Project No. 19 Project Name Project detail/ Location
Check list for Carpentry
Location: Sheet No.
S. No. Points to be verified Yes No N/A Remarks
1 Is the requirement of bitumen paint or wood preservative for wood protection against termites met 2 Approved materials / samples / drawings are available at site
3 Has the protection for the finished surfaces been properly
provided 4 Is the type of fasteners ascertained from RE prior to the work 5 Is the method and material for concealing the fasteners been decided with RE Other special requirements/Remarks: