 2.11% 22.08%
mm) Nominal Pipe Size (NPS), 3/16" thick,
10' length
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
5 26-01-m-01 Watt 21.82 22.19 22.19 1.70% 1.70%
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Supply and Erection of PV MOUNTING
6 26-01-r Kw 29,276.46 29,766.43 32,851.31 1.67% 12.21%
FRAME WITH MANUAL TRAKERING
Supply and Erection of SOLAR AUTO
7 26-01-q No 268,911.00 273,411.00 314,198.59 1.67% 16.84%
TRACKER for 3.6 KW installation
PV Modules and Inverters
Difference (MRS 2020 - 2021 & MRS 2020 - 2022)
Difference Deffernece
S No MRS Code Item Description Unit 2020 2021 2022
2020-2021 2020-2022
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade
8 26-01-d-01 Watt 72.58 73.8 98.1 1.68% 35.16%
(per Watt) (As per Approved
Specifications)
Supply and Erection of 3 Phase 220/380V
9 26-01-i-04 Solar Pump inverter (MPPT) 7.5 KW and Watt 16.95 17.24 20.39 1.71% 20.29%
above
Supply and Erection of dV /dT or Sine
10 26-01-j-01 No 88,627.25 90,110.25 90,110.25 1.67% 1.67%
Filters 11 KW to 18.5 KW
Pumping Machinery
Supply & Installation, testing and
commissioning of Submersible Pump (ISO
– 9906 Certified) Coupled with
Submersible rewind-able Electric Motor
with AC winding and all accessories like
Motor Control Unit (equipped with
11 24-50-a-02 Each 408,853.00 415,818.41 416,067.41 1.70% 1.76%
UV/OV, dry run protection device, surge
protection, phase reverse indicator)
Complete in all accessories including NRV,
Pressure Gauge, Sluice valve except
column pipe and power cable with
appropriate Head and Discharge : 15 HP
Solar Based Pumping Machinery
Difference (MRS 2020 - 2021 & MRS 2020 - 2022)
Difference Deffernece
S No MRS Code Item Description Unit 2020 2021 2022
2020-2021 2020-2022
Supply & Installation, testing and
commissioning of complete Solar PV
Generator including A-Grade Mono
Crystalline PV Modules , Manual Tacker
Mounting Structure and Foundation Civil
work, Junction Boxes, Fuses, DC Breakers,
12 24-97-d Wiring complete upto Solar Pump Inerter, WHP 188,076.80 191,482.80 259,153.91 1.81% 37.79%
sized at a sizing factor of 1.50 capable of
operating its intended solar pump having
discharge greater than 3000 iGPH and
output capacity greater than 6 WHP and
up to 10 WHP (As per Approved Technical
Specifications)
Supply & Installation, testing and
commissioning of Solar Submersible Pump
(ISO - 9906 Certified) coupled with
Submersible rewind-able Electric Motor
with AC winding and all accessories like
Solar Pump Controller, du/dt filter
13 24-93-d Complete in all accessories including WHP 73,356.75 74,842.80 99,736.50 2.03% 35.96%
cooling jackets, NRV, Pressure Gauge,
Sluice valves (02 Nos) except column pipe
and power cable for discharge greater
than 3000 iGPH and output capacity
greater than 6 WHP and up to 10 WHP (As
per Approved Technical Specifications)
Voltage Regulator
Difference (MRS 2020 - 2021 & MRS 2020 - 2022)
Difference Deffernece
S No MRS Code Item Description Unit 2020 2021 2022
2020-2021 2020-2022
Supply and Fixing of Voltage Regulator 30
14 15-217 No 180,720.00 183,744.00 238,419.00 1.67% 31.93%
KVA
Supply and installation of manually
controlled voltage regulator oil cooled
15 24-48-a with 99.9% copper winding, and No 95,845.13 97,448.63 126,235.60 1.67% 31.71%
independed control regulator on each
phase 20-30 KVA
Cable related to Pumping Section
Supply and installation of Submersible Flat
Cable made of 99.9% copper, coated with
16 24-50-c-05 Meter 492.35 473.21 473.21 -3.89% -3.89%
double PVC as per BSS Standards, 3x6
mm2