Project Quality Plan (PQP)

Project No. 19 Project Name Project detail/ Location

Check list for Final Coat Painting (Internal)


Location : Sheet No . 1/1

S. No. Points to be verified Yes No N/A Remarks


1 Approval of painting system and colour as per individual
room received
2 Is the surface to be painted dry
3 Sequence of painting is correctly followed as per the
manufacturer recommendations
4 Electrical/ door ironmongery/flooring etc. protected from
dirtying during and after painting
5 Cracks on the surface are filled with proper filler
7 Sealing of wood knots in door frames is done
8 Rusted metal surfaces are properly treated and approved
9 paintavoid
To system is applied of paint, wall/ ceiling corners are
overlapping
protected with masking tape
10 Final coat paint is carried out with maximum care for the best
finish
11 Co-ordination with M & E services carried out as per the
check list
Other special requirements/Remarks:

NAME SIGNATURE DATE


Site Engineer
MEP Engineer
Project Engineer
Project Manager
HSEQ
QA/QC Incharge