Professional Documents
Culture Documents
Signed………………………… Signed…………………………
JH for Mott MacDonald Ltd. for TRANSCO
Note: The above comments and/or approval are made after checking in accordance with the Contract and technical Specification. These do not
relieve the Contractor from his obligation in the Contract to ensure conformance to the Specification. Any Specification deviations found
subsequent to approval are to be corrected by the Contractor to the satisfaction of TRANSCO/Engineer.
625206568.doc Page 1 of 1