Mobilization of Man Unskilled person, personal injury, property M Medical& physical fit workers shall be YES
power damage deploying for this activity
Safety induction & site safety rules &
regulation shall be done prior to enter the site
Mandatory & required PPEs shall be used by
all workers
Gate pass for all the worker & staff shall be
provided
Tool box talk shall be conduct before start the
activity
Take work permit before start the activity
Material Handling Improper Handling H Work permit must be taken prior to start the YES
Fall of material Ensure Training on manual material shifting
Fall of person to workers by concern supervisors.
Project HS Risk Assessment
Storage of Painting Spillage M Ensure the paint should be placed on the safe YES
material Placing near access area during the painting activity.
Fire Hazard Ensure no hot work activity is to be
performed near storage
Signage and poster should be display.
Keep safe access & egress clean, neat & tidy
Sanding of wall & Ceiling Dust inhalation M Ventilation provided by opening doors or YES
Contact with skin windows in the work area, if available
Ventilation problem otherwise use fan
Project HS Risk Assessment
Paint mixing with thinner M Use of PVC hand gloves while mixing the YES
paint.
Chemical contact with skin Job specific training should be providing.
Etching hazard Do not mix near hot work.
Paint / solvent spills on ground PPEs like – Nose mask, PVC hand gloves etc.
Fire extinguisher to be placed near paint yard.
Paint of wall and ceiling Hazardous material M Ventilation provided by opening doors or YES
Unskilled worker windows in the work area, if available
Fall, Slip, Trip otherwise use fan.
Fall of material job rotation to be done at regular intervals in
Improper scaffold enclosed area.
Do not store any flammable material in
painting area.
PPEs- Nose mask, goggle, required
Working at height Fall of person/ fall of material from height. H Work at height Training should conducted YES
Slip and trip hazard. before starting job.
Minor injuries Only trained, authorized worker allowed to
work at height
Use of fall prevention mechanism such as
safety harness, etc. wherever required.
Use of fall protection devices such as
temporary work platforms or scaffolding,
Project HS Risk Assessment
wherever possible.
Use of appropriate PPEs such as safety shoes,
hard hats, hand gloves etc.
Securing or safe keeping, as appropriate, of
working.
tools, material, equipment, etc. to be used
while working.
Climb with both hands. If you need a tool or
materials, climb first and then have someone
pass the item to you
Make sure you place the scaffold on a firm,
level surface
Training / briefing of workmen on working at
height and use of all the above.
This HS Risk Assessment takes into account only those potential hazards that exist at the time it was conducted. A revised Risk Assessment will be
required if there is a significant change in working conditions, at critical stages during construction, or when High Risk Construction Work is
performed.