You are on page 1of 1

JSA (Job Safety Analysis) Sheet

Activity Name:- Fixing of glass at bridge Ref-

Location:- Date :

Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Untrained Only inducted worker shall be deputed at the work place.
1 Manpower Mobilization worker,lack of skill Personal injury
awareness Given Tool Box Talk to all workers.

Area barricade to restrict entry.

Ensure (FBSH)full body safety harness anchor by each workmen.


Fall of person,
2 Staging Personal Injury Cuplock verticals are checked against bending & breakages
material
Ledgers shall be placed at every 500mm & same shall be covered
with the cups.
Maintain good house keeping at work site.
Personal injury Person may get Use of basic PPEs.
injured
3 Moving on to scaffolding Fatal accidents Person may fall Height Work permit to be taken from SPCL safety officer
from height
One to one communication to be maintain at all time during work.

Ensure continuos supervision.


Ensure only inspected web belt and glass suction plate should use
for lifting of glass.
Personal Injury, cut Ensure tying of full length web belt vertically and horizontally on
Fall of material, fall
4 Fixing of glass injury, property glass for lifting.
of man
damage Ensure tools and material is not kept on walking plate.
Ensure area below the work is barricaded with signage
Ensure unauthourised enrty in barricated area
Ensure required PPE's.
Night work permit to be taken from concern engg.and safety dept.
Darkness, fall of
Personal injury, Ensure proper illumination during dark hours.
5 Work during dark hours person, fall of
damage to property Electrical cable should lead min 2 m height. No exposed electrical
machinery
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________

Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______

You might also like