Activity Name:- Pedestal Reinforcement Ref-
Location:- Date :
Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Only inducted worker shall be deputed at the work place.
Manpower Untrained worker,lack
1 Personal injury
Mobilization of skill awareness Given Tool Box Talk to all workers.
1.Head injury
Shifting 1.PPE Usage
2.Fall of material
4 reinforcement in the Personnel Injury 2.Trained people.
c.Wire piercing in the
pit finger
Uninspected FBSH Fall of person Inspected FBSH having double lanyard, shock absorber should be provided.
5 Working at height Scaffold shall be erected on even surface by providing base plate, side
Unapproved scaffold support, and ledger at every at 500mm with side supports wherever height
increases beyond 2 mtrs .
Use of PPE such as safety shoes, helmet PVC hand gloves, safety goggle and
cut, slip
shoulder pad.
Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________
Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______