JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.
Page:-1
Rev:-02
JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.
Page:-2
Rev:-02
JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.
Page:-3
Rev:-02
JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.
Page:-7
Rev:-02
JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.
In case of Confusion Personal Give awareness about emergency evacuation plan, keep emergency
10
Emergency injury contact number. Aware about assembly point
Loose hose Slip & trip Ensure uncoiled hoses will not be a tripping hazard.
Ensure there are no kinks, cracks or damage to hoses.
Gas leak Explosion Ensure adjustment screws on regulators are backed off.
11 Argon Welding Check against hose pipe for gas leakage with soap water
Provide flash back arrester to cylinder both side
Dangerous Health effect Persons working should be trained
Fumes & gases Lungs disease Manage the work hours and duration to minimize fatigue
Page:-8
Rev:-02
JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.
Page:-9
Rev:-02
JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.
Page:-10