JOB TITLE / AIM: Construction of E & P workshop includes Welding, grinding, and gas cutting at Del camp
JSA DATE:03 /07/2006 JSA NO./ REVISION: 116
SUPERVISOR/ JSA LEADER: Imtiaz Ghani SCRIBE: Hernand Suyom
PARTICIPANTS : Amir Khan, Abdullah Khan, M. Ali
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of Equipment
• Crane
• Welding machine
2. Welding, grinding and cutting job for structural support
3. Lifting of Roofing Green mesh
4. Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of the following Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
equipment site that the E &P Personnel got inspected the
1. Welding machine equipment. Checklist are in equipment
2. Crane Ensure structural design certification in place
approved by the BHP person
Ensure no person shall go at the top roof without
any proper access/ protection
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.
The use of leather gloves and proper lifting
techniques are required
Workers starting the job unfit to work Ensure fitness certificate issued by descon doctor
is in place for all persons. Especially workers
nominated for working at height. All personnel
not fit to work shall not be allowed to work at the
project site.
Workers starting the job without permit BHPB approved JSA must be in place prior to
work commencing. Ensure all the persons take
part in the tool box meeting discussion. All
Persons to participate signed at the back of JSA
on daily basis
Proper checking of welding cable wire with tag
and grounding must be done.
Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves. Ensure trolley are
secured with stable support
Underground services/Nil Ensure that underground services properly marked
and identified by small signages
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
2 Welding, grinding and cutting job Exposure of workers to various hazard like Ensure workers are complying with the min. PPE
for structural support hand injury, dust, eye injury req..Safety shoes, helmet, safety glass, dust mask,
Heat Stress/Exhaustion Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
Fall Hazard Ensure proper platform and welders must wear
full body harness equipped with dual shock
absorbing lanyard and scaffold hooks 100% tie.
Off procedures shall be used at all times
Only BHPB approved harness shall be used
Ensure sufficient manpower during erection of
Hand injury/skin burns support

Eye injury Hand gloves and welding gloves should be worn

Fire & explosion Ensure workers are wearing both the eye goggles
& face shield/welding mask

DCP fire extinguisher must be present at the area


at all times.
Hi-vest must not be worn during welding
operation
Ensure that no flammable/combustible materials
are on the area.
Ensure that whenever using the gas cutting outfit
flash back arrestor is present
Bystanders Ensure that area was secured and properly
barricaded
Fall of materials Ensure that cutting shall not be undertaken at
height
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Snake bite Workers will inform and be aware about the
presence at the area. No killing of snakes
Unskilled and uninducted personnel starting Ensure that toolbox meeting was regularly
the job conducted and people are aware of the job and the
hazard enclosed in the job they are performing
Ensure workers are not wearing hi-vest and loose
dress/scarf while performing welding job
Electrocution Ensure proper checking and grounding of welding
machine.
Tripping hazards Ensure proper staging of welding materials have
proper barrication if necessary & that workers are
accessing the right walkway.
Personnel interface Other worker not involve in the job must not
come closer to the area\

Equipment Failure Ensure that equipment was check in daily basis


and checklist available at the equipment
Ensure proper access and egress for all vehicles
Pinch point hazard Ensure that no grinders shall used with positive
lock. Ensure it was color coded and inspected
prior to use
Back injury Ensure proper handling and positioning while
hauling a materials
Ensure that equipment was check in daily basis
3. Lifting of Roofing Green mesh Equipment Failure and checklist available at the equipment
Ensure proper access and egress for all vehicles

Material fall down Ensure mesh properly tied to the crane hook and
for people holding the tag line at four side
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Bystanders Area to be secure and barricade

Strong wind Ensure all worker wear the dust mask during the
strong wind start
Ensure that no lifting will be done when strong
wind arrive

4.. Demobilization Poor housekeeping Ensure area left clean and tidy