PROJECT NAME: CONNECTION OF NEW AL ARID S/S 8357 WITH 132KV UGC

NETWORK, RIYADH AREA


OHS-PR-09-10 (AL ARID)-F21
HEAVY EQUIPEMENT AND OPERATOR REGISTER

Area/ Location Al ARID 132KV SITE Contractor AL OJAIMI

Prepared By / Signature ARJUN GAIKWAD Date of Update 10.04.2022

Equipment/Machinery Details
Equipment Type /
3rd Party Cert.
SN Equipment No. Operator/Driver Name Maker & Serial Number Task Remarks
Expiry
Model
01 E 116 MAHENDRA HANSRAJ EXCAVATOR THEDCR0P0 30-08-2022 EXCAVATION OK
0000629
02 E 126 PRABHAKAR RAY MAJHI EXCAVATOR THEDCRD0 16-03-2023 EXCAVATION OK
V00000725
03 L-50 MUHAMMAD SUMAN LOADER 33Z02562 24-08-2023 LOADER OK
04 H-141 HUSSAIN JAHANGIR ROLLER 1014606217759 15-11-22 COMPACTION OK
COMPACTOR
05 CR-8 AKRAM KHOAG BOOMTRUCK 0704-00306 06-08-22 LIFTING OK

Page 1 of Rev.2 [08-April- Projects Business


PROJECT NAME: CONNECTION OF NEW AL ARID S/S 8357 WITH 132KV UGC
NETWORK, RIYADH AREA
OHS-PR-09-10 (AL ARID)-F21
HEAVY EQUIPEMENT AND OPERATOR REGISTER

Operator/Driver Details
Operating Competence Certificate Validity of Competence
SN ID / Iqama No. Name of Operator
Machinery (Number) Certificate
1 2467209934 MAHENDRA HANSRAJ E 116 RD202200003 05-03-2023
2 2473463905 PRABHAKAR RAY MAJHI E 126 RD202200004 05-01-2023
3 2447017704 MUHAMMAD SUMAN L-50 RD202200047 23-01-2023
4 2378100321 BABAR HUSSAIN HAKIMDIN H-141 RD202100754 1-12-2022
5 2468061940 AKRAM KHOAG CR-8 RD202200159 16-03-2023
6
7
8
9

Safety Officer Name: ARJUN GAIKWAD Signature: Date: 10.04.2022


(Verified By)

Project Manager Name: MAHMOUD TELLAWY Signature: Date: 10.04.2022


(Accepted By)