1.2 Shifting of material Over loading of winch Damage to winch 1.Safe Working Load should be followed strictly
through winch rope 2.Winch operation by only authorised operators.
Winch materials
3. Operation of winch should be stopped and
Heavy Wind may fly or get
resumed after wind speed is normal
disconnected
4. Third Party Inspection date for winches and Safe
Working Load should be displayed
Posibility of get
Fixing of brackets on top loose materials Fall from
5.0 hurt at ground
parapet wall of chimney heights level
2. Restricting unauthorised persons in to the chimney
Posibility of get area without informastion to ground incharge/ safety
Fixing of brackets on top loose materials Fall from inchharge
5.0 hurt at ground
parapet wall of chimney heights
level
3.Wear safety hardness & proper PPE's while working at
top of chimney
4.Electrical power & cables should be in good condition.