Consulting Engineers

Abu Dhabi Office


PO Box 47094
Abu Dhabi
United Arab Emirates
400kV OVERHEAD TRANSMISSION LINES
FUJAIRA SS TO RAS ALKHAIMA SS
Facsimile +971-2-4457490
Telephone +971-2-4457470
CONTRACT NO. N 6318
DRAWING / DOCUMENT COMMENT SHEET
To : LARSEN & TOUBRO LIMITED. Fax No. 09 2380195
Attn : Mr Paradeep Srivastava

Copy : TRANSCO- Projects Division Manager By Hand


TRANSCO- Power Projects Department Manager
Attn. Mr. Gaber Mohammad Abdelbary, Project Manager By Hand
Head of Operation and Maintenance, Al Ain, Fax No. 03 7613226
MML Site Office, Fax No. 09 2380184
Doc. Transmittal Ref. : DTS-354 Comment Sheet Ref. : CS-354
Submission Date : 11/12/2010 Date : 16/12/2010
Receipt Date : 13/12/2010 MML Previous CS No. : -

Item CSD No. Comment


Title / Details Rev. Status Ret.
No. N – 6318 attached
1 Pile Centre Marking Drawing
a For Tower Type ‘S(0º-2º)’ EF-7620-S-0025 0 AEN No Yes
b For Tower Type ‘AT(0º-30º)’ EF-7620-S-0026 0 AEN No Yes
c For Tower Type ‘BAT(0º-30º)’ EF-7620-S-0027 0 AEN No Yes
d For Tower Type ‘AT(H)(0º-30º)’ EF-7620-S-0028 0 AEN No Yes
For Tower Type ‘BAT(60º-90º)
e EF-7620-S-0029 0 AEN No Yes
/DE(0º-45º)’
Status: As per TRANSCO Contract Document
A = Approved, AEN = Approved Except as Noted, NA = Not Approved, NR = Approval Not Required
Ret = Drawing returned with this comment sheet (Yes/No)
Comments:
1. The back to back dimension on BAT/DE+9m should be 18204mm instead of 16204mm.
2. BAT/DE drawing: The dimension ‘F’ should be 478.5mm instead of 474mm to match with stub
GA drawing.
_____________________________________________________________________________
MML Check/Review
Engineer

Signed………………………… Signed…………………………
JH for Mott MacDonald Ltd. for TRANSCO
Note: The above comments and/or approval are made after checking in accordance with the Contract and technical Specification. These do not
relieve the Contractor from his obligation in the Contract to ensure conformance to the Specification. Any Specification deviations found
subsequent to approval are to be corrected by the Contractor to the satisfaction of TRANSCO/Engineer.