QUALITY CONTROL - WORKS INSPECTION ITEMS: Modular False Ceiling


REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt ltd G-Block
PACKAGE C&I packages
CONTRACTOR Architects Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE INSPECTION DATE
BOQ REF. NO. I-60 BY TIME
ZONE
ITEM DETAILS: Modular False Ceiling WING NO. G-Block NO.
LOCATION FOR
INSPECTION All Floor
SPACE
FLOOR NO. 3rd NO.

CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY


Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
1 Check for the Approved Shop drawing

2 Check for approved Make of Material

3 Check for Modular False tile size

4 Check for thickness of Modular False tile

5 Check for All the Frame work materials used as per specs

6 Check the frame is fixed over the surface

7 Check the clearance from Services Team

8 Check that the supporting of As per specification

9 Check the line.level and right angle of the Ceiling fixed

10 Check for the tile damage & Dirty

11 Check the Additional supporting for services

12 Check the provision for fixing of A/C grills & electrical fittings.

Observations if any :

Contractor/Vendor JLL Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Page 1 of 2
REQUEST DATE:
QUALITY CONTROL - WORKS INSPECTION ITEMS: Metal Ceiling
REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt Ltd G Block
PACKAGE C&I packages
CONTRACTOR Architects Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE DATE
INSPECTION
SAND-BOQ-INT-01 - I - BY
BOQ REF. NO. TIME
65
ITEM DETAILS: Modular Metal Ceiling
WING NO. G-Block
LOCATION FOR
INSPECTION Toilet
FLOOR NO. 3rd floor AREA Coromet, Projects

CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY


Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
1 Check for the Approved Shop drawing

2 Check for approved Make of Material

3 Check for Modular False tile size

4 Check for thickness of Modular False tile

5 Check for All the Frame work materials used as per specs

6 Check the frame is fixed over the surface

7 Check the clearance from Services Team

8 Check that the supporting of As per specification

9 Check the line.level and right angle of the Ceiling fixed

10 Check for the tile damage & Dirty

11 Check the Additional supporting for services

12 Check the provision for fixing of A/C grills & electrical fittings.

Observations if any :

Contractor/Vendor JLL Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :