You are on page 1of 2

JOB SAFETY ANALYSIS

NW: REPAIRING AND PAINTING OF PHASE -II ( 2X 500MW )CHIMNEY


Work Permit Requirement: Permit must be obtained for working at height
Additional Precautions: 1.Competent Supervision / Executive Supervision. 2.Safety Steward deployment through out the work.
3.No work after sunset Agency: M/s XYZ Enterprises

Sl.No Sub task Hazard Risk Control Measures Check

Mobilization of tools and


1.0 tackles, materials,
manpower ..etc

1.All workers should have proper knowledge about work


Shifting of tools and Injuries in hands
1.1 Handling of materials tackles to site by hand or or legs in case of 2.Safe method of handling of tools and tackles
by 4 wheel trolley mishandling 3.Proper information in Tool Box Talk
4.Use of hand gloves, and PPE

1.2 Shifting of material Over loading of winch Damage to winch 1.Safe Working Load should be followed strictly
through winch rope 2.Winch operation by only authorised operators.
Winch materials
3. Operation of winch should be stopped and
Heavy Wind may fly or get
resumed after wind speed is normal
disconnected
4. Third Party Inspection date for winches and Safe
Working Load should be displayed

winch basket with


5. Proper guide rope has to be checked Daily. Operator
Material may get struck in materials can get
should ensure it while material basket is crossing every
landing platform hit with landing platform
platform
1.Safety induction training is mandatory to all workers
2.Vertigo test and height safety training is mandatory
Lack of job Possibility of 3.Only safety trained manpower is engaged
1.3 Man power
knowledge/Experience accidents 4.Competent supervisor is deployed for the work
5.Manpower should be minimum as possible to prevent
crowd in RSP
1.Drilling machine should be double insulated type and
healthy condition
2.Power cord in healthy condition without any joints
3.Drill bit should be in good condition
Exposure of live parts in 4.Power DB should have ELCB/RCCB
Electrical shock
drilling & buffing machine
5.Power cables are laid properly above the ground
Driling,buffing & fixing of without any stress over the cable
anchor bolts for tieing life
2.0
line ropes on the 6.Competent workers should be deployed for drillng
periphery of chimney operations

1.All workers should have double lanyard safety


Major injury harnesses and duly anchored to rigid anchoring points
Fall from heights /Lifeline all time while working on the Platforms
incidents

2.Strict Supervision and safety surveillance


Fixing of lifeline ropes in
Sharp ends of cables/rope
3.0 anchor bolts on periphery and rope rubbing naked Hand injury 1.Use of proper hand gloves (Preferably cut resistant
of chimney extention (pierce/cut) gloves)
platform hands

1.Hard Barricading upto 20M away from chimney


Injuries to men
moving on ground 2.Standby person to warn with whistle / Unauthorised
level persons should not enter chimney area.
Movement of workers on Corroded handrails may
4.0 break and fall on ground 3.Caution board display all four sides
outer platform level.
Fall of workers 1.Use of safety harness and anchoring to lifeline is must
from platform for all the workers on the platform
along with
handrail 2.Strict Supervision and safety surveillance

1.Tieing of tools & tackles while fixing of brackets

Posibility of get
Fixing of brackets on top loose materials Fall from
5.0 hurt at ground
parapet wall of chimney heights level
2. Restricting unauthorised persons in to the chimney
Posibility of get area without informastion to ground incharge/ safety
Fixing of brackets on top loose materials Fall from inchharge
5.0 hurt at ground
parapet wall of chimney heights
level
3.Wear safety hardness & proper PPE's while working at
top of chimney
4.Electrical power & cables should be in good condition.

1.Safe Working Load should be followed

2. TPI for RSP and SWL should be displayed

3. Check condition of RSP motors, breaks, safety lock as


mentioned in daily checklist.
5.1 Working of moving Rope Fall on materials and men Steel rope many 4. All Rope must be in good condition
Suspended Platform (RSP) get disconnected
5.Check electrical power and cables before starting of
work
6.Competent workers should be deployed for RSP
operations
7. Monitoring Workers Health condition on every
monday.
1.Hard Barricading around 30M away from chimney
2. Restricting unauthorised persons in to the chimney
area without informastion to ground incharge/ safety
Minor & major inchharge
6.0 Chipping of loose concrete Fall of materials accidents may
happen 2.Standby person to warn with whistle
3.Caution board display all four sides
4.Wear proper PPE's while working at ground level
5.RSP power cables should be covered safely at ground
level
1. Required compressor pressure should be monitored.
Minor & major
Blasting of hose and 2.Nozzles should be in good working condition
7.0 Water jetting accidents may
exposure of nozzles
happen
3.Competent workers should be deployed for blasting &
jetting operations with suitable PPEs.
1.Wear proper PPE's while working.
2.Flammable materials should be keep away from
chemical storage area
Plastering of mortar, Injuries and fire
Upper and lower body 3.Competent workers should be deployed for plastering,
7.1 Chemical treatments & affected accidents may chemical works & painting.
Painting happen
4. Fire extinguisher must be kept near by chemical
storage area with Sign board.
5. Monitoring Workers Health condition .

Prepared by Safety Review by Approved by