This document outlines safety procedures for FOC splicing and cable termination work inside substations. It lists the key steps of the job, associated hazards at each step, and required controls to minimize or eliminate those hazards. The main hazards identified are hand injuries from sharp edges, slips and trips, and manual handling injuries. The key controls specified are conducting a toolbox talk before starting work, using correct lifting techniques and adequate resources, ensuring a clear walkway, providing manual handling training, and using proper personal protective equipment. The safety procedures were compiled by two safety engineers and approved by a manager.
This document outlines safety procedures for FOC splicing and cable termination work inside substations. It lists the key steps of the job, associated hazards at each step, and required controls to minimize or eliminate those hazards. The main hazards identified are hand injuries from sharp edges, slips and trips, and manual handling injuries. The key controls specified are conducting a toolbox talk before starting work, using correct lifting techniques and adequate resources, ensuring a clear walkway, providing manual handling training, and using proper personal protective equipment. The safety procedures were compiled by two safety engineers and approved by a manager.
This document outlines safety procedures for FOC splicing and cable termination work inside substations. It lists the key steps of the job, associated hazards at each step, and required controls to minimize or eliminate those hazards. The main hazards identified are hand injuries from sharp edges, slips and trips, and manual handling injuries. The key controls specified are conducting a toolbox talk before starting work, using correct lifting techniques and adequate resources, ensuring a clear walkway, providing manual handling training, and using proper personal protective equipment. The safety procedures were compiled by two safety engineers and approved by a manager.
DEPARTMENT SAFETY EMPLOYEE JOB TITLE SAFETY ENGINEER
JOB/TASK TITLE FOC Splicing/Cable Termination works inside Hajar/Nujha S/S STEPS HAZARDS CONTROLS REQUIRED TO OBSERVATION STEP# LIST ALL STEPS IN PERFORMING THIS TASK IN EACH STEP , WHAT MINIMIZE /ELEMINATE HAZARD COULD CAUSE INJURY,LOSS DAMAGE INTERUPTION, OR POLUTION? 10. Installation of Link box 1. Hand Injury due 1. TBT should be to Sharp edges conducted by the 2. Slip and trip supervisor before start the work. 2. Adopt correct lifting techniques, use adequate resource and ensure clear walk way. 3. All person to receive manual handling training prior to start the work. 4. All person must be in Proper PPE's
COMPILED BY Mr Shariq, Mr.Emad DATE 02- July-2020
MANAGER MANAGER
Prepared by: Approved by: Element 5.19 Page No: Page 1 of 1 Revision No: 00 Reference No: