Project Quality Plan (PQP)

Project No. 19 Project Name Project detail/ Location

Check list for Carpentry


Location: Sheet No.

S. No. Points to be verified Yes No N/A Remarks


1 Is the requirement of bitumen paint or wood preservative for
wood protection against termites met
2
Approved materials / samples / drawings are available at site

3 Has the protection for the finished surfaces been properly


provided
4
Is the type of fasteners ascertained from RE prior to the work
5 Is the method and material for concealing the fasteners been
decided with RE
Other special requirements/Remarks:

NAME SIGNATURE DATE


Site Engineer
MEP Engineer
Project Engineer
Project Manager
HSEQ
QA/QC Incharge