Professional Documents
Culture Documents
Engineer Engineer
(Contractor)
CORRECTIVE ACTION IMPLEMENTED BY SITE, IF ANY
Engineer Engineer
(Contractor)
CHECKLIST FOR FIXING ALUMINIUM WINDOWS
SITE : Building/ location: Sr No:-
2 Check for PLUMB for the Window Frame w.r.t. Masonry Opening.
Engineer Engineer
(Contractor)
CORRECTIVE ACTION IMPLEMENTED BY SITE, IF ANY
Engineer Engineer
(Contractor)
Document No.: DRL/DOC/27/v1.0
Issue Date: 02/04/2012