Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited
Risk rating
Proba
bility
Sl Basic Job Potential Consequen Current control measure Initial
No. Steps Hazard ce Risk
P E A R
Only skilled &experienced work men deployed in
the job with safety shoe ,hand gloves ,safety
Get Injury/ helmet and tested tools &tackles. Use guide rope
Fall of materials during shifting of materials and always keep away 1 0 0 1 3 6
Fatality
from swing area.Daily tool box talk before starting
of job by crew supervisor.
2of
Date Date Date
3of
Ri
Proba
bility
ual
Resid
risk
Additio
nal sk
control ra
measur ti
P
n E A R
e
g
4of
5of
6of
Risk Assessment/Management Form
Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited
Risk rating
Proba
bility
Sl Basic Job Potential Consequen Current control measure Initial
No. Steps Hazard ce Risk
P E A R
Only skilled &experienced work men deployed in
the job with safety shoe ,hand gloves ,safety
Get Injury/ helmet and tested tools &tackles. Use guide rope
Fall of materials during shifting of materials and always keep away 1 0 0 1 3 6
Fatality
from swing area.Daily tool box talk before starting
of job by crew supervisor.
8of
Date Date Date
9of
Ri
Proba
bility
ual
Resid
risk
Additio
nal sk
control ra
measur ti
P
n E A R
e
g
10of
11of
12of