You are on page 1of 2

JSA (Job Safety Analysis) Sheet

Activity Name:- Porta cabin loading & unloading by two


Hydra Ref-

Location:- Date :
Sr.N Sub-Activity
Type Of Hazard Risk(s) Involved Risk Control measures
o. Name
Only inducted worker shall be deputed at the work place.
Untrained
Manpower Given Tool Box Talk to all workers.
1 worker,lack of skill Personal injury
Mobilization
awareness Ensure Work permit during loading & unloading of Porta cabin
Fall of material from Injury to the persons Third party testing to be done for the Lifting derrick and other
height due to failure working below and tools & tackles like wire rope slings, chain pulley blocks for 2 times
of derrick or Chain surrounding areas. the actual weight of the heaviest material to be lifted. Regular
pulley block or wire Permanent disable or inspection of lifting tools & tackles before starting . Ensure only
rope slings for lifting fatality due to fall of inspected Hydra/Farana should use for loading and unloading of
Loading the material. material,Fatal, Injury, Porta cabin.Ensure Operator have valid Licence. Ensure guide rope
2 Unloading by Property damage shall use while lifting / loading/unloading of Porta cabin.work with
Hydra/Farana continuous supervision.
Area shall be made clear for any obstruction to the material.
Porta cabin shall be tied with rope at each end. Ensure path should
be clear from any obstruction

Night work permit to be taken from concern engg.and safety dept.


Darkness, fall of Ensure proper illumination during dark hours.
Work during Personal injury,
3 person, fall of
dark hours damage to property Electrical cable should lead min 2 m height. No exposed electrical
machinery
wire.Earthing.
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :___________Name & Signature of Site In-charge :___________