JSA (Job Safety Analysis) Sheet

Activity Name:- Plastering works Ref-

Location:- Date :

Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Only inducted worker shall be deputed at the work place.
Manpower Untrained worker,lack
1 Personal injury
Mobilization of skill awareness Given Tool Box Talk to all workers.
Use of Dust mask for handling dry cement.
Respirator hazard
Hazardous Material, Throughly wash the exposed body part with fresh water and soap
Skin Irritation
Skin contact,Eye after the work.
contact & Dust Use of PPE such as Safety shoes, gumboot,rubber handgloves,
goggle & nose mask.
height work permit must be obtained.
Errect proper scaffold on levelled rigid base.
Proper access to work place to be provided.
2 Plaster Work Material should stack properly near the work place
Area should be barricaded to control the unotherised entry.
Scaffolds,Fall of material, Cut Slip & Work area shall keep clean and tidy
person Impact
Use of proper PPEs such as safety shoes,gumboots,helmet,rubber
hand glovs,dustmask,ear plug
Provide rope for lifting / lowering material.
Scaffolding should be inspected by safety person before starting
the work
Night work permit to be taken from concern engg.and safety dept.
Darkness, fall of
Personal injury, Ensure proper illumination during dark hours.
3 Work during dark hours person, fall of Electrical cable should lead min 2 m height. No exposed electrical
damage to property
machinery wire.Earthing.
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________

Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______