You are on page 1of 2

JSA (Job Safety Analysis) Sheet

Ref-
Activity Name:-Tile Fixing.
Location:- Date :
Risk(s)
Sr.No. Sub-Activity Name Type Of Hazard Risk Control measures
Involved
Only inducted worker shall be deputed at the work place.
Untrained Given Tool Box Talk to all workers.
Personal
1 Manpower Mobilization worker,lack of skill
injury Required work permits should be taken before start of activity
awareness
Work Shall be carried out under continuous Supervision.
Ensure general work permit taken by engineer & verified by Safety dept.
Ensure safe Access whle unloading & stacking of material.
Unloading shall be done in presence of banks man.
Improper
Unloading & Stacking of Personal Ensure that the material shall not come in contact with skin.
2 unloading,Fall of
Bitumen primer . Injury.
person. Avoid unauthorised entry.
Workmen should be having nose mask, Rubber hand gloves,safety Goggel,and along with all
required PPEs
Unloading area should be identified provide caution sign boad.
Colouring of wall by Personal Workmen should be having nose mask, Rubber hand gloves,safety Goggel,and along with all
3 Improper Handling
using Bitumen primer. Injury required PPEs
Only inducted person should be deployed at work place.
Workmen should be having nose mask, leather hand gloves, long sleeve, leggaurd and coton apron
along with all required PPEs
Ensure Banksman while unloading of material.
Bitumen ,Unloading, Improper Handling, Personal
4 Provide hard barrication to area While hot work .
Stacking & Heating. Fall of person.,Fire Injury, Burn.
Ensure Hot work permit taken by engineer & verified by Safety dept.
Avoid unauthorised entry.
Supervisor should be present for guide.
Ensure appropriate fire Extinguisher is available at work place.
All hand tools should be inspected for its defect before it use.
Burn, Carry out periodic inspection and perventive maintenance of all hand tools.
Spreading of Bitumen by No person should be allow to stand or work while spreading of bitumen is carried out.
5 Improper PPE's Property
manualy
damage Only trained person shall be depolyed for the work.
All the hadntools should be stored at its designed place.

Personal Eye wash and hand wash facility along with soap should be avalible near job location.
Untrained
Leveling of Bitumen by injury, Only trained person should be deployed the work.
6 person,contact with
manualy Property Supervisor should be present for guide.
skin
damage Entry should be restricatd.
Personal Only inducted person should be deployed at work place.
Untrained
injury,
7 Tile Fixing person,Improper Workmen should be having nose mask, rubber hand gloves, safety goggele, along with all required
Property
Handling, PPEs
damage.
Work Shall be carried out under contineous Supervision.
Night work permit to be taken from concern engg.and safety dept.
Personal
Darkness, fall of
8 Work during dark hours injury, damage Ensure proper illumination during dark hours.
person,
to property
Electrical cable should lead min 2 m height.No exposed electrical wire.Earthing.
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________

Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______