Professional Documents
Culture Documents
Ref-
Activity Name:- Erection of chuqured plate
Location:- Date : 1
Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Only inducted worker shall be deputed at the work place.
Manpower Given Tool Box Talk to all workers.
1 Untrained worker Personal injury
Mobilization Required work permits should be taken before start of activity
Work Shall be carried out under continuous Supervision.
Ensure only inspected Hydra should use for material shifting
Ensure only inspected & damage free web-belt or slings and gunny bag
Shifting of Fall of material, for sharp edge protection should use for material shifting
Personal Injury,
2 chuqured plate by fall of man, road Ensure path is clear from any obstruction
Fatal accident
Hydra accident, trap
Ensure guide rope fixed at both end
Ensure person who hold guide rope should walk 2mtr away from hydra
Name & Signature of Site Engineer / Supervisor :_________ Name & Signature of Site In-charge :___________
Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______