1) Manually Material Fall of heavy material. Only skilled worker should allow for work.
loading & Unloading Slip & trip of Person All inducted worker are permitted for heavy
duty work.
Ergonomic hazard.
Area should be clear from obstacles.
Improper access /egress
All slippery material or waste material should
Pinch point & sharp edge.
be removing from access.
Inadequate illumination.
Lifting & shifting techniques should be use on
area.
Provide adequate illumination.
clear access & egress should be provide for
workers.
Job specific PPE provide.
2) Erection of Scaffolding Scaffold Collapse, Experienced persons should allowed for work.
Fall of Person Scaffold tag system must provide.
Slip & Trip of Person. Ensure all components are fixed to scaffold.
Electrocution Ensure Use of rope for material lifting &
Lowering.
Bad Planking
Do not stand below suspended load.
Back Injury.
Do not leave any loose material at height.
Dropping Componants.
Working Platform made with 600 mm width &
Secured both sides, with handrails.
Use of Full body Harness with Double lanyard is
ensured
No work on scaffold is allowed to carry out
during raining or immediate after rain.
Adequate illumination of 150lux is ensured at
workplace.
Planks Should be provided throught area.
10) Fabrication Work Eye Irritation. Keep fire extinguisher near Working area.
Fire Hazard. Ensure use of All PPEs.
Electric Shock. Provide fire blanket while welding.
Provision of proper barricading.
Provision of face shield.
Electric supply shall be taken through 30 mA
ELCB/RCCB & MCB
Continuous effective supervision shall be
provide by competent supervisor
PM EHSO