TILE WORK - WALL & FLOOR CHECKLIST

Project:

WIR Ref:

Client :

Checked Date

Consultant :

Inspection Date

Contractor :

Sub - Contractor:

Construction Drawing No (s) :


Building Zone:

Level:

Item/Structure Description:
Sr. No

Description

Approved Tile Material & Mortar/Glue

Calibration of the tiles checked, different


batches checked for variance in colour
shades

MEP services completed and confirmed


with MEP Sub-Contractor

Tiles soaked in clean water as specified

Mixing and application of dry mortar for


floors done to the specified slope

Mixing and application of adhesive done


as recommended by the manufacturer

Setting of tiles done as specified in the


shop drawings

Trimmers and spacers fixed at specified


places

Skirting / wall tiles laid as specified

10

Debonded tiles are replaced

11

Mixing and application of approved


colour grout done as recommended
by the manufacturer

12

Cut tiles are properly aligned

Grid Line:
Checked

Comments

YES NO NA

Must, if answer is 'NO'

Floor Tiles joints are matched with


wall tile joints
Cleaning and final inspection carried
14
out
Designation
Name
Company Signature
13

Civil Engineer

MEP Engineer

QC Engineer

Sub-Contractor

Date

Surveyour

Tile Work - Wall & Floor


Checklist

Rev:00