Slow progress in the Delay in project milestone Risk Assessment before starting the
Project Implementation Failure to deliver the Working near existing Assets /
15 NCC Power N-16503.1 2022-01-17 location may delay in completion which affects 3 4 12 Avoid work 2 3 6 2023-04-12 Site Team Open
phase (Execution) project to the time Live lines
project completion project delivery time Close supervision to be carried out
Delay in completion of
Not able to do the OHL
Project Implementation Failure to deliver the Delay in OHL construction work which
16 NCC Power N-16503.1 2022-01-17 modification works due to non 3 4 12 Transfer Advance shutdown request to LDC 1 2 2 2023-04-12 PM, Pln Eng Open
phase (Execution) project to the cost/ time Modification work affects project delivery
award of shutdown
time
Delay in Energization and Clearance of snags / defects Actions
Project Implementation Failure to deliver the Delay in project
17 NCC Power N-16503.1 2022-01-17 Clearance of snags / defects PAC which affects project 3 4 12 Transfer points shall be shared and 1 2 2 2023-04-12 Site Team Open
phase (Execution) project to the cost/ time milestone completion
delivery time monitored
Page 1 of 2
N-16503.1 - OHL WORKS 400KV SHAHAMA-MADINAT ZAYED, DHAMA-SHAMKHA
AND RELATED SUBSTATIONS MODIFICATION WORKS
PROJECT RISK REGISTER
Inhereent Risk Risk Treatment Residual Risk Risk expected
Division Risk Risk
Initiated Initiation Date Project Life cycle - Phase Probabili Impact Method Probabili Impact close date Risk
Sno
by
(Power/ Project No
( YYYY MM DD) /Stage
Risk Title (Description) Cause Event (Description) Effect
ty (P) (I)
Score (
( Accept, Mitigate,
Risk mitigations
ty (P) (I)
Score (
( YYYY MM DD
Risk Owner
Status
Water) P*I) P*I)
1-5 1-5 Transfer, Avoid) 1-5 1-5 )
1-25 1-25
Delay of interface works Delay in project milestone Regular Interface meetings to be
Project Implementation Failure to deliver the Delay in project
18 NCC Power N-16503.1 2022-01-17 (substation modification work to completion which affects 3 4 12 Mitigate carried-out with all Authorities / 1 2 2 2023-04-12 PM Open
phase (Execution) project to the cost/ time milestone completion
readiness for energization) project delivery time Contractors
Delay in performing /
Delay in project milestone Close Monitoring & Continuous Site Team /
Project Implementation Failure to deliver the submission of OPGW end to end Delay in project
19 NCC Power N-16503.1 2022-01-17 completion which affects 3 4 12 Mitigate follow with site team and 2 3 6 2023-03-12 Engineering Open
phase (Execution) project to the cost/ time test reports to substation milestone completion
project delivery time Engineering team Dept
modification work
Advance shutdown request to LDC
Non availability of OPGW Delay in project milestone
Project Implementation Failure to deliver the Delay in project
20 NCC Power N-16503.1 2022-01-17 shutdown / delay in diversion of completion which affects 3 4 12 Mitigate 2 3 6 2023-03-12 PM, Pln Eng Open
phase (Execution) project to the cost/ time milestone completion Reduce the no of shutdown /
telecom signals project delivery time
duration