Civil4M Solutions LLP

Forum Project
Internal Plumbing Works

Flat No : Date :

Reference Drawings : Location:

Sr. Particulars Yes / No / Remarks


No. N.A.

Procedures to be followed before internal plumbing


1 Manufacturer's test certificate / Installation Guide available(CPVC)
2 Architectural / plumbing drawings available on site
3 Proper lighting arrangement ensured in dark areas
4 Toilet walls are marked with tile fixing positions
5 Toilet floor is marked with positions of EWC,Bath tub and other WC
fitting
6 Tile thiyyas are taken as specified to decide finished tile plane
7 Positions of flush tanks/Boiler marked on walls
8 Drainage outlet holes marked on walls
9 All trap positions marked
10 Chasing of masonry done as specified (cutter machine used)
Procedures to be followed during internal plumbing
1 CPVC pipes visually inspected for cracks
2 CPVC pipes are cut and installed as specified (round wheel cutter
used)
3 Solvent cement used for jointing CPVC pipes as specified (check for
expiry date)
4 Pipe inserted in fitting by rotating 1/4 to1/2 turn for even distribution of
solvent cement.
5 Plastic clamps from the same manufacturer used at approx.900mmc/c
(avoid metal clamps)
Procedures to be followed after internal plumbing
1 Pressure Testing carried out as specified (8-10 kg/sq.cm or 1 1/2 times
the design pressure)
2 Leakages, if any, are corrected after Pressure Test
3 Filling (rendering )of chases done using non-shrink grout and cured for
4 days.

Conclusion by Civil4M Representative - Activities Are Satisfactory / Not satisfactory

Contractor's Representative Civil4M Representative

Signature Signature