JSA (Job Safety Analysis) Sheet

Activity Name:- Plastering to ceiling Ref-

Location:- Date :

Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Only inducted worker shall be deputed at the work place.
Manpower Untrained worker,lack
1 Personal injury
Mobilization of skill awareness Given Tool Box Talk to all workers.
Use of Dust mask for handling dry cement.
Respirator hazard
Hazardous Material, Thoroughly wash the exposed body part with fresh water and soap
Skin contact,Eye after the work.
Skin Irritation
contact & Dust Use of PPE such as Safety shoes, gumboot,rubber handgloves,
goggle & nose mask.
height work permit must be obtained.
Erect proper scaffold on leveled rigid base.
Proper access to work place to be provided.
Material should stack properly near the work place
2 Plaster Work Area should be barricaded to control the unauthorized entry.
Work area shall keep clean and tidy
Scaffolds,Fall of material, Cut Slip & Use of proper PPEs such as safety shoes,gumboots,helmet,rubber
person Impact hand glovs,dustmask,ear plug
Provide rope for lifting / lowering material.
Proper head room to be kept below slab, barication shall be
supported at proper interval.
Provision of covering on floors to collect the fallen mortar.
Scaffolding should be inspected by safety person before starting
the work
Night work permit to be taken from concern engg.and safety dept.
Darkness, fall of
Personal injury, Ensure proper illumination during dark hours.
3 Work during dark hours person, fall of Electrical cable should lead min 2 m height. No exposed electrical
damage to property
machinery wire.Earthing.
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________