Project HS Risk Assessment

Project Name: Sandvik Pvt Ltd


Activity: Painting Work

Major Work Activity Potential Hazards Risk Possible Controls Controlled


Score Risk Score
Site Access Security M  All visitors to sign in/out and all person should YES
General and Adjacent Neighbors, Public and employee’s injuries have ID tags while entry on site.
Tenancy Specific Site  Security guard present when physical and
Access electrical system is jeopardized.
 Maintain complaints procedure records.
 Obtain relevant council approvals and display
at site entry.
 Safety Induction should be conducted.
 Health check-up should be done before
entering site.
Project HS Risk Assessment

Major Work Activity Potential Hazards Risk Possible Controls Controlled


Score Risk Score
Vehicle movement at site Vehicle license should be check. M  Driver license should be check. YES
Ensure no use of mobile phone while driving.  Speed limits should be only 10 kmph while
Improper horn entering in gate.
 Stopper must be use.
 Vehicle parking should be designed near entry
gate.
 PPEs. safety helmet, safety shoes should be
wear driver while entry in material gate.
 Horn should be proper.

Mobilization of Man Unskilled person, personal injury, property M  Medical& physical fit workers shall be YES
power damage deploying for this activity
 Safety induction & site safety rules &
regulation shall be done prior to enter the site
 Mandatory & required PPEs shall be used by
all workers
 Gate pass for all the worker & staff shall be
provided
 Tool box talk shall be conduct before start the
activity
 Take work permit before start the activity
Material Handling Improper Handling H  Work permit must be taken prior to start the YES
Fall of material  Ensure Training on manual material shifting
Fall of person to workers by concern supervisors.
Project HS Risk Assessment

Improper Communication  Ensure all the person will properly have


Minor injuries trained.
Serious injury  Ensure PPE`s like hand Gloves, shoulder pad.
 Keep safe access & egress clean, neat & tidy

 Proper stacking of materials


 Use of appropriate PPEs such as nose mask,
safety goggles, rubber hand gloves, safety
shoes, helmet, etc.

Storage of Painting Spillage M  Ensure the paint should be placed on the safe YES
material Placing near access area during the painting activity.
Fire Hazard  Ensure no hot work activity is to be
performed near storage
 Signage and poster should be display.
 Keep safe access & egress clean, neat & tidy

 Proper stacking of materials


 Ensures availability of fire extinguisher.
 Training / briefing on MSDS to workmen.
 Fire extinguisher must be display in storage
area.
 Proper illumination should be provided.

Sanding of wall & Ceiling Dust inhalation M  Ventilation provided by opening doors or YES
Contact with skin windows in the work area, if available
Ventilation problem otherwise use fan
Project HS Risk Assessment

 job rotation to be done at regular intervals in


enclosed area.
 Use of appropriate PPEs such as nose mask,
safety goggles, hand gloves, face shield etc.

Paint mixing with thinner M  Use of PVC hand gloves while mixing the YES

paint.
Chemical contact with skin  Job specific training should be providing.
Etching hazard  Do not mix near hot work.
Paint / solvent spills on ground PPEs like – Nose mask, PVC hand gloves etc.
 Fire extinguisher to be placed near paint yard.

Paint of wall and ceiling Hazardous material M  Ventilation provided by opening doors or YES
Unskilled worker windows in the work area, if available
Fall, Slip, Trip otherwise use fan.
Fall of material  job rotation to be done at regular intervals in
Improper scaffold enclosed area.
 Do not store any flammable material in
painting area.
 PPEs- Nose mask, goggle, required
Working at height Fall of person/ fall of material from height. H  Work at height Training should conducted YES
Slip and trip hazard. before starting job.
Minor injuries  Only trained, authorized worker allowed to
work at height
 Use of fall prevention mechanism such as
safety harness, etc. wherever required.
 Use of fall protection devices such as
temporary work platforms or scaffolding,
Project HS Risk Assessment

wherever possible.
 Use of appropriate PPEs such as safety shoes,
hard hats, hand gloves etc.
 Securing or safe keeping, as appropriate, of
working.
 tools, material, equipment, etc. to be used
while working.
 Climb with both hands. If you need a tool or
materials, climb first and then have someone
pass the item to you
 Make sure you place the scaffold on a firm,
level surface
 Training / briefing of workmen on working at
height and use of all the above.

This HS Risk Assessment takes into account only those potential hazards that exist at the time it was conducted. A revised Risk Assessment will be
required if there is a significant change in working conditions, at critical stages during construction, or when High Risk Construction Work is
performed.

Signed: …………………………………. Print Name: ………………………………………… Date: ………………………