You are on page 1of 3

Mangala Central Polymer Facilities (CPF) Project

Job Safety Analysis For Structural Steel


Fabrication and Installation Activity
JOB SAFETY ANALYSIS WORK SHEET

FACILITY /
CPF ,Mangala-1 DATE : 05.07.2014 PAGE No: 1
SITE:

AREA JSA REF No/Doc


Mr. Prasad Kailange (CM-CIL) M205DCL1-CPF-N-PRO-5006
AUTHORITY: no:

DEPARTMENT /
SYSTEM / IETS/ CPF Mangala-1/ Rajasthan
LOCATION:

TASK DESCRIPTION: JOB SAFETY ANALYSIS TEAM (FIRST NAMED-JSA TEAM LEADER)

Structural Steel
NAME POSITION
Fabrication and Installation activity

Sanjay Sinha Civil Engineer

Shamsunder K HSE Coordinator

REFERENCES AND OTHER RELEVANT INFORMATION : (e.g.


Emergency Provision Required, Competency requirements, Tools &
JSA Reviewed
Equipment, P&ID’s, Drawings, Procedures, Certificates, other Job Safety
Analysis’s)

NAME
BV Perumal
(PRINT) :

POSITION : Construction Manager

DATE : 05.07.2014
Mangala Central Polymer Facilities (CPF) Project
Job Safety Analysis For Structural Steel
Fabrication and Installation Activity

Sl Sequence of
No operation Tools and Hazards Involved Control Measures / preventive Measures. Responsibility
Equipments / Action by
1. Handling of 1. USE OF 1. Human error 1. Carry out the work procedure / Method statement of Site Engineer /
structural LIFTING 2. Mechanical failure activity. Site supervisor
steel materials MACHINERY / condition 2. Follow CIL Work Permit system.
1. 2. Tandem lifting EQUIPMENT 3. Physical condition 3. Conduct TBT for all concerned workmen/staff before
for large and As Crane, (Weather, Loose starting the job.
heavy items Slings, compacted area, 4. Everyone must be aware about the assigned task along
3. Loading of belts, lifting etc.) with their risk involved.
structural tools and 4. Hoisting within 5. Use hard surface (Geotechnical survey of soil test to be
materials tackles. permissible limit done) is required.
4. Transportation 2. Welding 5. Improper signaling 6. All Lifting tools & tackles to be certified by Govt. Approved
of structural cutting 6. Illumination Third party.
steel materials grinding 7. Communication 7. All Crane / equipments must be inspected by CIL before
5. Unloading of tools & Error demobilization at site and regular maintenance and checks
structural equipments 8. Materials Handling 8. Required Use of qualified / competent Operator, Banks
steel materials 3. equipments 9. Failures of used men & Signalmen.
6. Access & for tools & tackles 9. Activity must be carried out under close supervision.
egress at site transporting 10. Failure of Access 10. No riding of the equipment other than Operator
7. Erection of the material & working 11. Load and hand tools securing arrangements.
structural platform. 12. Barricade the erection zone with proper signage’s & restrict
steel material 11. Fall of object the personnel entry in work area.
8. Work related 12. Fall from height 13. Always use the tag line to control the lifted materials.
awareness 13. Struck by or strike 14. Proper use of access/egress with working platform to be
9. Positioning of against any object made and it should be certified by competent person.
the column 14. Heat stress/hot 15. Use of adequate & required personnel protective
10. Working on weather equipments.
the erected 15. Adverse weather 16. Competent supervisor & crew and certified Operator.
steel structure. condition as heavy 17. Safe Procedure for rigging & Signaling must be followed if
11. Housekeeping wind, sand storm, required prepare the lift plan..
rain etc. 18. use of full body safety harness, lifelines, fall arrestors and
other PPE`s while working at height.
19. Ensure sufficient drinking water and rest shelter for workers
and staff. Follow IETS heat prevention plan.
20. Ensure emergency Preparedness as availability of
Mangala Central Polymer Facilities (CPF) Project
Job Safety Analysis For Structural Steel
Fabrication and Installation Activity
ambulance and paramedic service during work activity at
site.
21. Avoid / Stop all activities during adverse weather condition.
22. Ensure proper housekeeping at work site as per CIL \ IETS
environment management plan.