JSA (Job Safety Analysis) Sheet

Ref-
Activity Name:- Bolts & template fixing
Location:- Date :

Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Only inducted worker shall be deputed at the work place.
1 Manpower Mobilization Untrained worker Personal injury
Given Tool Box Talk to all workers.
Evaluating the capacity of the dumper
Provision of banks man for guiding the process and stopper
2 Material shifting Fall/Slip/Trip Personal injury for vehicle.
Ensuring the level ground for unloading
Material stacking not less than 1.5 mtrs from the edge of the
pit .
Ensure template fixed with binding arrangement with
pedestal.
Fixing of bolts & Ensure sufficient manpower for carriage & fixing of bolts &
3 Fall of material Personal injury template at place
template
Ensure use of rubber gloves for fixing template
Ensure use of inspected tools & tackles
Night work permit to be taken from concern engg.and safety
dept.
Darkness, fall of
Personal injury, damage Ensure proper illumination during dark hours.
4 Work during dark hours person, fall of
to property Electrical cable should lead min 2 m height. No exposed
machinery
electrical wire.Earthing.
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :___________


Name & Signature of Site In-charge :___________

Name & Signature of Project In-charge :__________


Name & Signature of HSE Officer : ______