JSA (Job Safety Analysis) Sheet

JSA NO
Activity Name:- Shot Blasting Operation

Location:- Date :
Project No.
Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Only inducted worker shall be deputed at the work place.

Untrained Given Tool Box Talk to all workers.


1 Manpower Mobilization worker,lack of skill Personal injury
awareness Required work permits should be taken before start of activity

Work Shall be carried out under continuous Supervision.

personal Ensuring safe stack height (1.5 mtrs).


2 Stacking of material Fall of material injury/Wastage of Ensure area clearance.
material.

Equipment shall be inspected by the safety officer.

Third party inspected and having valid form 12.


Ensure safety valve cut off pressure and it should be working
condition.
Ensure no damage of air hose.
Air Compressor Noise & Dust, air
3 Personal Injury
operation compressor bust
Ensure no damage of nozzle or any obstruction in it.

Working area shall be barricaded with safety sign


Ensure entry restricted for unauthorised person.

Employees shall wear safety PPE like safety shoes, full body apron,
safety goggles, ear plug, nose mask.

Night work permit to be taken from concern engg.and safety dept.


Darkness, fall of Ensure proper illumination during dark hours.
Personal injury,
4 Work during dark hours person, fall of Electrical cable should lead min 2 m height. No exposed electrical
damage to property
machinery wire.Earthing.
Route shall be illuminated.

RBIPL Structural Engg. RBIPL EHS Incharge Client/PMC


RBIPL Project Manager

Mr. Majid Mr. Inam Masuk Mr. Vinod Narkhede


Prepared by Review by Checked By Acknowledgement